RS-18-048, Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.

From kanterella
(Redirected from RS-18-048)
Jump to navigation Jump to search
Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.
ML18122A035
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/02/2018
From: Simpson P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-18-048
Download: ML18122A035 (10)


Text

4300 Winfield Road Warrenville, IL 60555 Exelon Generation 630 657 2000 Office RS-18-048 10 CFR 50.46 May 2, 2018 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

10 CFR 50.46 Annual Report

Reference:

Letter RS-17-052 from P.R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 2, 2017 This letter provides the annual report required by 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, " for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. The attachments describe the changes in accumulated peak cladding temperature (PCT) since the previous annual report submitted in the referenced letter.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Ms. Rebecca L. Steinman at (630) 657-2831 .

P rick R. Simpso~

Manager - Licensing Attachments:

1. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5
2. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5
3. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6
4. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel)- USA6
5. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (AREVA Fuel)
6. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (AREVA Fuel)
7. Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, Quad Cities Nuclear Power Station

ATTACHMENT 1 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5 PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: USA5 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel," WCAP-16078-P-A, November 2004 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

OPTIMA2-TR021QC-LOCA, Revision 5, September 2009

2. "Quad Cities Nuclear Power Station Unit 1 Cycle 23 MAPLHGR Report," NF-BEX-12-188-NP, Revision 0, January 2013 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 7, 2010 (See Note 1) 'PCT = 0°F 10 CFR 50.46 Report dated May 6, 2011 (See Note 2) 'PCT = 0°F 10 CFR 50.46 Report dated May 4, 2012 (See Note 3) 'PCT = 0°F 10 CFR 50.46 Report dated May 3, 2013 (See Note 4) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2014 (See Note 5) 'PCT = 0°F 10 CFR 50.46 Report dated May 1, 2015 (See Note 6) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 2 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5 PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: USA5 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel," WCAP-16078-P-A, November 2004 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

OPTIMA2-TR021QC-LOCA, Revision 5, September 2009

2. "Quad Cities Nuclear Power Station Unit 2 Cycle 23 MAPLHGR Report," NF-BEX-13-168-NP, Revision 0, January 2014 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 7, 2010 (See Note 1) 'PCT = 0°F 10 CFR 50.46 Report dated May 6, 2011 (See Note 2) 'PCT = 0°F 10 CFR 50.46 Report dated May 4, 2012 (See Note 3) 'PCT = 0°F 10 CFR 50.46 Report dated May 3, 2013 (See Note 4) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2014 (See Note 5) 'PCT = 0°F 10 CFR 50.46 Report dated May 1, 2015 (See Note 6) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 3 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6 PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: USA6 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model Updates:

Supplement 4 to Code Description, Qualification and Application,"

WCAP-16865-P-A, Revision 1, October 2011 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

NF-BEX-13-143-P, Revision 3, April 2016

2. "Quad Cities Nuclear Power Station Unit 1 Cycle 24 Supplemental MAPLHGR Report," NF-BEX-14-135-NP, Revision 1, October 2015 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2017 (Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 4 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6 PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: USA6 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model Updates:

Supplement 4 to Code Description, Qualification and Application,"

WCAP-16865-P-A, Revision 1, October 2011 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

NF-BEX-13-143-P, Revision 3, April 2016

2. "Quad Cities Nuclear Power Station Unit 2 Cycle 24 MAPLHGR Report," NF-BEX-15-174-NP, Revision 0, January 2016 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 5 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (AREVA Fuel)

PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: EXEM BWR-2000 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A),

Revision 0, May 2001 Calculations: 1. "Quad Cities Units 1 and 2 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel," ANP-3328P, Revision 2, December 2016

2. "Quad Cities Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel," ANP-3356P, Revision 2, February 2017 Fuel Analyzed in Calculation: ATRIUM 10XM Limiting Fuel Type: ATRIUM 10XM Limiting Single Failure: High Pressure Coolant Injection system Limiting Break Size and Location: 0.13 ft2 split break recirculation discharge pipe Reference Peak Cladding Temperature (PCT): PCT = 2138°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2138°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2138°F

