Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations23 March 2023Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan18 April 2022Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management PlanScaffolding
RS-22-014, Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time24 March 2022Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time
RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements30 June 2021Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsPacking leak
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
RS-21-032, Amended Decommissioning Trust Agreements25 February 2021Amended Decommissioning Trust AgreementsExemption Request
RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations24 February 2021Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-1010 February 2021Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10
RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values20 January 2021Request for License Amendment to Revise Degraded Voltage Relay Allowable ValuesSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Grace period
RS-20-052, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4b30 April 2020Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Extended Completed Times-RITSTF Initiative 4bHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Tornado-Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Tornado Missile Protection
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
TORMIS
Earthquake
Maintenance Rule Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Failure to Scram
RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems13 April 2020County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling SystemsHydrostatic
Surveillance Frequency Control Program
Power Operated Valves
RS-19-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations1 April 2019Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
RS-19-022, License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs)1 March 2019License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs)
RS-16-197, License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair30 September 2016License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump RepairSafe Shutdown
High winds
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Maintenance Rule Program
RS-16-040, Report on Status of Decommissioning Funding4 February 2016Report on Status of Decommissioning FundingDecommissioning Funding Plan
ML16008A11720 January 2016U.S. Nuclear Regulatory Commission Analysis of Excelon Generation'S Decommissioning Funding Status Report
RS-15-094, (EGC) - Submittal of Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations31 March 2015(EGC) - Submittal of Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
RS-15-077, Submittal of Updated Site Specific Safstor Decommissioning Cost Estimates for Braidwood, Byron and LaSalle Stations19 February 2015Submittal of Updated Site Specific Safstor Decommissioning Cost Estimates for Braidwood, Byron and LaSalle Stations
ML13161A2233 June 2013Byron and Braidwood, Units 1 and 2 - License Renewal Application
RS-13-106, (EGC) Amended 2011 Report on Status of Decommissioning Funding for Reactors and Correction to July 27, 2011 RAI Response12 April 2013(EGC) Amended 2011 Report on Status of Decommissioning Funding for Reactors and Correction to July 27, 2011 RAI Response
RS-13-100, Report on Status of Decommissioning Funding for Reactors1 April 2013Report on Status of Decommissioning Funding for Reactors
RS-13-064, Submittal of Updated Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate1 March 2013Submittal of Updated Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate
ML12066049430 March 2012Issuance of Amendments Revision of Technical Specifications (TS) 3.3.1, Reactor Trip System Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation (TAC ME5836...Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Surveillance Frequency Control Program
Earthquake
Fire Protection Program
ML10012024111 January 2010Submittal of Braidwood Station Site-Specific Safstor Decommissioning Cost EstimateBoric Acid
Fuel cladding
Fire Watch
Scaffolding
RS-09-157, Submittal of Site-Specific Safstor Decommissioning Cost Estimate16 November 2009Submittal of Site-Specific Safstor Decommissioning Cost EstimateBoric Acid
Fuel cladding
Fire Watch
Scaffolding
RS-09-114, Site-Specific Safstor Decommissioning Cost Estimate27 August 2009Site-Specific Safstor Decommissioning Cost EstimateFuel cladding
Fire Watch
Scaffolding
ML09212016529 July 2009Decommissioning Funding Assurance PlanDecommissioning Funding Plan
RS-09-095, Decommissioning Funding Assurance Plan29 July 2009Decommissioning Funding Assurance PlanDecommissioning Funding Plan
RS-09-041, Submittal of Exelon Generation Company, LLC, Report on Status of Decommissioning Funding for Reactors Owned by EGC31 March 2009Submittal of Exelon Generation Company, LLC, Report on Status of Decommissioning Funding for Reactors Owned by EGC
RS-08-036, License Amendment Request to Revise Containment Tendon Surveillance Program9 April 2008License Amendment Request to Revise Containment Tendon Surveillance ProgramNondestructive Examination
Incorporated by reference
RS-06-176, Site-Specific Decommissioning Cost Estimates18 December 2006Site-Specific Decommissioning Cost EstimatesBoric Acid
Scaffolding
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.810 June 2003Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8Squib
RS-02-045, Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray Nozzles19 April 2002Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray NozzlesForeign Material Exclusion
ML02088011519 March 2002Request for a License Amendment to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event for Byron and Braidwood StationAnticipated operational occurrence
Fuel cladding