MONTHYEARRS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-094, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements2022-07-25025 July 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station2022-05-25025 May 2022 Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station RS-22-059, CFR50.46 Annual Report2022-05-0404 May 2022 CFR50.46 Annual Report RS-22-056, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-054, Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval2022-04-13013 April 2022 Withdrawal of Relief Request RV-10 Associated with the Sixth Inservice Testing Interval RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-030, Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Submittal of Relief Request Associated with the Sixth Inservice Inspection Interval RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations 2024-01-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves ML23012A0832023-01-12012 January 2023 Response to Request for Additional Information for Alternative I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs RS-22-005, Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request2022-01-11011 January 2022 Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request RS-21-113, Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel2021-11-0303 November 2021 Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 RS-20-008, Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment.2020-02-24024 February 2020 Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment. JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-112018-01-0404 January 2018 Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11 RS-17-130, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-09-28028 September 2017 Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-111, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-07-27027 July 2017 Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-041, Response to Request for Additional Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings2017-04-24024 April 2017 Response to Request for Additional Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-16-254, Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-15015 December 2016 Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings2016-12-12012 December 2016 Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings RS-16-229, Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings2016-11-21021 November 2016 Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings2016-07-28028 July 2016 County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings RS-16-131, Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge2016-06-0101 June 2016 Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel2016-04-26026 April 2016 Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel RS-16-077, Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2016-04-14014 April 2016 Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-19019 February 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. RS-16-018, Response to Request for Additional Information Regarding Request for License Amendment Regarding Transition to Areva Fuel2016-01-28028 January 2016 Response to Request for Additional Information Regarding Request for License Amendment Regarding Transition to Areva Fuel RS-15-274, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-10-28028 October 2015 Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-15-258, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation2015-09-29029 September 2015 County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation RS-12-149, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval2012-09-13013 September 2012 Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval ML17238A7511973-08-31031 August 1973 Quad-Cities Stations Units 1 and 2 - 10 CFR 50, Appendix J 2024-01-03
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-17-041 April 24, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Additional Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings
References:
- 1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Request for License Amendment to Revise Loss of Voltage Relay Settings,"
dated September 12, 2016
- 2. Letter from K. J. Green (U.S. NRC) to B. C. Hanson (Exelon Generation Company, LLC), "Quad Cities Nuclear Power Station, Units 1 and 2 -
Request for Additional Information Concerning Proposed Changes to Revise Loss of Voltage Relay Settings (CAC Nos. MF8381 and MF8382)
(RS-16-162)," dated March 8, 2017 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, respectively. The proposed change revises the allowable value for Function 1, "4160 V Essential Service System Bus Undervoltage (Loss of Voltage)," in Technical Specifications (TS) Table 3.3.8.1-1, "Loss of Power Instrumentation."
The NRC requested additional information that is needed to complete review of the proposed change in Reference 2. In response to this request, EGC is providing the attached information.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Attachment 1 of Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the additional information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
April 24, 2017 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803.
e I declare under penalty of perjury that the foregoing is true and correct. Executed on the 24th day of April 2017.
espectfully, Patrick R. Simpson Manager - Licensing
Attachment:
Response to Request for Additional Information cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector - Quad Cities Nuclear Power Station Illinois Emergency Management Agency- Division of Nuclear Safety
ATTACHMENT Response to Request for Additional Information NRC Request 1 On page 2 of Attachment 1 of the LAR, EGC has provided a summary of the problem statement and states, "[t]he concern was that, if the voltage at the 4.16 kV [kilovolt] safety related buses dropped to slightly above 75 percent of the nominal voltage, the operating motors would experience approximately a 28 percent increase in current." Exelon has further stated that,
"[t]his voltage drop, complicated by potential motor starts, including the potential start of the motor-driven auxiliary feedwater pump if a plant trip occurred, could result in adverse consequences that had not been evaluated." The LAR does not discuss the impact of large motor starting during degraded voltage conditions and how the proposed setpoint of the LOV relays will preclude complications during plant shutdown.