ATTACHMENT 6 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (AREVA Fuel)

PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: EXEM BWR-2000 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A),

Revision 0, May 2001 Calculations: 1. "Quad Cities Units 1 and 2 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel," ANP-3328P, Revision 2, December 2016

2. "Quad Cities Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel," ANP-3356P, Revision 3, January 2018 Fuel Analyzed in Calculation: ATRIUM 10XM Limiting Fuel Type: ATRIUM 10XM Limiting Single Failure: High Pressure Coolant Injection system Limiting Break Size and Location: 0.13 ft2 split break recirculation discharge pipe Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS None 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS New LOCA Model (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes

1. Prior Loss-of-Coolant Accident (LOCA) Assessment The referenced letter reported a new Westinghouse LOCA analysis of record (AOR),

which incorporated modifications for the newly added recirculation pump adjustable speed drives (ASD). The new AOR (Revision 5) updated the LOCA analysis to apply approved updated Westinghouse methods, incorporate previous corrections, and update plant specific inputs. The new Westinghouse LOCA analysis demonstrated that the limiting peak cladding temperature (PCT) was 2150°F.

The referenced letter also reported the impact of subsequent corrections for an incorrect bypass hole flow coefficient, and for updated vessel leakage values. The PCT impact of these two corrections on the limiting PCT was 9°F and 2°F, respectively. These PCT impacts will remain in effect only until the MAPLHGR limits for all bundles in future QCNPS Units 1 and 2 cores are evaluated for this change. The MAPLHGR limits for all bundles in the QCNPS Unit 1 cores starting with Q1C25 and QCNPS Unit 2 cores starting with Q2C25 were evaluated for these changes and these penalties no longer apply.

[

Reference:

Letter from J. L. Hansen (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46, 'Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,' Annual Report," dated May 7, 2010]

2. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no emergency core cooling system (ECCS)-related changes or modifications occurred at Quad Cities Nuclear Power Station (QCNPS) that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from J. L. Hansen (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46, 'Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,' Annual Report," dated May 6, 2011]

3. Prior LOCA Assessment The referenced letter provided the annual 10 CFR 50.46 report for Units 1 and 2. The letter reported errors in the current Westinghouse QCNPS LOCA analysis associated with the use of incorrect R-factors. The impact due to this change was determined to be 18°F increase in PCT. This PCT will remain in effect only until the MAPLHGR limits for all bundles in future QCNPS Units 1 and 2 cores are evaluated for this change. The MAPLHGR limits for all bundles in the QCNPS Unit 1 cores starting with Q1C25 and QCNPS Unit 2 cores starting with Q2C25 were evaluated for this change and this penalty no longer apply.

[

Reference:

Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, Annual Report, dated May 4, 2012]

Page 1

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes

4. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 3, 2013]

5. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 2, 2014]

6. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 1, 2015]

7. Prior LOCA Assessment The new USA6 LOCA Evaluation Model and calculation was implemented for QCNPS Unit 2 for all fresh fuel starting with Cycle 24. This evaluation model and calculation supplement the existing Evaluation Model and calculation. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation Model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 2, 2016]

8. Prior LOCA Assessment The new USA6 LOCA Evaluation Model and calculation was implemented for QCNPS Unit 1 during Cycle 24 for the Optima2 fuel loaded fresh into the Cycle 24 core. This evaluation model and calculation supplement the existing Evaluation Model and calculation. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Page 2

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes The new AREVA EXEM BWR-2000 Evaluation Model and calculation has been implemented for QCNPS Unit 1 for the fresh fuel of ATRIUM 10XM loaded into the Cycle 25 core. This model reports a limiting PCT of 2138°F and has no additional PCT impacts or estimates.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation model, USA6 LOCA Evaluation model or EXEM BWR-2000 LOCA Evaluation model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 2, 2017]

