RS-13-026, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

From kanterella
Jump to navigation Jump to search
Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML13059A299
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/28/2013
From: Jesse M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, RS-13-026, TMI-13-004
Download: ML13059A299 (58)


Text

{{#Wiki_filter:1 Exelon Generation Order No. EA-12-049 RS-13-026 TMI-13-004 February 28, 2013 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

References:

1. NRC Order Number EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" dated March 12, 2012
2. NRC Interim Staff Guidance JLD-ISG-2012-01, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Revision 0, dated August 29, 2012
3. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide,"

Revision 0, dated August, 2012

4. Exelon Generation Company, LLC's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated October 25, 2012 On March 12,2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to Exelon Generation Company, LLC (EGC). Reference 1 was immediately effective and directs EGC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in of Reference 1.

u.s. Nuclear Regulatory Commission Integrated Plan Report to EA-12-049 February 28, 2013 Page 2 Reference 1 requires submission of an Overall Integrated Plan by February 28,2013. The NRC Interim Staff Guidance (ISG) (Reference 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 3 provides direction regarding the content of this Overall Integrated Plan. Reference 4 provided the EGC initial status report regarding mitigation strategies, as required by Reference 1. The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1 , of Reference 1. This letter confirms EGC has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for defining and deploying strategies that will enhance the ability to cope with conditions resulting from beyond-design-basis external events. The information in the enclosure provides the Three Mile Island Nuclear Station, Unit 1 Overall Integrated Plan for mitigation strategies pursuant to Reference 3. The enclosed Integrated Plan is based on conceptual design information. Final design details and associated procedure guidance, as well as any revisions to the information contained in the Enclosure, will be provided in the 6-month Integrated Plan updates required by Reference 1. This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact David P. Helker at 610-765-5525. I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of February 2013. Respectfully submitted, egulatory Affairs ompany, LLC

Enclosure:

1. Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies (MS) Overall Integrated Plan cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region I NRC Senior Resident Inspector - Three Mile Island Nuclear Station, Unit 1 NRC Project Manager, NRR - Three Mile Island Nuclear Station, Unit 1 Mr. Robert J. Fretz, Jr, NRRIJLD/PMB, NRC Mr. Robert L. Dennig, NRRIDSS/SCVB, NRC Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection

Enclosure 1 Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies (MS) Overall Integrated Plan (55 pages)

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan General Integrated Plan Elements PWR Site: TMI Determine Applicable Input the hazards applicable to the site; seismic, external Extreme External Hazard flood, high winds, snow, ice, cold, high temps. Describe how NEI 12-06 sections 5 - 9 were applied and Ref: NEI 12-06 section 4.0 -9.0 the basis for why the plant screened out for certain hazards JLD-ISG-2012*01 section 1.0 Seismic events; external flooding; severe storms with high winds; snow, ice and extreme cold; and high temperatures were determined to be applicable Extreme External Hazards for TMI per the guidance of NEI 12-06 and are as follows: Seismic Hazard Assessment: The event is a design basis earthquake i.e., Safe Shutdown Earthquake (SSE). The peak ground acceleration is 0.12g in the horizontal plane and 0.08g in the vertical plane. The SSE is twice the Operating Basis Earthquake (OBE), and the OBE spectra curves are shown in UFSAR Figure 2.7-1. (Reference # 1) External Flood Assessment: At TMI-1 this event is a precipitation driven event with a minimum of 24 hours warning prior to exceeding the protection of the dike and a peak water level of 313.3 ft elevation (measured at the TMI*1 (Intake Pump and Screen House (IPSH>>. To have some causal relationship with the flood, the Extended Loss of All AC Power (ELAP) and Loss of Ultimate Heat sink (LUHS) are assumed to occur when the river level exceeds the protection provided by the dike. (Reference # 2) High Wind Hazard Assessment: NEI 12-06, Figure 7.1 locates TMI between the 130 MPH and 140 MPH curves. NEI 12-06, Figure 7.2, Recommended Tornado Design Wind Speeds, locates TMI in region 2, 170 MPH. The TMI design basis tornado generates 300 mph tangential wind velocity with gust of 130%. (Reference # 3) Page 1 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIon Strategies Integrated Plan Extreme Cold Hazard Assessment: NEI 12-06 locates TMI in an area where the record 3-day snowfall is 18" - 25". Figure 8.2 places TMI in a level 4 region for Ice Storm Severity (Level 4 - Severe damage to power lines and/or existence of large amount of ice). A design temperature of O°F is applied for the FLEX equipment. In addition, the plan addresses maintaining the availability of the credited water sources with ambient temperature of O°F (including the river) and deployment of FLEX equipment with severe snow or ice conditions. (Reference # 4 ) Extreme Heat Hazard Analysis: All FLEX equipment is designed for an ambient temperature of at least 120°F. The highest temperature recorded in the area of TMI is 107°F. (Reference #5 & #6)

References:

1. TMIl UFSAR, Figure 2.7-1, and 5.1.2.1.1
2. TMIl UFSAR, 2.6.4
3. NEI 12-06, Figures 7.1 and 7.2, UFSAR 5.2.1.2.6
4. NEI 12-06, Figure 8.2
5. TMIl UFSAR 2.5.2
6. NOAA website for Harrisburg, Pa Key Site assumptions to Provide key assumptions associated with implementation of implement NEI 12-06 FLEX Strategies:

strategies. This plan defines strategies capable of mitigating a simultaneous loss of all alternating current (ac) power and Ref: NEI 12-06 section 3.2.1 loss of normal access to the ultimate heat sink resulting from a beyond-design-basis event by providing adequate capability to maintain or restore core cooling, containment, and Spent Fuel Pool (SFP) cooling capabilities at all units on a site. Though specific strategies are being developed, due to the inability to anticipate all possible scenarios, the strategies are also diverse and flexible to encompass a wide range of possible conditions. These pre-planned strategies developed to protect the public health and safety will be incorporated into the unit emergency operating procedures in accordance with established EOP change processes, and their impact to the design basis capabilities of the unit evaluated under 10 CPR 50.59. The plant Technical Specifications contain the limiting conditions for normal unit operations to ensure that design safety features are Page 2 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIon StrategIes Integrated Plan available to respond to a design basis accident and direct the required actions to be taken when the limiting conditions are not met. The result of the beyond-design-basis event may place the plant in a condition where it cannot comply with certain Technical Specifications, and, as such, may warrant invocation of 10 CPR 50.54(x) and/or 10 CPR 73.55(p). (Reference Task Interface Agreement (TIA) 2004-04, "Acceptability of Proceduralized Departures from Technical Specifications (TSs) Requirements at the Surry Power Station," (TAC Nos. MC4331 and MC4332)," dated September 12,2006. (Accession No. ML060590273>> Flood and seismic re-evaluations pursuant to the 10 CPR 50.54(f) letter of March 12, 2012 are not completed and therefore not assumed in this submittal. As the re-evaluations are completed, appropriate issues will be entered into the corrective action system and addressed on a schedule commensurate with other licensing bases changes. The TMI Flex plan meets the "N+ 1" capability requirement described in NEI 12-06 section 3.2.2. No additional failures of any Structures, Systems or Components (SSC) are assumed. SSCs which are designed for operation and protected from the external event hazard are assumed to be available. No additional unavailability is assumed. Routes from the storage locations have not yet been assessed for hazard impact. This will be completed and communicated in a future 6-month update following evaluation. Additional staff resources are expected to arrive beginning at 6 hours. Ref: NEI 12-01 Rev 0, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities. Extent to which the Full conformance with JLD-ISG-2012-01 and NEI 12-06 is guidance, JLD-ISG-2012-01 expected with no deviations. and NEI 12-06, are being followed. Identify any deviations to JLD-ISG-2012-01 and NEI 12-06. Ref: JLD-ISG-2012-01 NEI 12-06 13.1 Page 3 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Provide a sequence of events Sequence of events timeline is provided in Attachment 1A. and ide?tify an~ ti:: Timeline walk through will be completed when detailed constr31.nt Iredq~lIre h or design and site strategy is finalized. success mc u mg t e technical basis for the time During this ELAP and LUHS beyond design basis external constraint. event, TMI has identified the following short time constraints: Ref: NEI 12-06 section 3.2.1.7 JLD-ISG-2012-01 section 2.1 The times to complete actions in the Events Timeline are based on operating judgment, the conceptual designs, and the current supporting analyses. The final timeline will be validated once detailed designs are completed and procedures are developed. The results will be provided in a future 6-month update. The items below provide a technical basis for time constraints listed in Attachment 1A, Sequence of Events Timeline. Load shedding (described below) is required to ensure the station batteries can provide vital instrument power for at least six hours. Preliminary calculation C-1101-734-E420-009 shows the following actions within the specified times achieve that objective:

  • Shutdown LO-P-9A & B within 35 minutes
  • Vent Main Generator Hydrogen and shutdown GN-P-2 within 35 minutes
  • Strip instrument systems to reduce vital instrument bus load within one hour
  • Break vacuum and shutdown LO-P-6 within one hour.

Establish FLEX Reactor Coolant System (RCS) Makeup capability within approximately 4 hours to maintain sufficient RCS inventory to support core heat removal. This judgment is based on expected leakage reduction from the installation of low-leakage RC-P seals. Conceptual design for low leakage RCP seal design and analysis to confirm this time requirement are not yet complete. Energize 480VAC MCC IA & IB using FLEX diesel generator within 6 hours to ensure vital instrument power is maintained. Set up a portable diesel driven pump to deliver river water to the FLEX condensate source. A makeup source to replenish the condensate supply may be required within 24 hours after a tornado. This capability is expected to take 4 Page 4 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIOn Strategies Integrated Plan people approximately 6 hours to accomplish. This action is performed early to provide margin. Preliminary analysis indicates there are no actions required to maintain containment. Action to maintain Spent Fuel Pool (SFP) cooling is not time critical. The spent fuel pool would not reach boiling in the first 24 hours; therefore, no makeup is required. (Reference I). The TMI mitigation strategy is not based upon the PWROG WCAP 17601-P ELAP mitigation strategy. Attachment IB was not included. TMI will complete analysis to demonstrate the viability of the planned core cooling strategy.

References:

1. ER-TM-TSC-0016, RCS AND SFP HEATUP AND INVENTORY BOILOFF FOLLOWING LOSS OF ACTIVE DECAY HEAT REMOVAL Identify how strategies will Deployment of FLEX is expected for all modes of be deployed in all modes. operation. Transportation routes will be developed from the equipment storage area to the FLEX staging areas.

Ref: NEI 12-06 section 13.1.6 Administrative programs will ensure pathways remain clear, and compensatory actions will be implemented when necessary. Identification of storage and creation of the administrative program are open items. An AT Item has been created to track both open items. Closure of these items will be documented in the 6-month update. Provide a milestone See Milestone Schedule (Attachment 2). schedule. This schedule should include: Exelon Generation Company, LLC (Exelon) fully expects to

  • Modifications timeline meet the site compliance dates provided in Order EA o Phase 1 049 with no exceptions. Any changes or additions to the Modifications planned interim milestone dates will be provided in a future o Phase2 6-month update.

Modifications o Phase3 Modifications

  • Procedure guidance development complete o Strategies Page 5 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIOn StrategIes Integrated Plan o Maintenance

  • Storage plan (reasonable protection)
  • Staffing analysis completion
  • FLEX equipment acquisition timeline
  • Training completion for the strategies
  • Regional Response Centers operational Ref: NEI 12-06 section 13.1 Identify how the TMI will apply administrative programs to establish programmatic controls will responsibilities, and testing & maintenance requirements.

be met. The FLEX mitigation strategy will be treated as an independent system which requires configuration controls Ref: NEI 12-06 section 11 associated with systems. Unique identification numbers JLD-ISG-2012-01 section 6.0 will be assigned to all FLEX components. Equipment associated with these strategies will be procured as commercial equipment with design, storage, maintenance, testing, and configuration control as outlined in JLD-ISG-2012-01 section 6 and NEI 12-06 section 11. Installed structures, systems and components pursuant to 10CFR50.63(a) will continue to meet the augmented quality guidelines of Regulatory Guide 1.155, Station Blackout. Standard industry PMs will be developed to establish maintenance and testing frequencies based on type of equipment and will be within EPRI guidelines. Testing procedures will be developed based on the industry PM templates and Exelon standards. Describe training plan Training materials for FLEX will be developed for all station staff involved in implementing FLEX strategies. For accredited training programs, the Systematic Approach to Training (SAT) will be used to determine training needs. For other station staff, a training overview will be developed and communicated. Describe Regional Response TMI has contractual agreements in place with the Strategic Center plan Alliance for FLEX Emergency Response (SAFER). The industry will establish two (2) Regional Response Centers (RRC) to support utilities during beyond design basis events. Each RRC will hold five (5) sets of equipment, four (4) of which will be able to be fully d~o~ed when reguested. The fifth set will have equipment Page 6of55