- a. Please provide details, including assumptions used, on the Quad Cities voltage drop evaluation that was performed to demonstrate the adequacy of the proposed LOV setpoint in combination with the existing setpoints (voltage and time) of the degraded voltage relay (DVR) for protecting safety related equipment following a plant trip and large motor (e.g., feedwater pump, drywell coolers, service water pumps) starts.
- b. Please confirm if this voltage drop evaluation enveloped any process-related demand for a large motor start that can occur during the required design basis operational modes such as normal plant operation, controlled shutdown, anticipated operational occurrences or post-accident conditions with a unit trip and a fast bus transfer to the reserve auxiliary transformer. If the evaluation did not consider these, please explain why the proposed LOV relay settings are adequate. The staff notes that UFSAR Table 8.3-2 identifies that the CRD pump and service water pump are manually started after 10 minutes.
Response
The evaluation performed only addressed those safety related components required for safe shutdown of the plant in order to validate their continued functionality during the proposed low voltage scenario. The NRC safety evaluation supporting Amendments 77 and 71 for Quad Cities Nuclear Power Station (QCNPS) Units 1 and 2, respectively, (i.e., Reference 1) state in sections 3.0 (Item 1) and 4.0 (Item 3) that large motor starts and grid disturbances were considered and found acceptable without causing spurious trips of the relays.
Calculation 9390-02-19-1, "Diesel Generator 1 Loading Under Design Bases Accident Condition," Revision 3, and similar calculations for the other emergency diesel generators (EDGs), evaluated bus voltages at 55% (2288 V) and demonstrated adequate recovery from voltage dips following large motor starts, which demonstrates significant margin to the proposed 3952 V. The calculation evaluated EDG loading during the most limiting starts of the largest motors. No protective devices are expected to operate per the conclusions of these analyses, as the voltage dips are expected to be one second in duration. Subsequent manual starts of equipment under operator control will assess loading at the time that motor starts are required.
Page 1
ATTACHMENT Response to Request for Additional Information NRC Request 2 The NRC staff reviewed LAR Attachment 3, "Design Analysis QDC-6700-E-2173, 'Evaluation of Degraded Voltage 5 Minute Timer on Normally Running Safety-Related Loads,'" Revision 000, and made the following observations:
- Page 3 of 18 provides a listing of emergency core cooling system (ECCS) room coolers which are considered as "the only directly connected safety-related motors that may be running during normal operation." The staff notes that loads such as drywell coolers, service water pump, and control room air handling units (AHU) or heating, ventilation and air conditioning (HVAC) systems are not included in the list.
- Page 8 of 18 states that the analysis will evaluate the safety-related motors that may be running during normal conditions during a severely degraded voltage condition that lasts for an extended period of time.
- Page 9 of 18 states that there are no normally running, safety-related 480 V switchgear motors or 4.16 kV switchgear motors.
The NRC staff notes that grid-related degraded voltage conditions can occur at any time during normal plant operation, controlled shutdown, anticipated operational occurrences or post-accident conditions and impact redundant trains of equipment. The evaluation included in the LAR considered only the ECCS-related AHU loads. The staff notes that there are other motors that are connected to switchgear buses and may be running during normal plant operation but were not evaluated for degraded voltage conditions in the analyses provided. Please confirm the following:
- a. The ECCS room coolers are single packaged units containing fans, coils, filters, dampers air conditioning compressors, etc., and external chillers or compressors are not required for room cooling and are therefore not considered in the DVR and LOV relay setpoint analyses.
- b. If any control room related HVAC systems are normally operating and any compressors or chillers are required during normal operation and plant shutdown for postulated events.
- c. Degraded voltage conditions resulting from grid-related events can occur on redundant safety buses and can adversely impact redundant equipment. Please explain if pumps and motors associated with cooling water systems such as station service water, reactor building closed cooling water, drywell coolers, etc., have been evaluated for low voltage conditions similar to the AHUs discussed in the LAR. If the loss of motors associated with cooling water systems have not been evaluated, then please confirm if loss of redundant trains of cooling water systems for an extended duration can adversely impact the plant systems during normal operation or during controlled shutdown with no accident signal postulated and station buses connected to offsite power.