9. Current Assessment The new AREVA EXEM BWR-2000 Evaluation Model and calculation has been implemented for QCNPS Unit 2 for the fresh fuel of ATRIUM 10XM loaded into the Cycle 25 core. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Additionally, updated LOCA/MAPLHGR analyses were performed for QCNPS, Unit 1 and Unit 2 for the Westinghouse fuel first introduced in their respective Cycle 23 reload. These analyses for QCNPS, Unit 1 and Unit 2 maintained the calculated PCT at 2150°F and accounted for the incorrect vessel leakage and bypass hole coefficient outlined in Note 1 and the incorrect R-factors outlined in Note 3. All other Westinghouse fuel from before Cycle 23 that was impacted by these errors within Unit 1 and 2 has been discharged. Therefore, the previous penalty of 11°F in Note 1 and 18°F in Note 3 no longer apply for QCNPS, Unit 1 and Unit 2. The penalty in Attachment 1 and 2 listed for Note 1 and 3 has all been changed to 0°F.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation model, USA6 LOCA Evaluation model or EXEM BWR-2000 LOCA Evaluation model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.

Page 3

4300 Winfield Road Warrenville, IL 60555 Exelon Generation 630 657 2000 Office RS-18-048 10 CFR 50.46 May 2, 2018 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

10 CFR 50.46 Annual Report

Reference:

Letter RS-17-052 from P.R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 2, 2017 This letter provides the annual report required by 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, " for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. The attachments describe the changes in accumulated peak cladding temperature (PCT) since the previous annual report submitted in the referenced letter.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Ms. Rebecca L. Steinman at (630) 657-2831 .

P rick R. Simpso~

Manager - Licensing Attachments:

1. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5
2. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5
3. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6
4. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel)- USA6
5. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (AREVA Fuel)
6. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (AREVA Fuel)
7. Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, Quad Cities Nuclear Power Station

ATTACHMENT 1 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5 PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: USA5 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel," WCAP-16078-P-A, November 2004 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

OPTIMA2-TR021QC-LOCA, Revision 5, September 2009

2. "Quad Cities Nuclear Power Station Unit 1 Cycle 23 MAPLHGR Report," NF-BEX-12-188-NP, Revision 0, January 2013 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 7, 2010 (See Note 1) 'PCT = 0°F 10 CFR 50.46 Report dated May 6, 2011 (See Note 2) 'PCT = 0°F 10 CFR 50.46 Report dated May 4, 2012 (See Note 3) 'PCT = 0°F 10 CFR 50.46 Report dated May 3, 2013 (See Note 4) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2014 (See Note 5) 'PCT = 0°F 10 CFR 50.46 Report dated May 1, 2015 (See Note 6) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 2 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA5 PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: USA5 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel," WCAP-16078-P-A, November 2004 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

OPTIMA2-TR021QC-LOCA, Revision 5, September 2009

2. "Quad Cities Nuclear Power Station Unit 2 Cycle 23 MAPLHGR Report," NF-BEX-13-168-NP, Revision 0, January 2014 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 7, 2010 (See Note 1) 'PCT = 0°F 10 CFR 50.46 Report dated May 6, 2011 (See Note 2) 'PCT = 0°F 10 CFR 50.46 Report dated May 4, 2012 (See Note 3) 'PCT = 0°F 10 CFR 50.46 Report dated May 3, 2013 (See Note 4) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2014 (See Note 5) 'PCT = 0°F 10 CFR 50.46 Report dated May 1, 2015 (See Note 6) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 3 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6 PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: USA6 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model Updates:

Supplement 4 to Code Description, Qualification and Application,"

WCAP-16865-P-A, Revision 1, October 2011 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