Three Mile Island Nuclear StatIon, Unit 1 MitigatIOn StrategIes Integrated Plan in a maintenance cycle. Equipment will be moved from an RRC to a local Assembly Area, established by the SAFER team and the utility. Communications will be established between the affected nuclear site and the SAFER team. Required equipment will be moved to the site as needed. First arriving equipment, as established during development of the nuclear site's playbook, will be delivered to the site within 24 hours from the initial request. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan. Page 7 of 55

Three Mile Island Nuclear StatlOn, Unit 1 MitigatlOn Strategies Integrated Plan Maintain Core Cooling & Heat Removal Determine Baseline coping capability with installed coping l modifications not including FLEX modifications, utilizing methods described in Table 3-2 of NEI 12-06:

  • AFWIEFW
  • Depressurize SG for Makeup with Portable Injection Source
  • Sustained Source of Water Ref: JLO-ISG-2012-01 section 2 and 3 PWR Installed Equipment Phase 1 Provide a generaL description of coping strategies using installed equipment including station modifications that are proposed to maintain core cooling. Identify methods (AFWIEFW) and strategy(ies) utilized to achieve this coping time.

Emergency Procedures will describe the FLEX Phase 1 coping strategy. The RCS will be cooled via Natural Circulation using the Once Through Steam Generators (OTSG). OTSG level will be maintained using the Steam-driven Emergency Feedwater pump. OTSG pressure will be controlled using the Atmospheric Dump Valves. This process is controlled from the Control Room for at least two (2) hours and then local control is required. Instrumentation required to control this process will be available as described in the Safety Functions Support section. The RCS temperature will be reduced to approximately 400°F to reduce RCS leakage and to reduce OTSG pressure to enable the backup feedwater capability. A condensate source of at least 200,000 gallons will be available for any Beyond Design Basis External Event (BDBEE). RCS inventory will be maintained to support sub-cooled Natural Circulation as described in the RCS Inventory section of this plan. In the event of an external flood, the RCS is cooled down and depressurized (-300°F, 250 psig) prior to the ELAP. The OTSG will be used for RCS heat removal in a manner similar to that above. If the OTSG is not available for core heat removal, core cooling is maintained using BWST or core flood tank gravity drain for RCS makeup for boil-off during the coping period. Details: Provide a brief TMI will use industry developed guidance from the Owners description of Procedures Groups, EPRI and NEI Task team to develop site specific / Strategies / Guidelines procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom 1 Coping modifications consist of modifications installed to increase initial coping time, i.e. generators to preserve vital instruments or increase operating time on battery powered equipment. Page 8 of 55

Three Mile Island Nuclear Station, Unit 1 MitigatlOn Strategies Integrated Plan based command and control strategies in the current EOPs. Identify modifications Reactor Coolant Pump Low Leakage Seals Key Reactor Parameters The following instruments will be available for Phase 1: RCS Press (RC-PT-949) PZR Level (RC-LT-777) RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) RCS Incore Temperatures (RC-TI-952) OTSG Pressure (MS-PT-950, MS-PT-951) OTSG Level (FW-LT-755, FW-LT-788) CST Levels (CO-LI-1061, -1063) TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the

                                                           ° plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification.

Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 9 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 2 Provide a general description of the coping strategies using on-site portable equipment including station modifications that are proposed to maintain core cooling. Identify methods and strategy(ies) utilized to achieve this coping time. The RCS will continue to be cooled via Natural Circulation using the Steam-driven Emergency Feedwater pump and the Atmospheric Dump Valves. Control of this process is maintained by operators locally at the Steam-driven Emergency Feedwater pump and the Atmospheric Dump Valves. Instrumentation to control this process is provided to the Control Room by the FLEX Diesel Generators described in the Safety Functions Support section. The backup feed water supply will be provided by the FLEX feedwater pumps submerged in the FLEX Emergency Condensate Storage Tank. These provide a suction boost for the diesel driven portable pump in tornado or earthquake events, or are used exclusively in an external flood event. These pumps are connected to use water from the Main Condenser Hotwell, the Condensate Storage Tanks or DW-T-2 (the "Million Gallon Tank") The FLEX feedwater supply to the OTSG is established via manual connections through the EFW Nozzles. (See Attachment 3C) When the OTSG is not available for RCS heat removal, the feedwater sources described above will be re-directed to the RCS via the FLEX primary header and the HPI lines. Condensate will be used to make up for RCS boil off. RCS water level will be maintained constant to control cooling and RCS boron concentration. Details: Provide a brief TMI will use the industry developed guidance from the Owners description of Procedures Groups, EPRI and NEI Task team to develop site specific procedures I Strategies I Guidelines or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications FLEX Feedwater System (see Attachment 3C). FLEX Storage Building These are conceptual designs. Changes will be provided in a 6-month update. Key Reactor Parameters The following instruments will be available for Phase 2: RCS Press (RC-PT-949) PZR Level (RC-LT-777) RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) RCS Incore Temperatures (RC-TI-952) OTSG Pressure (MS-PT-950, MS-PT-951) OTSG Level (FW-LT-755, FW-LT-788) CST Levels (CO-LI-1061, -1063) Page 10 of 55

Three Mile Island Nuclear StatiOn, Unit 1 MitigatIon StrategIes Integrated Plan Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 2 TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Storage / Protection of Equipment: Describe stora2e / protection plan or schedule to determine stora2e requirements Seismic The Steam-Driven Emergency Feedwater Pump (EF-P-l) is located in the Intermediate Building, a seismic Class 1 bUilding. FLEX Emergency Feedwater Pumps and FLEX Emergency Condensate Storage Tank design will conform to NEI 12-06 requirements. FLEX Emergency Feedwater Pumps connections are manual. The piping will conform to NEI 12-06 requirements and the connection is to the seismic class 1 EFW system. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Flooding The Steam-Driven Emergency Feedwater Pump (EF-P-l) is located Note: if stored below current flood level. in the flood protected Intermediate Building. then ensure procedures exist to move equipment prior to exceeding flood level. The Condensate Storage Tanks will maintain their structural integrity during the design flood event. FLEX Emergency Feedwater Pumps are submersible pumps, and are located inside the FLEX Emergency Condensate Storage Tank, located on the 292' elevation of the Turbine Building. The pumps and tanks will be designed for the flood condition. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Page 11 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIon Strategies Integrated Plan Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 2 Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Severe Storms with High The Steam-Driven Emergency Feedwater Pump (EF-P-I) is located Winds in the Intermediate Building, a tornado protected structure. Due to their location below grade inside the Turbine Building, FLEX Emergency Feedwater Pumps are protected from missile hazards. There are three condensate sources with at least 200,000 gallons available for EFW (CO-T-IA, CO-T-IB and DW-T-2). Due to the spatial distribution of these tanks and intervening tornado hardened structures, there is a high probability at least one of these three sources would be available after a tornado. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Snow, Ice, and Extreme All of the active FLEX components (EF-P-I, FLEX Feedwater Cold Pumps, Portable diesel driven feedwater pump) used for RCS heat removal are located within temperature controlled buildings. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. High Temperatures All of the active FLEX components (EF-P-I, FLEX Feedwater Pumps, Portable diesel driven feed water pump) are designed for operation with ambient temperature of at least I20F. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Page 12 of 55

