MONTHYEARRS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities ML21043A2532021-02-0303 February 2021 Owner'S Activity Report Submittal Fifth 10-Year Interval 2020 Refueling Outage Activities SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities RS-16-130, Inservice Inspection Interval Relief Request 15R-082016-06-30030 June 2016 Inservice Inspection Interval Relief Request 15R-08 ML16189A2182016-06-29029 June 2016 BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages RS-15-126, Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval2015-05-21021 May 2015 Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval ML13316B8342013-11-0808 November 2013 Fifth (5 Th) Ten-Year Interval Inservice Testing Program RS-13-164, Clarification Regarding the Testing Frequency for Fifth Inservice Testing Interval Relief Request RV-23H2013-06-13013 June 2013 Clarification Regarding the Testing Frequency for Fifth Inservice Testing Interval Relief Request RV-23H SVPLTR 13-0008, Owner'S Activity Report Submittal, Fourth 10-Year Interval 2012 Refueling Outage Activities2013-03-0404 March 2013 Owner'S Activity Report Submittal, Fourth 10-Year Interval 2012 Refueling Outage Activities RS-13-005, Supplemental to Dresden and Quad Cities Fifth Inservice Inspection Interval Relief Request I5R-032013-01-10010 January 2013 Supplemental to Dresden and Quad Cities Fifth Inservice Inspection Interval Relief Request I5R-03 RS-12-155, Submittal of Relief Requests Associated with the Fifth Lnservice Testing Interval2012-10-30030 October 2012 Submittal of Relief Requests Associated with the Fifth Lnservice Testing Interval SVPLTR 11-0010, Owner'S Activity Report Submittal Fourth 10-Year Interval 2010 Refueling Outage Activities2011-02-18018 February 2011 Owner'S Activity Report Submittal Fourth 10-Year Interval 2010 Refueling Outage Activities SVPLTR 10-0010, Submittal of Owner'S Activity and Fourth 10-Year Interval 2009 Refueling Outage Activities Report2010-02-25025 February 2010 Submittal of Owner'S Activity and Fourth 10-Year Interval 2009 Refueling Outage Activities Report SVPLTR 08-0007, Owner'S Activity Report Submittal - Fourth 10-Year Interval 2007 Refueling Outage Activities2008-02-12012 February 2008 Owner'S Activity Report Submittal - Fourth 10-Year Interval 2007 Refueling Outage Activities ML0726305512007-09-20020 September 2007 Notification of NRC Inspection and Request for Information RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements2007-04-19019 April 2007 Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements SVPLTR 05-0007, Owner'S Activity Report Submittal Fourth 10-Year Interval 2004 Refueling Outage Activities2005-03-0707 March 2005 Owner'S Activity Report Submittal Fourth 10-Year Interval 2004 Refueling Outage Activities SVPLTR 05-0008, Final Third 10-Year Interval Inservice Inspection (ISI) Summary Report2005-03-0707 March 2005 Final Third 10-Year Interval Inservice Inspection (ISI) Summary Report SVPLTR 04-0002, Owner'S Activity Report Submittal for Fourth 10-Year Interval 2003 Refueling Outage Activities2004-02-0909 February 2004 Owner'S Activity Report Submittal for Fourth 10-Year Interval 2003 Refueling Outage Activities SVPLTR 04-0001, Final Third 10-Year Interval Inservice Inspection (ISI) Summary Report2004-02-0909 February 2004 Final Third 10-Year Interval Inservice Inspection (ISI) Summary Report RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests2003-08-0606 August 2003 Additional Information Regarding Inservice Testing Program Relief Requests ML0302900902003-01-24024 January 2003 Inservice Inspection (ISI) Summary Report Fall 2002 Inservice Inspection Period ML0226107092002-09-0606 September 2002 Fourth Interval Inservice Inspection Program Plan, Attachment C ML0226101532002-09-0606 September 2002 Fourth Interval Inservice Inspection Program Plan, Attachments a and B ML0204506082002-02-0505 February 2002 Inservice Inspection (ISI) Summary Report Fall 2001 Inservice Inspection Period 2023-02-10
[Table view] Category:Letter type:SVPLTR
MONTHYEARSVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel SVPLTR 24-0010, Owners Activity Report (OAR-1) for D2R282024-03-15015 March 2024 Owners Activity Report (OAR-1) for D2R28 SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-09-0707 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 22-0024, Registration of Use of Casks to Store Spent Fuel2022-06-16016 June 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds2022-06-0808 June 2022 Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds SVPLTR 22-0017, Registration of Use of Casks to Store Spent Fuel2022-05-25025 May 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0061, Core Operating Limits Report for Dresden Unit 2 Cycle 282021-11-19019 November 2021 Core Operating Limits Report for Dresden Unit 2 Cycle 28 SVPLTR 21-0057, Submittal of 10 CFR 72.48 Evaluation Summary Report2021-10-15015 October 2021 Submittal of 10 CFR 72.48 Evaluation Summary Report SVPLTR 21-0030, Registration of Use of Casks to Store Spent Fuel2021-06-0202 June 2021 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0028, 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report SVPLTR 21-0027, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2021-04-22022 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 21-0005, Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8)2021-01-29029 January 2021 Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8) SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld2020-10-15015 October 2020 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld SVPLTR 20-0045, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-09-0101 September 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-0532020-07-0202 July 2020 Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 SVPLTR 20-0027, Registration of Use of Casks to Store Spent Fuel2020-05-14014 May 2020 Registration of Use of Casks to Store Spent Fuel SVPLTR 20-0014, Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2020-04-21021 April 2020 Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities SVPLTR 19-0049, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-09-10010 September 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 19-0031, Registration of Use of Casks to Store Spent Fuel2019-06-14014 June 2019 Registration of Use of Casks to Store Spent Fuel SVPLTR 19-0020, Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2019-04-19019 April 2019 Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities SVPLTR 18-0025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-08-15015 August 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 18-0020, Corrected 2017 Radioactive Effluent Release Report2018-06-28028 June 2018 Corrected 2017 Radioactive Effluent Release Report SVPLTR 18-0018, Registration of Use of Casks to Store Spent Fuel2018-06-14014 June 2018 Registration of Use of Casks to Store Spent Fuel SVPLTR 18-0012, Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2018-04-24024 April 2018 Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 18-0007, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 182018-03-0101 March 2018 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 18 SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December2017-08-29029 August 2017 Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December SVPLTR 17-0026, Registration of Use of Casks to Store Spent Fuel2017-06-0606 June 2017 Registration of Use of Casks to Store Spent Fuel SVPLTR 17-0017, Submittal of 2016 Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Radioactive Effluent Release Report SVPLTR 16-0027, 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC2016-12-0101 December 2016 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC SVPLTR 16-0061, Core Operating Limits Report for Unit 3 Cycle 252016-11-21021 November 2016 Core Operating Limits Report for Unit 3 Cycle 25 SVPLTR 16-0018, Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-04-25025 April 2016 Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation SVPLTR 16-0001, Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions2016-01-21021 January 2016 Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions SVPLTR 15-0070, Core Operating Limits Report for Cycle 24A2015-12-15015 December 2015 Core Operating Limits Report for Cycle 24A SVPLTR 15-0065, Core Operating Limits Report for Cycle 252015-11-16016 November 2015 Core Operating Limits Report for Cycle 25 SVPLTR 15-0059, Core Operating Limits Report, Cycle 242015-10-25025 October 2015 Core Operating Limits Report, Cycle 24 SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2015-09-0404 September 2015 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection SVPLTR 15-0052, Response to Preliminary White Finding2015-08-14014 August 2015 Response to Preliminary White Finding SVPLTR 15-0046, ISFSI - Registration of Use of Casks to Store Spent Fuel2015-07-17017 July 2015 ISFSI - Registration of Use of Casks to Store Spent Fuel 2024-09-20
[Table view] |
Text
Exelon Generation Company, LLC www.exeloncorp.com ExeImn.