NF-BEX-13-143-P, Revision 3, April 2016

2. "Quad Cities Nuclear Power Station Unit 1 Cycle 24 Supplemental MAPLHGR Report," NF-BEX-14-135-NP, Revision 1, October 2015 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2017 (Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 4 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Westinghouse Fuel) - USA6 PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: USA6 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "Westinghouse BWR ECCS Evaluation Model Updates:

Supplement 4 to Code Description, Qualification and Application,"

WCAP-16865-P-A, Revision 1, October 2011 Calculations: 1. "Quad Cities 1 & 2 LOCA Analysis for SVEA-96 Optima2 Fuel,"

NF-BEX-13-143-P, Revision 3, April 2016

2. "Quad Cities Nuclear Power Station Unit 2 Cycle 24 MAPLHGR Report," NF-BEX-15-174-NP, Revision 0, January 2016 Fuel Analyzed in Calculation: SVEA-96 Optima2 Limiting Fuel Type: SVEA-96 Optima2 Limiting Single Failure: Low Pressure Coolant Injection system injection valve Limiting Break Size and Location: 1.0 double-ended guillotine break in the recirculation pump suction line Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2016 (See Note 7) 'PCT = 0°F 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 5 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (AREVA Fuel)

PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: EXEM BWR-2000 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A),

Revision 0, May 2001 Calculations: 1. "Quad Cities Units 1 and 2 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel," ANP-3328P, Revision 2, December 2016

2. "Quad Cities Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel," ANP-3356P, Revision 2, February 2017 Fuel Analyzed in Calculation: ATRIUM 10XM Limiting Fuel Type: ATRIUM 10XM Limiting Single Failure: High Pressure Coolant Injection system Limiting Break Size and Location: 0.13 ft2 split break recirculation discharge pipe Reference Peak Cladding Temperature (PCT): PCT = 2138°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 2, 2017 (See Note 8) 'PCT = 0°F Net PCT 2138°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2138°F

ATTACHMENT 6 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (AREVA Fuel)

PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: EXEM BWR-2000 REPORT REVISION DATE: 05/02/2018 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD Evaluation Model: "EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A),

Revision 0, May 2001 Calculations: 1. "Quad Cities Units 1 and 2 LOCA Break Spectrum Analysis for ATRIUM 10XM Fuel," ANP-3328P, Revision 2, December 2016

2. "Quad Cities Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM 10XM Fuel," ANP-3356P, Revision 3, January 2018 Fuel Analyzed in Calculation: ATRIUM 10XM Limiting Fuel Type: ATRIUM 10XM Limiting Single Failure: High Pressure Coolant Injection system Limiting Break Size and Location: 0.13 ft2 split break recirculation discharge pipe Reference Peak Cladding Temperature (PCT): PCT = 2150°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS None 'PCT = 0°F Net PCT 2150°F B. CURRENT LOCA MODEL ASSESSMENTS New LOCA Model (See Note 9) 'PCT = 0°F Total PCT change from current assessments 'PCT = 0°F Cumulative PCT change from current assessments ~'PCT~ = 0°F Net PCT 2150°F

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes

1. Prior Loss-of-Coolant Accident (LOCA) Assessment The referenced letter reported a new Westinghouse LOCA analysis of record (AOR),

which incorporated modifications for the newly added recirculation pump adjustable speed drives (ASD). The new AOR (Revision 5) updated the LOCA analysis to apply approved updated Westinghouse methods, incorporate previous corrections, and update plant specific inputs. The new Westinghouse LOCA analysis demonstrated that the limiting peak cladding temperature (PCT) was 2150°F.

The referenced letter also reported the impact of subsequent corrections for an incorrect bypass hole flow coefficient, and for updated vessel leakage values. The PCT impact of these two corrections on the limiting PCT was 9°F and 2°F, respectively. These PCT impacts will remain in effect only until the MAPLHGR limits for all bundles in future QCNPS Units 1 and 2 cores are evaluated for this change. The MAPLHGR limits for all bundles in the QCNPS Unit 1 cores starting with Q1C25 and QCNPS Unit 2 cores starting with Q2C25 were evaluated for these changes and these penalties no longer apply.

