Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20098G8821 October 1984Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work
ML20098G8741 October 1984Affidavit of Br Shelton Re Integrated Design InspInternal Flooding
ML20098G88829 September 1984Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design
ML20098G88728 September 1984Affidavit of EM Hughes Re Idvp
ML20098G87828 September 1984Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse
ML20098G87928 September 1984Affidavit of RP Tuetken Re Readiness for Fuel Loading
ML20098G88328 September 1984Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept
ML20098G88128 September 1984Affidavit of Cw Dick Re Independent Design Review
ML20098G88527 September 1984Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1
ML20095F10718 August 1984Affidavit of KT Kostal Re Prefiled Testimony of C Stokes. Certificate of Svc Encl.Related CorrespondenceSafe Shutdown
Safe Shutdown Earthquake
Earthquake
Affidavit
Water hammer
ML20094S64216 August 1984Affidavit of Gt Klopp Re Wh Bleuel Proposed Testimony Concerning Need for Failure Modes & Effects Analysis. Certificate of Svc & Svc List Encl.Related CorrespondenceProbabilistic Risk Assessment
ML20080L06013 February 1984Affidavit of LO George Re Date Accumulated by Reinspection Program Final Rept.Evaluation Will Clearly Indicate That Quality of Work Performed Is Satisfactory.Certificate of Svc Encl
ML20079N40824 January 1984Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation.Notice of Appearance for Pp Steptoe,Notice of Withdrawal of Appearance for G Herrin,Rg Fitzgibbons & P Murphy & Certificate of Svc Encl
ML20079N39724 January 1984Affidavit of C Reed Re Const Status & Target Fuel Load Dates
ML20083J6236 January 1984Affidavit of L Delgeorge Re Reinsp Program.Certificate of Svc Encl
ML20080R11010 October 1983Affidavit of DD Ed,Clarifying Testimony Re EPA Rept, Protective Action Evaluation Part Ii,Evacuation & Sheltering as Protective Actions Against Nuclear Accidents Involving Gaseous Releases
ML20076J10914 June 1983Affidavit of DC Thomas Supporting Extension Until 830628 to File Proposed Findings of Fact & Conclusions of Law Re Contentions 22 & 9(c).Time Needed Due to Heavy Trial & Teaching Schedule.Certificate of Svc Encl
ML20074A77111 May 1983Affidavit of RP Tuetken on J Hughes Allegations Re Welding. Welding of Brace to Pressure Pipe Proper,If Performed Per Design Specs.Util Conducting Reinsp of Work Performed by Contractor QC Inspectors
ML20064N42110 February 1983Affidavit of KA Ainger Re Changes to Plant Design to Mitigate Potential for KRSKO-type Bubble Collapse Water Hammer in Feedwater Bypass Line.Westinghouse Ltr, Bypass Drawing & Notice of Appearance by Vg Copeland Encl
ML20028B9058 November 1982Affidavit Re Westinghouse Application for Withholding Proprietary Info Encl in App C to FSAR in TR Tramm 820818 & 0902 Ltrs to NRC Concerning Turbine MissilesTurbine Missile
ML20027C5435 October 1982Affidavit of La Bowen.Util Does Not Intend to Install Temp Sensors on Feedwater Bypass Sys Piping.Existence of Constant Feedwater Flow Precludes Water Hammer Event Similar to Event at Krsko
ML20058G86030 July 1982Affidavit Consisting of Documents Supporting Response in Opposition to NRC Motion for Summary Disposition of Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 9c.Certificate of Svc Encl
ML20058E22926 July 1982Affidavit of Jc Petersen on Waiver of or Exception to Financial Qualification Regulations.League Petition & Exhibits Do Not Demonstrate Special Circumstances Warrant Exception to Financial Qualification RegulationsAffidavit
ML20058E20126 July 1982Affidavit of DA Nash.Rockford League of Women Voters Exhibits Do Not Substantiate Claim of No Need for Power or Existence of Alternative Energy Sources.Prof Qualifications & Certificate of Svc EnclAffidavit
ML20069C89419 July 1982Affidavit of DD Malinowski on Contention 9c Re Various Phenomena Affecting Steam Generator Tube Integrity & Water Chemistry Measures to Be Taken to Eliminate or Minimize Adverse Effects of PhenomenaStress corrosion cracking
Eddy Current Testing
Flow Induced Vibration
Affidavit
ML20069C89919 July 1982Affidavit of EM Burns on Contention 9c Re Flow Induced Vibration & Tube Wear in Preheater Section of Westinghouse Model D Steam GeneratorsFlow Induced Vibration
ML20058G95719 July 1982Affidavit of Ej Sternglass.Cumulative Affects of Radioactive Release from Reactors Located in Northern Il Should Be re-evaluated.EPA Min Dose of Radiation Probably Cannot Be Met for Some Local PopulationsAffidavit
ML20054M9439 July 1982Affidavit of Aw Serkiz Re Dekalb Area Alliance for Responsible Energy/Sinissippi Alliance for Environ Contention 9(a).NRC Has Not Completed Evaluation of Krsko Plant Water Hammer Event.Certificate of Svc EnclAffidavit