Three Mile Island Nuclear Station, Unit 1 MitigatIon StrategIes Integrated Plan Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 2 Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections The Steam Driven Emergency FLEX Emergency Feedwater FLEX Emergency Condensate Feedwater Pump is located in Pumps will be installed in a Storage Tank is located in the the Intermediate Building. tank (FLEX Emergency Condenser Pit of the Turbine The backup feedwater source Condensate Storage Tank) BUilding. It is therefore uses the FLEX Emergency located under the North end of protected from tornado/missile Feedwater Pumps (submersible the Main Condenser. These hazards. FLEX piping, valves, pumps located inside the FLEX pumps will take suction from and connections (electrical & Emergency Condensate Storage either the main condenser or fluid) will meet NEI 12-06 Rev. Tank) and a portable diesel- the Condensate Storage Tanks. o protection requirements. driven pump (which will be Connections are also provided As the pumps it contains stored in a protected storage to the FLEX Emergency (FLEX Emergency Feedwater location and positioned in the Charging Pumps discharge Pumps) are submersible, Turbine Building when header for makeup to the Spent flooding is not an issue. needed). Fuel Pool or the RCS. All connections to pre-existing systems will be protected from A Ford F-750 has been Connections for a portable hazards described above. The procured to position portable diesel-driven pump will be designs have not been finalized. FLEX equipment from the provided on the FLEX EFW storage location to the required piping. The storage location for the locations. Routes have not portable equipment has not been finalized. been selected at this time. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 13 of 55

Three M'l I d N uc Iear S tatlOn, Uflit 1 e Isan . 1 M"ltIgatlOn Strategles I ntegrate d PI an Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 3 Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain core cooling. Identify methods and strategy(ies) utilized to achieve this coping time. Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required. A portable refueling vehicle with a large diesel oil bladder will be available on site to support refilling the portable equipment diesel tanks. An additional means (river makeup is available) of delivering condensate may also be developed, details to be provided in a future 6-month update. Details: Provide a brief TMI will use the industry developed guidance from the Owners description of Procedures Groups, EPRI and NEI Task team to develop site specific procedures / Strategies / Guidelines or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications No Phase 3 mods are required at this time. Key Reactor Parameters The following instruments will be available for Phase 3: RCS Press (RC-PT-949) PZR Level (RC-LT-777) RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) RCS Incore Temperatures (RC-TI-952) OTSG Pressure (MS-PT-950, MS-PT-951) OTSG Level (FW-LT-755, FW-LT-788) CST Levels (CO-LI-1061, -1063) TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the

                                                            ° plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification.

Deployment Conceptual Design (Attachment 3 contains Concej!tual Sketches) Strategy Modifications Protection of connections None None None Page 14 of 55

Three M*I I d N uc Iear StatlOn, Umt 1 e Isan . 1 M*fIlgafIon Strategles

                                                                           . Int eg!"a t edPI an Maintain Core Cooling & Heat Removal PWR Portable Equipment Phase 3 J                                    I Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan. Page 15 of 55

Three Mile Island Nuclear StatlOn, Unit 1 MitigatlOn Strategies Integrated Plan Maintain RCS Inventory Control Determine Baseline coping capability with installed coping" modifications not including FLEX modifications, utilizing methods described in Table 3-2 of NEI 12-06:

  • Low Leak RCP Seals or ReS makeup required
  • All Plants Provide Means to Provide Borated RCS Makeup PWR Installed Equipment Phase 1:

Provide a generaL description of the coping strategies using installed equipment including modifications that are proposed to maintain core cooling. Identify methods (Low Leak RCP Seals and/or borated high pressure RCS makeup) and strategy(ies) utilized to achieve this coping time. RCS Inventory will be maintained to prevent loss of OTSG heat removal capability. Letdown is automatically isolated after letdown cooling is lost. An RCS cooldown will be employed to maximize the length of time before hot leg voiding occurs. An RCS makeup source greater than the loss rate through RCP seals and controlled bleed off flow will be established before that leakage interrupts natural circulation and OTSG heat removal ..The lA and IB ES MCC will be energized using the FLEX diesel generator as described in Safety Functions Support section and the FLEX RCS makeup pump will be started within 4 hours. The analysis to confirm the timeline is not yet complete. When the OTSG is not available for RCS heat removal, makeup sources capable of matching the core boil-off rate will be used. If the Fuel Transfer Canal is not flooded, then makeup will be via BWST gravity drain. Gravity drain from a CF Tank will be used if the BWST is not available. Details: Provide a brief Confirm that procedure/guidance exists or will be deveLoped to description of support impLementation Procedures / Strategies TMI will use the industry developed guidance from the Owners / Guidelines Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications Reactor Coolant Pumps seals will be replaced with low-leakage seals in TIR21 (Fall 2015). 2 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment. Page 16 of 55

Three Mile Island Nuclear Station, Unit 1 MitigatIOn StrategIes Integrated Plan Maintain ReS Inventory Control Key Reactor The following instruments will be available for Phase 1: Parameters RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) ReS Incore Temperatures (RC-TI-952) RCS Pressure (RC-PT-949) RB Pressure (BS-PT-982B) PZR Level (RC-LT-777) CF-T Level (CF2-LT1, CF2-LT3) CF-T Pressure (CF1-PT1, CF1-PT2) BWST Level (DH-LT-808, DH-LT-809) TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification .. Notes: Core cooling and RCS inventory analysis is not complete at this time. Completion of this analysis is an open item. Closure of this item will be documented in a future 6-month update. Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan. Page 17 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIOn StrategIes Integrated Plan Maintain RCS Inventory Control PWR Portable Equipment Phase 2: Provide a general description of the coping strategies using installed equipment including modifications that are proposed to maintain core cooling. Identify methods (Low Leak RCP Seals and/or borated high pressure RCS makeup) and strategy(ies) utilized to achieve this coping time. Two (2) FLEX Emergency RCS Charging Pumps will be installed in the Patio area of 322' elevation or the Control Tower. These pumps will provide makeup to the RCS via manual connections downstream of the "C" and "D" HPI makeup valves. These pumps will take suction from either the BWST (preferred) or the Spent Fuel Pool. Reactivity analysis demonstrates that makeup for shrinkage from a 2500 ppm Boron source will provided the necessary boron concentration to maintain the reactor shutdown at 70°F without credit for Xenon reactivity. Therefore, recovering RCS inventory to greater than 100 inches in the pressurizer within 24 hours will ensure the reactor remains shutdown. (Reference #1) In the event that the Unit is in a refueling shutdown, the FLEX Emergency Feedwater pumps will also be able to supply the RCS for boil-off makeup. This will be accomplished by additional piping between FLEX Emergency Feedwater Pumps and FLEX Emergency RCS Charging Pumps.