Dresden Nuclear Power Station NU]ea 65oo North Dresden Road Morris, IL60450-9765 February 12, 2008 SVPLTR #08-0007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 2 Facility Operating License No. DPR-19 NRC Docket No. 50-237
Subject:
Owner's Activity Report Submittal Fourth 10-Year Interval 2007 Refueling Outage Activities This letter submits the Owner's Activity Report (i.e., Form OAR-i) and Invessel Visual Inspection (IVVI) Report for the Dresden Nuclear Power Station (DNPS) Unit 2 refueling outage (D2R20) which began on October 29, 2007, and was completed on November 19, 2007. This is the first refueling outage conducted in the second inspection period of the fourth 10-year inservice inspection interval for DNPS Unit 2. A copy of the Owner's Activity Report and IVVI Report are provided as attachments to this letter.
This Owner's Activi ty Report is submitted in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-1, "Alternate Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission," and Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 14. Code Case N-532-1 requires an Owner's Activity Report Form OAR-1 to be prepared and certified upon completion of each refueling outage. In accordance with the conditions of Regulatory Guide 1.147, this OAR-1 form is being submitted within ninety days of the completion of the refueling outage.
The IVVI report meets the reporting requirements of BWRVIP-18, "BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines" and BWRVIP-94, "BWR Vessel and Internals Project Program Implementation Guide."
February 12, 2008 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. James Ellis, Regulatory Assurance Manager, at (815) 416-2800.
Respectfully, David B. Wozniak Site Vice President Dresden Nuclear Power Station Attachments: Owner's Activity Report, Form OAR-1 Invessel Visual Inspection Report cc: Regional Administrator - Region III NRC Senior Resident Inspector, Dresden Station
FORM OAR- I OWNER'S ACTIVITY REPORT Report Number Refueling Outage D2R20 OAR-i Owner Exelon Generation Companv (EGG, LLC), 300 Exelon Way, Kennett Square, PA, 19348 (Name and Address of Owner)
Plant Dresden Nuclear Power Station, 6500 N. Dresden Road, Morris, IL 60450 (Name and Address of Plant)
Unit No. 2 Commercial Service IDate 06/09/1970 Refueling OutageNo. D2R20 (ifapplicable)
Current inspection interval 4th Inspection Interval (1st, 2nd, 3rd, 4th, other)
Current inspection period 2nd Inspection Period (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plan 1995 Edition with 1996 Addenda Date and revision of inspection plan 09/15/2006 Revision 5 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan N/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certificate of Authorizati NO. a* No.(if applicable)
None Expi ration Date Not Applicable Signed ./" , II--
SI Coordinator Date t /Q(,
I I
/O Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois , and employed by The HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period 02/16/2007 to 02/08/2008, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations tests, repairs, replacements, evaluations, and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions IL 1546 Insoector's Sianature National Board. State. Province. and Endorsements Date A A/0 K-D2R20 OAR-1 Page 1 of 5
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required for Credited for Credited (%) Date for The Category The Interval This Period For The Period Interval Remarks B-A 2 1 50 50 Components scheduled in accordance with Program B.
One during the second inspection period and one during the third inspection period.
25 0 0 0 Deferral Permissible B-D 62 14 23 48 Components scheduled in accordance with Program B.
B-G-1 8 4 50 75 Deferral Permissible B-G-2 34 4 12 35 Components scheduled in accordance with Program B.
1 0 0 100 Examinations limited to components disassembled selected under Examination Category B-L-2 and B-M-2.
B-K 13 5 38 69 Components scheduled in accordance with Program B.
B-L-2 1 1 100 100 Examinations limited to disassembled components.
B-M-1 1 0 0 0 Deferral Permissible B-M-2 6 1 17 100 Examinations limited to disassembled components.