[

Reference:

Letter from J. L. Hansen (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46, 'Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,' Annual Report," dated May 7, 2010]

2. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no emergency core cooling system (ECCS)-related changes or modifications occurred at Quad Cities Nuclear Power Station (QCNPS) that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from J. L. Hansen (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46, 'Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,' Annual Report," dated May 6, 2011]

3. Prior LOCA Assessment The referenced letter provided the annual 10 CFR 50.46 report for Units 1 and 2. The letter reported errors in the current Westinghouse QCNPS LOCA analysis associated with the use of incorrect R-factors. The impact due to this change was determined to be 18°F increase in PCT. This PCT will remain in effect only until the MAPLHGR limits for all bundles in future QCNPS Units 1 and 2 cores are evaluated for this change. The MAPLHGR limits for all bundles in the QCNPS Unit 1 cores starting with Q1C25 and QCNPS Unit 2 cores starting with Q2C25 were evaluated for this change and this penalty no longer apply.

[

Reference:

Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, Annual Report, dated May 4, 2012]

Page 1

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes

4. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from D. M. Gullott (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 3, 2013]

5. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 2, 2014]

6. Prior LOCA Assessment The referenced letter reported no new PCT assessment for the Westinghouse LOCA analysis. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions of the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 1, 2015]

7. Prior LOCA Assessment The new USA6 LOCA Evaluation Model and calculation was implemented for QCNPS Unit 2 for all fresh fuel starting with Cycle 24. This evaluation model and calculation supplement the existing Evaluation Model and calculation. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation Model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.

NRC, "10 CFR 50.46 Annual Report," dated May 2, 2016]

8. Prior LOCA Assessment The new USA6 LOCA Evaluation Model and calculation was implemented for QCNPS Unit 1 during Cycle 24 for the Optima2 fuel loaded fresh into the Cycle 24 core. This evaluation model and calculation supplement the existing Evaluation Model and calculation. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Page 2

ATTACHMENT 7 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes The new AREVA EXEM BWR-2000 Evaluation Model and calculation has been implemented for QCNPS Unit 1 for the fresh fuel of ATRIUM 10XM loaded into the Cycle 25 core. This model reports a limiting PCT of 2138°F and has no additional PCT impacts or estimates.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation model, USA6 LOCA Evaluation model or EXEM BWR-2000 LOCA Evaluation model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.

[

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 2, 2017]

9. Current Assessment The new AREVA EXEM BWR-2000 Evaluation Model and calculation has been implemented for QCNPS Unit 2 for the fresh fuel of ATRIUM 10XM loaded into the Cycle 25 core. This model reports a limiting PCT of 2150°F and has no additional PCT impacts or estimates.

Additionally, updated LOCA/MAPLHGR analyses were performed for QCNPS, Unit 1 and Unit 2 for the Westinghouse fuel first introduced in their respective Cycle 23 reload. These analyses for QCNPS, Unit 1 and Unit 2 maintained the calculated PCT at 2150°F and accounted for the incorrect vessel leakage and bypass hole coefficient outlined in Note 1 and the incorrect R-factors outlined in Note 3. All other Westinghouse fuel from before Cycle 23 that was impacted by these errors within Unit 1 and 2 has been discharged. Therefore, the previous penalty of 11°F in Note 1 and 18°F in Note 3 no longer apply for QCNPS, Unit 1 and Unit 2. The penalty in Attachment 1 and 2 listed for Note 1 and 3 has all been changed to 0°F.

Additionally, there are no new changes, error corrections, or enhancements in the current QCNPS LOCA analysis based on the USA5 LOCA Evaluation model, USA6 LOCA Evaluation model or EXEM BWR-2000 LOCA Evaluation model. Also, no ECCS-related changes or modifications occurred at QCNPS that affected the assumptions in the ECCS analyses.