ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection4 November 2022Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice InspectionHydrostatic
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
License Renewal
EVT-1
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML22293A24420 October 2022COL Docs - FW: Public Copy - ASME Code Alternative Request Drafts VEGP 3&4-ISI1-ALT-17 (Non-Proprietary) and VEGP 3&4-ISI1-ALT-18 (Non-Proprietary)Hydrostatic
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
License Renewal
EVT-1
Liquid penetrant
Dissimilar Metal Weld
DM weld
Affidavit
ML22293B10620 October 2022COL Docs - FW: Public Copy - ASME Code Alternative Request Drafts VEGP 3&4-ISI1-ALT-17 (Non-Proprietary) and VEGP 3&4-ISI1-ALT-18 (Non-Proprietary)Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Stress corrosion cracking
License Renewal
Liquid penetrant
Dissimilar Metal Weld
DM weld
Affidavit
NL-19-0832, EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.31 December 2019EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.Hydrostatic
Nondestructive Examination
VT-2
Finite Element Analysis
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
Exemption Request
Through-Wall Leak
Scaffolding
Thermal fatigue
NL-19-0712, Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R2026 June 2019Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R20Eddy Current Testing
Affidavit
ML17006A10926 January 2017Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange InspectionIncorporated by reference
NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.04 August 2016Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0Finite Element Analysis
Stress corrosion cracking
Weak link
ML14030A57020 March 2014Request for Alternatives VEGP-ISI-ALT-06Probabilistic Risk Assessment
Incorporated by reference
ML10287003016 November 2010Safety Evaluation of Relief Request VEGP-ISI-ALT-03, Version 3.0, for Reactor Vessel Nozzle to Safe-End Dissimilar Metal Weld and Adjacent Austenitic Safe-End Weld ExaminationsIncorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML10209066230 July 2010Request for Additional Information Regarding Relief Request Vegp-ISI-Alt-03, Version 2.0Stress corrosion cracking
NL-10-0706, VEGP-ISI-ALT-03, Version 2, Proposed Alternative for the Third ISI Interval7 April 2010VEGP-ISI-ALT-03, Version 2, Proposed Alternative for the Third ISI IntervalStress corrosion cracking
Dissimilar Metal Weld
NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.012 October 2009Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0Non-Destructive Examination
Mission time
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Flow Accelerated Corrosion
Intergranular Stress Corrosion Cracking
Large early release frequency
Stress corrosion cracking
License Renewal
Commercial Grade
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
Thermal fatigue
Water hammer
ML09337030912 October 2009Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0Non-Destructive Examination
Mission time
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Flow Accelerated Corrosion
Intergranular Stress Corrosion Cracking
Large early release frequency
Stress corrosion cracking
License Renewal
Commercial Grade
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
Thermal fatigue
Water hammer
ML06277035929 September 2006Evaluation of Relief Request ISI-GEN-ALT-06-02Incorporated by reference
Dissimilar Metal Weld
ML20196E48430 November 1998Requests NRC Authorization of Alternate Examination Per Provisions of 10CFR50.55a(g)(6)(ii)(A)(5) for One (1) RPV Shell Weld (21201-V6-001-W06)Nondestructive Examination
Scaffolding
ML20248D02926 May 1998Responds to 980410 RAI Re Rev 8 to Vogtle Electric Generating Plant,Unit 1 (VEGP-1) First ten-year ISI Program. Revised Requests for Relief RR-2,RR-3 & RR-63 Provided as Rev 9Non-Destructive Examination
Nondestructive Examination
Scaffolding
Backfit
ML20248D51021 May 1998Requests Authorization of Alternative Exam for RPV Shell Welds,Per Provisions of 10CFR50.55(g)(6)(ii)(A)(5).Info & Justification Re Request,EnclNondestructive Examination
Scaffolding
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilitySafe Shutdown
Unanalyzed Condition
Fitness for Duty
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Exemption Request
Pressure Boundary Leakage
Backfit
Operational leakage
ML20055F1245 July 1990Inservice Insp Final Rept,Second Refueling Outage (Period 1 /Interval 1), Vols 1 & 2Boric Acid
Anchor Darling
Nondestructive Examination
VT-2
Finite Element Analysis
Feedwater Heater
Eddy Current Testing
Liquid penetrant
ML20195J91911 November 1988Rev 4 to ISI-P-010, Preservice Insp Program Vogtle Electric Generating Plant Unit 2
ML20215N46231 October 1986Forwards Revs to Relief Requests 33 & 45 Re SER Confirmatory Item 2, Preservice Insp Program. List of Welds Showing Results of Ultrasonic Testing Exams Evaluated Per Winter Addenda of ASME Section XI EnclHydrostatic
ML20215N66530 October 1986Rev 4 to ISI-P-002, Preservice Insp ProgramHydrostatic
ML20215E16315 September 1986Rev 3 to ISI-P-002, Preservice Insp ProgramVT-2
ML20117D6596 May 1985Forwards Response to NRC Request for Addl Info Re Draft SER Open Items.Draft Procedure for Ultrasonic Cast Stainless Steel & C-E Draft Implementation Procedure for Compliance W/Reg Guide 1.150 EnclSafe Shutdown
Nondestructive Examination
Emergency Lighting