Page 2
ATTACHMENT Response to Request for Additional Information
Response
- a. The ECCS room coolers are self-contained units. All components are contained within the room cooler. The only external components for room cooler operation are the power supplies, cabling and cooling water piping.
- b. The QCNPS Control Room HVAC system consists of two independent trains. The Control Room HVAC system trains are described in UFSAR Section 6.4.2.2 and 9.4.1.2.
Train A Control Room HVAC is the normally operating Control Room HVAC system during normal operation. Train A is considered non-safety related and is powered from a non-safety related bus. Train B Control Room HVAC is safety-related and is powered from a safety-related bus (i.e., MCC 18-1). In the event of a LOCA/LOOP, the power to the Train A system would be lost and the Train A system would trip. The trip of the Train A Control Room HVAC system would cause an automatic start of the Train B Control Room HVAC air handling unit. The Train B Control Room HVAC air conditioning compressor and the air filtration unit would need to be manually started within 40 minutes in accordance with the UFSAR description in Section 6.4.4.1.
As described in UFSAR section 6.4.4.1, "Radiation protection is provided to allow control room access and occupancy for the duration of a DBA." UFSAR Section 6.4.3 also states, "Train B is operable during a loss of either offsite power or instrument air."
Therefore, Train B Control Room HVAC is required and designed to be available for postulated events. Since the Train A Control Room HVAC is the train that is used for normal operation, then the same Control Room HVAC Train is not required for both normal operation and plant shutdown for postulated events.
- c. During normal plant operation, safety related cooling water pumps and motors powered from the class 1E system would not be expected to be running unless system surveillances are in progress. A controlled shutdown of a unit with no accident signal present will take hours to complete. As such, if the degraded voltage condition does not clear within five minutes, the five minute time delay function relay sends a loss of power signal to the respective bus load shedding scheme and starts the associated EDG.
During a controlled unit shutdown with no accident signal present, the degraded voltage five minute time delay relay would have started the EDGs before safety related cooling systems would be required. Also, as part of the controlled unit shutdown, large non-safety related loads (i.e., feedwater pump, circulating water pump, condensate pump) will be removed from service which will improve the degraded voltage condition.
NRC Request 3 Section 3.3.1 of Attachment 3 to the LAR states, "The results of the transient EDG [emergency diesel generators] voltage dip analyses from diesel loading calculations 9390-02-19-1, 9390-02-19-2, and 9390-02-19-3 are used in this calculation. The QCNPS Unit 1, Unit 2, and 1/2 diesel loading calculations are not maintained (emphasis added) and have been superseded by ETAP calculation QDC-6700-E-1503 ... Furthermore, an exact value for the transient voltage dip is not needed as the results are used to show that margin exists between LOV relay setpoint Page 3
ATTACHMENT Response to Request for Additional Information and the transient voltage dips." The NRC staff understands that raising the LOV relay setpoint can potentially impact EDG operation.
- a. Please explain the use of unmaintained diesel loading calculations for input into calculations maintained by a 10 CFR Appendix B "Design Control" program.
- b. Please provide details on the margin between LOV relay setpoint and the largest voltage transient observed during motor starting.
- c. QCNPS TS surveillance requirements such as 3.8.1.2 and 3.8.1.8 require that a minimum EDG steady state voltage of 3952 V be verified. Please confirm that the EDG voltage transient dips were evaluated based on a starting voltage of 3952 V and unlike the DVR setpoint analyses, an infinite bus is not connected to each of 4.16 kV essential service system buses in order to model a specific operating voltage.
Response
- a. As described in calculation QDC-6700-E-2173, use of the transient voltage dip analyses from the unmaintained diesel loading calculations was based on engineering judgment.