Reference:

C-llOI-202-E620-471 Details: Provide a brief Confirm that procedure/guidance exists or will be developed to support description of impLementation Procedures / TMI will use the industry developed guidance from the Owners Groups, Strategies / Guidelines EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications FLEX RCS Make-up System Closure of this item will be documented in a future 6-month update. Key Reactor The following instruments will be available for Phase 2: Parameters RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) RCS Incore Temperatures (RC-TI-952) RCS Pressure (RC-PT-949) RB Pressure (BS-PT-982B) PZR Level (RC-LT -777) CF-T Level (CF2-LT1, CF2-LT3) CF-T Pressure (CFI-PT1, CFI-PT2) BWST Level (DH-LT-808, DH-LT-809) TMI's evaluation of the FLEX strategy may identify additional Page 18 of 55

Three M'l I d Nuc Iear StatlOn, Umt 1 e Isan . 1 M"ItlgatlOn Strategles I ntegrate dPI an Maintain ReS Inventory Control PWR Portable Equipment Phase 2: parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Storage / Protection of Equipment: Describe storage I protection plan or schedule to determine storae:e reouirements Seismic FLEX Emergency RCS Charging Pumps will also be mounted in the Patio area of 322' elevation of the Control Tower, which is a seismic class 1 building. FLEX Emergency RCS Charging Pumps connections are into the seismic class 1 HPI system. The BWST and Spent Fuel Pool are seismic class 1. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Flooding FLEX Emergency RCS Charging Pumps are located in the patio Note: if stored below current flood level, area of 322' elevation of the Control Tower, which is also above the then ensure procedures exist to move equipment prior to exceeding flood level. projected max river water level. The BWST structural integrity in a design flood condition will be maintained. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Severe Storms with High FLEX Emergency RCS Charging Pumps will be mounted in the Winds Patio area of 322' elevation of the Control Tower, which is a tornado protected structure. The BWST may not be available after a tornado. In this event, the Spent Fuel Pool will be used to provide RCS Makeup. Structures to provide protection of FLEX equipment will be Page 19 of 55

Three Mile Island Nuclear StatIOn, Unit 1 MitigatIOn Strategies Integrated Plan Maintain RCS Inventory Control PWR Portable Equipment Phase 2: constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Snow, Ice, and Extreme FLEX Emergency RCS Charging Pumps are located in the Control Cold Tower Patio area, which is temperature controlled. The BWST is maintained above a minimum temperature of 45°F. After an ELAP, the tank's mass and insulation will maintain this source for a significant period of time. The Spent Fuel Pool is located within a temperature controlled building and provides a backup source for RCS inventory. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. High Temperatures FLEX Emergency RCS Charging Pumps will be designed for operation with ambient temperature of at least 120°F. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Deployment Conceptual Modification (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections FLEX RCS Makeup Pumps FLEX Emergency RCS The Patio area of the Control will be used to provide RCS Charging Pumps will be installed Tower is a seismic class 1 Makeup. in the Patio area of 322' elev., tornado protected building. Page 20 of 55

I d Nuc Iear StatlOn, umt Three M*I1 e Isan . 1M** ItlgatlOn Strategles I ntegratedPI an Ma~ntain RCS Inventory Control PWR Portable Equipment Phase 2: Control Tower. These pumps The 322' elevation places the will be powered from INIB ES pumps above the maximum MCC. They will take suction flood level. from either the BWST or the Spent Fuel Pool via a new FLEX piping, valves, and connection. They will discharge connections (electrical & fluid) to the "c" and "D" HPI lines via will meet NEI 12-06 Rev.O a new connection downstream of protection requirements. the HPI makeup system valves. All connections will be by manual operation. Flex Emergency Feedwater (see FLEX Feedwater equipment (see FLEX Feedwater Pumps can be used to make- in RCS heat removal section) equipment in RCS heat up to the RCS or Spent Fuel removal section) Pool for Boil-off additions. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 21 of 55

Three M*IIe Isan I d Nuc Iear Staflon, U*t m 1 M*f I !gaf Ion Strategles

                                                                               . I   t ted PI an negra Maintain ReS Inventory Control PWR Portable Equipment Phase 3:

Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain core cooling. Identify methods (Low Leak RCP Seals and/or borated high pressure RCS makeup) and strategy(ies) utilized to achieve this coping time. Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required. A plan will be developed to re-supply borated water to the BWST or SF pool. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of support implementation Procedures / Strategies TMI will use the industry developed guidance from the Owners / Guidelines Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications None required Key Reactor The following instruments will be available for Phase 3: Parameters RCS Thot and Tcold (RC-TE-958, -TE-959, -TE-960, -TE-961) RCS Incore Temperatures (RC-TI-952) RCS Pressure (RC-PT-949) RB Pressure (BS-PT-982B) PZR Level (RC-LT-777) CF-T Level (CF2-LT1, CF2-LT3) CF-T Pressure (CF1-PT1, CF1-PT2) BWST Level (DH-LT-808, DH-LT-809) TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Deployment Conceptual Modification (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections None None None Page 22 of 55

I d Nuc Iear Stabon, umt Three M'I1 e Isan ' 1M"IbgatlOn Strategles I ntegrated PI an Maintain RCS Inventory Control PWR Portable Equipment Phase 3: Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049, Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies, Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06, Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update, This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan, Page 23 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Containment Determine Baseline coping capability with installed copingJ modifications not including FLEX modifications, utilizing methods described in Table 3-2 of NEI 12-06:

  • Containment Spray
  • Hydrogen igniters (ice condenser containments only)