B-N-1 1 0 0 100 One component examined each inspection period.
B-N-2 60 0 0 25 Deferral Permissible B-O 8 0 0 0 Deferral Permissible B-P 2 2 100 300 Two pressure tests performed each refuel outage.
C-A 2 1 50 50 Components scheduled in accordance with Program B.
One during the second and one during the third period.
C-B 12 4 33 50 Components scheduled in accordance with Program B.
6 0 0 100 Six components examined each inspection period.
C-C 10 4 40 60 Components scheduled in accordance with Program B.
C-H 18 5 28 128 Eighteen pressure tests performed each inspection period.
F-A 147 40 27 58 Components scheduled in accordance with Program B.
R-A 76 24 32 58 Components scheduled in accordance with Program B.
22 22 100 300 Twenty-one components VT-2 examined each refuel outage.
D2R20 OAR-1 Page 2 of 5
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Examination Characterization Flaw or Relevant Condition Found During Scheduled Section XI Category Item Number Item Description (IWA-3300) Examination or Test (Yes or No)
B-G-1 B6.50 Washers/Bushings- N/A Yes Bushing 81 appears to have disengaged (turned) during vessel head detensioning.
N/A N/A Isolation Indications No Condenser West Found Outside of End Channel NDE Exam Barrel to Inside Boundary of Cladding Interface Diaphragm Seal Weld After Maintenance D2R20 OAR-1 Page 3 of 5
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Repair, Flaw or Relevant Condition Replacement, Found During Scheduled Repair/
Code or Corrective Section XI Examination or Replacement Class Measure Item Description Description of Work Test (Yes/No) Date Completed Number Unit 2 Vessel Head To Removed Indications 1 Repair Flange Weld Indications Via Grinding Yes 11/17/07 2-07-070 Unit 2 Core Spray Line Tightened Bolt On 2 Repair Support Support Base Plate Yes 11/17/07 N/A Unit 3 HPCI Drain Line Replaced Leaking Item 2 Replacement Leak Per WO 992051 No 01/13/07 N/A Unit 2 Thru Wall Crack On SBLC Tank Temp 2 Repair Thermowell Encapsulated Leak No 01/19/07 2-07-001 2-1501-33B Valve Corrective Missing Bonnet To Installed Missing Bolt 2 Measure Body Flange Bolt and Nut No 02/21/07 2-07-003 Line 2-1510-16"-D Corrective Developed Thru Wall 3 Measure Leak Encapsulated Leak No 05/07/07 2-07-030 Unit 2 HPCI Inlet Drain Replaced Leaking Item 2 Replacement Pot Outlet Line Leak Per WO 1049528 No 07/27/07 N/A U3 HPCI Drain Line Replaced Leaking Item 2 Replacement Leak Per WO 1006173 No 03/03/07 N/A D2R20 OAR-1 Page 4 of 5
Dresden Unit 2 In-Vessel Visual Inspection Report Refueling Outage D2R20 Steam Dryer Replaced The steam dryer was replaced with a new dryer of the same design as the steam dryer installed in Dresden 3 during D3R19 (November 2006). Since this was the last of the four steam dryers to be replaced for Dresden and Quad Cities, no BWRVIP inspections were performed on the removed steam dryer. Future inspection of the new steam dryer will be performed in accordance with the guidance in BWRVIP-139.
Shroud Inspections Ultrasonic examinations were performed on five of the core shroud vertical welds (excluding ring welds). One relevant indication was identified in weld V18, which is in the beltline region. The flaw was evaluated in accordance with the guidance provided in BWRVIP-76. The evaluation concluded the V1 8 weld is acceptable until the next scheduled inspection.
Attachment Weld Inspections Visual inspections were performed on two of the reactor vessel attachment welds as part of the Reactor Internals Program as well as the ASME Code requirements. Each of these attachments consisted of Core Spray brackets. No relevant indications were identified on these welds.
D2R20 OAR-1 Page 5 of 5