ML20054M9419 July 1982Affidavit of MP Phillips Re Dekalb Area Alliance for Responsible Energy/Sinissippi Alliance for Environ Contention 3(e) on Worst Case Weather Evacuation Planning. Util Committed to Provide Revised Evacuation Time EstimatesAffidavit
ML20054M9281 July 1982Affidavit of Wl Forney Re Dekalb Area Alliance for Responsible Energy/Sinissippi Alliance for Environ Contention 1.Util Performance Compares Favorably W/Other LicenseesSystematic Assessment of Licensee Performance
Affidavit
ML20054E7777 June 1982Affidavit of Rj Netzel Re Contention 9(d).Steam Generator & Reactor Coolant Pump Support Design Took Into Account Fracture Toughness Properties of Matls Making Up Supports. Certificate of Svc Encl
ML20054E7517 June 1982Affidavit of GP Lahti Re Contention 2.Describes Regulatory Criteria Considered in Analyzing Cumulative Routine Releases from Plant & Other Nuclear Plants in Il.Design Objectives Considered DescribedOffsite Dose Calculation Manual
Affidavit
ML20054E7537 June 1982Unexecuted Affidavit of Ji Fabrikant Re Contention 2 on re-evaluation of Health Effects of Projected Routine Release of Radioactivity for Residents of Dekalb,Sycamore & Rockford AreasAffidavit
ML20054E7557 June 1982Affidavit of G Klopp Re Contention 2A.Incremental Risk from Nuclear Accidents to Area Residents Cannot Be Zero.Risk Should Be Determined by Risk from Byron.Other Plants Pose Insignificant RiskProbabilistic Risk Assessment
ML20054E7607 June 1982Affidavit of T Tramm Re Contention 7 That Util Will Comply W/New Regulatory Requirements on Hydrogen Control/Generation MattersFuel cladding
Affidavit
ML20054E7676 June 1982Affidavit of La Bowen Re Contention 9(a)on Water Hammer. Possible Courses of Action Being Discussed,Including Westinghouse Recommendations Re Krsko Plant EventsAffidavit
Water hammer
ML20054E7664 June 1982Affidavit of RW Carlson Re Contention 9(a) on Water Hammer. Steam Generator Bypass Sys Design,W/Listed Mods,Is Adequate to Minimize Likelihood of Bubble Collapse Waterhammer Events in Steam Generators to Acceptable Level
ML20054E7724 June 1982Affidavit of Rj Netzel Re Contention 9(b).Reactor Vessel Supports Designed for Asymmetrical Blowdown Loads & Stress Limits within ASME Boiler & Pressure Vessel Code Allowable
ML20054E7684 June 1982Affidavit of R Pleniewicz Re Contention 9(a).Operating Procedures Re Operation of Feedwater Bypass Sys Will Implement Westinghouse RecommendationsIncorporated by reference
ML20054E7634 June 1982Affidavit of Jc Blomgren Re Contention 8.Primary Sys Decontamination Would Result in No Significant Adverse Impact to Human Environ Quality
ML20054E7594 June 1982Affidavit of Hm Ferrari Re Contention 6.Concerns Raised Carefully Considered & Reviewed in Fsar.Sufficient Assurance Exists to Assure Containment of Radioactive Matls Under Worst Postulated DBAFuel cladding
Affidavit
ML20054E7584 June 1982Affidavit of G Klopp Re Contention 4.Intervenor Interpretation of Single Failure Demonstrates Misunderstanding of NRC Requirement on Accident AnalysisProbabilistic Risk Assessment
Design basis earthquake
Failure to Scram
Affidavit
Water hammer
ML20054E7574 June 1982Affidavit of Jc Golden Re Contention 3.Plant Emergency Plan Provides Reasonable Assurance Prompt & Effective Actions Will Be Taken to Protect Public Health & SafetyFailure to Scram
Affidavit
Water hammer
Potassium iodide
ML20054E7333 June 1982Affidavit of C Reed Re Contention 1.Expresses Util Strong Commitment to Safe Plant Operation to Protect Public Health & Safety & to Operate Plant within NRC & Other Requirements
ML20054E7733 June 1982Affidavit of WT Bogard Re Contention 9(b).Asymmetric Blowdown Loads Adequately Addressed in Plant Design
ML20054E7503 June 1982Affidavit of R Querio Re Personnel Qualifications,Personnel Commitment to Plant Safety & Plant Plans for Packaging & Transport of Waste Matls.Plant Has Necessary Technical QualificationsNon-Destructive Examination
Process Control Program
Affidavit
ML20054E7473 June 1982Affidavit of Wj Shewski Describing Util QA Program.Util History of Compliance W/Applicable QA Criteria Does Not Indicate Util Unwilling or Unable to Operate Plant Safety
ML20054E7393 June 1982Affidvait of Wl Stiede That Specific Incidents Listed in Contention 1 Do Not Prove Util Unable or Unwilling or Lacks Technical Qualifications to Operate Plant SafelyHigh Radiation Area
Inattentive
Overexposure
Affidavit
ML20054M93325 May 1982Affidavit of Jr Creed on Dekalb Area Alliance for Responsible Energy/Sinissippi Alliance for Environ Contention 1(f).Allegations Re Security Violations at Quad Cities ResolvedAffidavit
ML20039C24821 December 1981Affidavit of Mm Cherry Per ASLB 811208 Order Re 790926 Meeting.Affidavit Never Implied or Stated That Position in Case Was for Purposes of Delay