PWR Installed Equipment Phase 1: Provide a general description oithe coping strategies using installed equipment including modifications that are proposed to maintain containment. Identify methods (containment spray/Hydrogen igniter) and strategy(ies) utilized to achieve this coping time. TMI-FLEX-002, MMP Containment Pressure Analysis, preliminary results show that Reactor Building pressure will remain below design pressure without any active means of RB cooling for any event where the OTSG is used to remove core heat. Emergency procedures will ensure containment isolation valves are closed. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications There are no modifications required at this time. Key Containment RB Pressure (BS-PT-982B) Parameters TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strate~es have been fully developed, Exelon will update the 3 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment. Page 24 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Containment integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 25 of 55

Three M*IIe IsanI d N uc Iear Staflon, U*t m 1 M*f IIKatlOn Strategles I negra t t e d PI an Maintain Containment PWR Portable Equipment Phase 2: Provide a general description of the coping strategies using on-site portable equipment including modifications tlUlt are proposed to maintain containment. Identify methods (containment spray/hydrogen igniters) and strategy(ies) utilized to achieve this coping time. TMI-FLEX-002, MMP Containment Pressure Analysis, preliminary results show that Reactor Building pressure will remain below design pressure without any active means of RB cooling for any event where the OTSG is used to remove core heat. Emergency procedures will ensure containment isolation valves are closed. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications Completion of TMI-FLEX-002, MMP Containment Pressure Analysis, is an open item. Any required modifications will be documented in a future 6-month update. Key Containment RB Pressure (BS-PT-982B) Parameters TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Storage / Protection of Equipment: Describe stora~e I protection plan or schedule to determine stora~e requirements Seismic NA. No equipment required. Flooding NA. No equipment required. Severe Storms with High NA. No equipment required. Winds Snow, Ice, and Extreme NA. No equipment required. Cold High Temperatures NA. No equipment required. Deployment Conceptual Modification Page 26 of 55

Three M*I Ie Isan I d N uc Iear Staflon, U*t m 1 M*fI IgafIon Strategles

                                                                           . Integrat edPI an Maintain Containment (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections None None None Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 27 of 55

I d Nuc ear Stabon, umt Three M*I1 e I san . 1M** ItigatlOn Strategles I ntegratedPI an Maintain Containment PWR Portable Equipment Phase 3: Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain containment. Identify methods (containment spray/hydrogen igniters) and strategy(ies) utilized to achieve this coping time. No Phase 3 equipment is required to maintain the containment function. Active means of RB cooling in Phase 3 may be developed. Details: Provide a brief NA description of Procedures / Strategies / Guidelines Identify modifications None. Key Containment RB Pressure (BS-PT-982B) Parameters TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update followinK identification. Deployment Conceptual Modification (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections None None None Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 28 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling Determine Baseline coping capability with installed coping'l modifications not including FLEX modifications, utilizing methods described in Table 3*2 of NEI 12*06:

  • Makeup with Portable Injection Source PWR Installed Equipment Phase 1:

When the core is fully loaded with fuel, Spent Fuel Pool (SFP) makeup is not a time constraint since the maximum SFP heat load is 2.7 MWth. Without any active means of cooling and an initial pool temperature of 100 degrees there would be at least 41 hours before boiling would occur and any inventory would be lost. The time until the water level reached the top of the active fuel is greater than 400 hours (Reference #1). The TMI plan provides a means to supply SFP makeup at 12 hours using the FLEX Feedwater capability as described previously and shown in Attachment 3C and 3D. If the core is partially or fully offloaded, the maximum SFP heat load is 8.9 MWth (Reference #2). Without any active means of cooling and an initial pool temperature of 100 degrees F, the pool would reach boiling in 12.6 hours. It would take 131.7 hours before the water level dropped to the top of the active fuel. With the additional resources available during outage conditions, SFP make-up can be established within 8 hours. (Reference #1) Initial calculations were used to determine the fuel pool timelines. Formal calculations will be performed to validate this information during development of the detailed design. These strategies utilize a vent path for steam. The effects of this steam on other systems and equipment will be evaluated, and the results will be provided in a future 6-month update. References

1. ER-TM-TSC-0016, RCS AND SFP HEATUP AND INVENTORY BOILOFF FOLLOWING LOSS OF ACTIVE DECAY HEAT REMOVAL
2. CC-TM-AOP-0202, Rev Og, Beyond Design Basis External Event - Basis Document.

Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. 4 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment. Page 29 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Identify modifications Spent Fuel Pool Instrumentation. Closure of this item will be documented in a future 6-month update. Key SFP Parameter Per NRC Order Number EA 12-051, "Order Modifying Licenses with regard to Reliable Spent Fuel Pool Instrumentation" and NEI 12-02, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation". TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 30 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling PWR Portable Equipment Phase 2: Provide a generaL description of the coping strategies using on-site p01tabLe equipment including modifications that are proposed to maintain spent fueL pooL cooling. Identify methods (makeup via portabLe injection source) and strategy(ies) utilized to achieve this coping time. The strategy described for Phase 1 applies in Phase 2 & 3. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to support description of Procedures implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications Spent Fuel Pool Instrumentation FLEX Feedwater System FLEX RCS Make-up System Closure of these items will be documented in a future 6-month update. Key SFP Parameter Per NRC Order Number EA 12-051, "Order Modifying Licenses with regard to Reliable Spent Fuel Pool Instrumentation" and NEI 12-02, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Storage / Protection of Equipment: Describe storage I protection plan or schedule to determine storage requirements Seismic Flex Feedwater and RCS makeup equipment protection was described previously. Refer to RCS heat removal & RCS Inventory sections. There is no additional equipment for SF makeup. Flooding Flex Feedwater and RCS makeup equipment protection was described previously. Refer to RCS heat removal & RCS Inventory sections. There is no additional equipment for SF makeup. Severe Storms with High Flex Feedwater and RCS makeup equipment protection was described Winds previously. Refer to RCS heat removal & RCS Inventory sections. There Page 31 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling is no additional equipment for SF makeup. Snow, Ice, and Extreme Flex Feedwater and RCS makeup equipment protection was described Cold previously. Refer to RCS heat removal & RCS Inventory sections. There is no additional equipment for SF makeup. High Temperatures Flex Feedwater and RCS makeup equipment protection was described previously. Refer to RCS heat removal & RCS Inventory sections. There is no additional equipment for SF makeup. Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections Flex Feedwater and RCS makeup equipment deployment was described previously. Refer to RCS heat removal & RCS Inventory sections. There is no additional equipment for SF makeup. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 32 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling PWR Portable Equipment Phase 3: Provide a general description o/the coping strategies using phase 3 equipment including modifications that are proposed to maintain spent fuel pool cooling. Identify methods (makeup via portable injection source)and strategy(ies) utilized to achieve this coping time. The strategy described for Phase 1 applies in Phases 2 & 3. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications None required for Phase 3. Key SFP Parameter Per NRC Order Number EA 12-051, "Order Modifying Licenses with regard to Reliable Spent Fuel Pool Instrumentation" and NEI 12-02, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. " TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Deployment Conceptual Design (Attachment 3 contains Concel!tual Sketche& Strategy Modifications Protection of connections None None None Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and Page 33 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 34 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Safety Functions Support Determine Baseline coping capability with installed coping5 modifications not including FLEX modifications. PWR Installed Equipment Phase 1 Provide a generaL description of the coping strategies using installed equipment including station mod(fications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times. The electrical power supply to maintain vital instruments is provided in Phase 1 by the Station batteries and vital instrument bus inverters. With timely load-shedding of large DC motors and stripping loads from non vital instrument systems, vital instrument power can be ensured for at least 6 hours (Reference #1). Inverter and battery room area doors are opened to provide ventilation of critical SSC during Phase 1 (Reference #2) Instrument air for remote operation ofEFW Feed Valves and Atmospheric Dump Valves is available at least 2 hours. After that local control is available. Exelon Generation Company, LLC (Exelon) intends on maintaining the Command and Control function within the Main Control Room. Habitability conditions will be evaluated and a strategy will be developed to maintain Main Control Room habitability. The strategy and associated support analyses will be provided in a future 6-month update.