This assumption is acceptable because the information is only used to show there is margin between the LOV relay setpoint and the transient voltage dips (i.e., as discussed below). The voltage dip analyses have been superseded by ETAP calculation QDC-6700-E-1503, and any future changes to the EDG loading analysis for DBA conditions would be incorporated into calculation QDC-6700-E-1503. In addition, use of this assumption is justifiable because the loading on the EDGs and the sequence of automatic large motor starts seldom change. However, if a significant change were to occur, the impact to calculation QDC-6700-E-2173 would be evaluated under EGC's design control processes to confirm the acceptability of the continued use of the engineering judgement assumption.
- b. As discussed on pages 17 and 18 of calculation QDC-6700-E-2173, both LOOP/LOCA and LOOP without LOCA scenarios have been analyzed. For each EDG during the LOOP/LOCA scenario, voltage recovers to more than 84% of 4.16 kV (3494 V) within one second following the start of any large 4 kV motor. For the LOOP without LOCA, voltage recovers to more than 3494 V within one second following the start of the Residual Heat Removal Service Water pump motor. Therefore, the 4.16 kV ESS bus voltage will recover above 3494 V within one second following the largest expected EDG voltage transient. Page 18 of the calculation shows that the upper analytical limit for the LOV relay is 3246 V. Therefore, the margin between the LOV relay setpoint (i.e., when at +5% of the nominal setpoint) and the largest voltage transient is 248 V (i.e., 3494 V - 3246 V).
- c. The ETAP runs are performed at both 4160 V (100%) bus voltage and 3845 V bus voltage, and demonstrate that the voltage dip after the large motor starts will adequately recover. This bounds the normal operating voltage band down to 3952 V, and provides margin.
Page 4
ATTACHMENT Response to Request for Additional Information NRC Request 4 In response to the request for supplemental information, EGC sent a letter dated November 21, 2016 (ADAMS Accession No. ML16326A200). Exelon's response addressed clarifications regarding assumptions and provided a drift analysis. The NRC staff observed that the drift analysis did not identify how as-found values which are outside the allowed tolerances are addressed. Provide additional information to clarify how out of tolerance values are addressed.
This information is requested to confirm compliance with 10 CFR 50.36(c)(ii)(A) and the guidance of Regulatory Guide 1.105, Revision 3.
Response
As-found setpoint values that are found outside of the allowed tolerances during calibration are adjusted to a value within the as-left tolerance using the applicable relay calibration procedure.
The as-found data is addressed in accordance with procedure ER-AA-520, "Instrument Performance Trending." This procedure requires an Issue Report to be initiated in the Corrective Action Program when surveillance testing identifies that an instrument is out of tolerance. Under the Corrective Action Program, the out of tolerance instrument is evaluated to determine the impact on operability. Procedure ER-AA-520 requires specific trend code information to be included in Issue Reports for out of tolerance instruments to facilitate periodic trend reviews under the As-Found/As-Left Program. In some trending cases, instrument replacement is warranted.
The As-Found/As-Left Program is used to maintain a continuing evaluation of instrument drift based on calibration data and to incorporate any increase in observed drift into appropriate calculations. Specifically, Design Engineering personnel update the drift analysis for instrumentation using new calibration data (i.e., including out of tolerance as-found values identified during surveillance testing) once each operating cycle (i.e., every 24 months) to determine if instrument drift trends from this period, and previous periods, invalidate the drift determination or analysis enough to warrant an adjustment to the drift error data provided in the instrument setpoint calculations. If warranted, setpoint calculations are adjusted to reflect new setpoints and tolerances based on the instrument drift data.
Results of the most recent periodic update of the drift analysis for the LOV relays were previously submitted to the NRC in Reference 2. Additional information regarding the As-Found/As-Left Program is discussed in Appendix J, "Guideline for the Analysis and Use of As-Found/As-Left Data," of NES-EIC-20.04, "Analysis of Instrument Channel Setpoint Error and Instrument Loop Accuracy," which has been approved by the NRC for use at QCNPS as discussed in Reference 2.
References
- 1. Letter from D. M. Crutchfield (U.S. NRC) to L. DelGeorge (Commonwealth Edison Company), "Degraded Grid Voltage Protection," dated May 19, 1982
- 2. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings," dated November 21, 2016 Page 5