References:

1. CI101-734-E420-009, RO
2. OP-TM-AOP-034, Loss of Control Building Cooling Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of support implementation Procedures I Strategies I TMI will use the industry developed guidance from the Owners Guidelines Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications None required for Phase 1 Key Parameters TMI's evaluation of the FLEX strategy may identify additional 5 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment. Page 35 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan. Page 36 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Safety Functions Support PWR Portable Equipment Phase 2 Provide a generaL description of the coping strategies using on-site portabLe equipment including station modifications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times. Two (2) Diesel Generators along with Fuel Tanks, will be pre-staged in a protected enclosure on the 322' elevation of the Turbine Building. These generators will be available to supply power to the lA and IB ES MCCs via a manual connections through the IP and IS 480V ES Buses. This equipment will be configured such that the lA and IB ES MCC can be energized within four hours of an ELAP event (or sooner based on potential RCS inventory requirements). Each diesel will be capable of providing power for all FLEX needs (i.e., the FLEX equipment, Vital Instrument Buses, and Emergency lighting). Exelon Generation Company, LLC (Exelon) intends on maintaining the Command and Control function within the Main Control Room . Habitability conditions will be evaluated and a strategy will be developed to maintain Main Control Room habitability. The strategy and associated support analyses will be provided in a future 6-month update. Details: Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation / Strategies / Guidelines TMI will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Identify modifications FLEX Electrical Power Supply. Closure of this item will be documented in a future 6-month u~date. Key Parameters TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Storage / Protection of Equipment: Describe storage /l!I"otectionJ!lan or schedule to determine storage requirements Seismic Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Page 37 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Safety Functions Support PWR Portable Equipment Phase 2 Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Flooding The FLEX diesel generators and fuel oil tanks will be located Note: if stored below current flood level, then above 322 ft elevation of the Turbine Building. ensure procedures exist to move equipment prior to exceeding flood level. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Severe Storms with High The FLEX diesel generators and fuel oil tanks will be protected Winds from tornado winds and missile hazards. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Snow, Ice, and Extreme Cold The FLEX diesel generators and fuel oil tanks will be located with a temperature controlled building (Turbine Bldg). Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11. The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Page 38 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Safety Functions Support PWR Portable Equipment Phase 2 High Temperatures The FLEX diesel generators will be designed for operation with an ambient temperature of at least 120°F. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11 . The schedule to construct a permanent building is contained in Attachment 2 and will satisfy the site compliance date. Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to TMI. Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections Establish FLEX AC Power The Flex Diesel Generators will FLEX piping, valves, and Source. be manually started and loaded. connections (electrical & fluid) All connections to existing will meet NEI 12-06 Rev.O systems will be manual. protection requirements. Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for TMI during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan. Page 39 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Safety Functions Support PWR Portable Equipment Phase 3 Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times. Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required. The FLEX diesel generator fuel supply provides a minimum of 7 days of fuel, and a connection is provided for fuel oil makeup from a portable source. The FLEX diesel generator design will include provisions for connection with a portable 480 VAC generator. Details: Provide a brief TMI will use the industry developed guidance from the Owners description of Procedures Groups, EPRI and NEI Task team to develop site specific procedures / Strategies / Guidelines or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs Identify modifications None required. Key Parameters TMI's evaluation of the FLEX strategy may identify additional parameters that are needed to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. NEI 12-06 Rev. 0 Section 3.2.1.10 and any differences will be provided in a future 6-month update following identification. Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches) Strategy Modifications Protection of connections None None None Notes: Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the integrated plan for (Plant Name) during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 IntegJated Plan. Page 40 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan PWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Performance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance / PM equipment requirements Diesel driven X X 240 gpm, 250 psid Equipment maintenance pump (1) and testing will be performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 section 6 and NEI 12-06 section 11. Diesel driven X X 600 gpm, 245 psid Equipment maintenance pump (2) and testing will be performed in accordance with the industry templates, as outlined in JLD-ISG-20l2-01 section 6 and NEI 12-06 section 11. Two (2) X X 2-speed, high volume, Equipment maintenance Portable 120V and testing will be Fans performed in accordance with the industry templates, as outlined in JLD-ISG-2012-0l section 6 and NEI 12-06 section 11. Page 41 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan PWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Peiformance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance I PM equipment requirements Three (3) X X 480VAC Equipment maintenance Portable 500kW and testing will be Generators performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 section 6 and NEI 12-06 section 11. Ten (10) X 240-watt LED per unit Equipment maintenance Portable and testing will be lights with performed in accordance I tripods with the industry templates, as outlined in JLD-ISG-2012-0l secti on 6 and NEI 12-06 section 11. Three (3) X Iridium 9555 Equipment maintenance Satellite and testing will be Phones performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 section 6 and NEI 12-06 section 11. Page 42 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan PWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Performance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance / PM equipment requirements Ford F-7S0 X X X X Transportation, debris Equipment maintenance removal, fuel oil and testing will be delivery performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 I section 6 and NEI 12-06 section 11. Page 43 of 55

Three Mile Island Nuclear Station, Unit I Mitigation Strategies Integrated Plan PWRlBWR Portable Equipment Phase 3 Use and (potential/flexibility) diverse uses Performance Criteria Notes List portable Core Containment SFP Instrumentation Accessibility equipment Note: The RRC equipment has not been procured at the time of this submittal. Once the SAFER committee determines the equipment specifications for bid, updates will be made as necessary to this table. The Phase 3 portable equipment table will be updated once all of the ~uipment has been procured and placed in inventory. Medium Voltage Diesel X X X X X 2 MW output at 4160 Vac, three phase

  • Generator must be common commercially Generator available.
  • Must run on diesel fuel.

Low Voltage Diesel X X X X X 500 kW output at 480 Vac, three phase

  • Generator must be common commercially Generator available.
  • Must run on diesel fuel.

Positive X 1000-3000 psi shutoff Must run on diesel fuel displacement head, 60 gpm capacity High Pressure Pumps (PWR only) Low Pressure X X X 300 psi shutoff head, 2500 Pump gpm max flow Low Pressure X X 500 psi shutoff head, 500 Pump -- gpm max flow Page 44 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan PWRlBWR Portable Equipment Phase 3 Use and (potential/flexibility) diverse uses Perfomumce Criteria Notes List portable Core Containment SFP Instrumentation Accessibility equipment Low Pressure X 110 psi shutoff head, 400 Pump gpm max flow submersible I Low Pressure X X 150 psi shutoff head, 5000 Pump gpm max flow Air X 120 psi minimum Compressor pressure, 2000 scfm -~~ Page 45 of 55

Three Mile Island Nuclear Station, Unit I Mitigation Strategies Integrated Plan Phase 3 Response Equipment/Commodities Item Notes Radiation Protection Equipment The RRC will not stock this type of equipment but this equipment will be requested

  • Survey instruments from site-to-site and utility-to-utility on an as required basis.
  • Dosimetry I
  • Off-site monitoring/sampling Commodities The RRC will not stock these commodities but they will be requested from site-to-
  • Food site and utility-to-utility on an as required basis.
  • Potable water Fuel Requirements 300 - 500 gallon bladders that can be delivered by air
  • Diesel fuel Heavy Equipment TBD during site specific playbook development
  • Transportation equipment Redundant Phase 2 equipment to be located at RRC
  • Debris clearing equipment Page 46 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Attachment lA Sequence of Events Timeline Action Elapsed Action Time Remarks I Applicability item Time Constraint YIN 6 1 0 Earthquake or Tornado Event Causes LOOP NA Plant @100% power and damages unprotected equipment 2 0 All control rods inserted and reactor is N/A Failures per shutdown. JLD-ISG-Z01Z-Ol and NEI lZ-Emergency Diesel Generators fail to energize 06 ES buses. 3 0 EFW actuated. N Automatic plant response Steam driven pump, EF-P-l, supplies feed water. MSSV & ADV control OTSG pressure 4 < 1 min EOP initiated N 5 <2 min Letdown isolates (MU-V-3) automatically on N This is a pre-condition for high temperature. item 6 3 min Operators ensure each of the following are N closed: Letdown isolation (MU-V-3) RCP Controlled Bleed Off Isolation Valve (MU-V-Z6) 7 < 5 min Operators attempt to start and load SBO N Failures per JLD-ISG-Z01Z-Ol Diesel Generator, and identify SBO DG is and NEI1Z-06. This signals inoperable. an ELAP condition. 8 < 10 min Operators verify core cooling via OTSG with N RCS natural circulation, and throttle ADV to stabilize OTSG pressure 9 15 min Operators locally open Main Condenser vent N This is a pre-condition to to atmosphere (Break Vacuum) and line up reduce DC loads, LO-P-6 and valves to vent Main Generator HZ to GN-P-Z. atmosphere 10 15 min Operator secures FW Pump lube oil pumps Y DC load shedding required to LO-P-9A and LO-P-9B maintain instrument buses. (C-llOl-734-E4Z0-009). 11 30 min Operator throttle open ADV to initiate a N Pre-condition for item Z6. cooldown to 400F at approximately 300 F/HR 12 30 min Operator locally opens doors to inverter and Y This condition is part of the 6 Instructions: Provide justification if No or NA is selected in the remarks column If yes, include technical basis discussion as requires by NEI 12-06 section 3.2.1.7 Page 47 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan battery rooms for ventilation. basis for acceptable FLEX equipment cooling. 13 30 min Operator opens breakers on vital instrument V load shedding required to buses to shutdown instrument systems not maintain instrument buses. required for ELAP mitigation. (C-llOl-734-E420-009). Main Generator pressure is less than 15 psig, DC load shedding required to 14 35 min operator secures Main Generator Seal Oil V maintain instrument buses. Pump (GN-P-2). (C-ll01-734-E420-009). When Main Turbine speed is reduced or DC load shedding required to 15 1 hour within one hour of the event, Main V maintain instrument buses Turbine lube Oil Pump lO-P-6 is shutdown. for 6 hours (C-ll01-734-E420-009). 16 1:30 Operators locally lineup flEX Emergency N Pre-condition to Diesel Generator for operation. item 18 17 2:00 Operators locally lineup flEX RCS Charging N Pre-condition to Pump from BWST or Spent Fuel Pool to RCS item 22 18 2:15 Operators locally strip loads from lP/lS 480V N Pre-condition to Buses & lA & lB ES MCC to prepare to load Item 19 flEX diesel generator Operator locally starts flEX Emergency Pre-condition to 19 2:30 Diesel Generator and locally closes breakers N Item 20 to energize lP or lS 480V bus Cross tie IP & 15 480V Buses Pre-condition to 20 2:35 Energize lA/1B ES MCC from lP/1S 480V Bus N Item 21 21 2:45 Energize selected loads on lA and lB ES MCC V Must be accomplished prior Battery Chargers to 6-hour to ensure vital AC Sources to Inverters instrument power is FLEX Emergency RCS Charging Pumps maintained FLEX Emergency Feedwater Pumps (C-ll01-734-E420-009 ). Emergency lighting Precondition to 22 3:00 Start FLEX Emergency RCS Charging Pumps to N items 25 and 30 restore RCS inventory and initiate boration. Dispatch personnel to move diesel-driven Provide B/U for Steam 23 3:00 feedwater pump into the turbine building. N Driven Emergency Feedwater Pump Complete backup feedwater pump Provide B/U for Steam 24 4:00 connections to condensate supply and N Driven Emergency feedwater header. Feedwater Pump Backup feedwater capability is now available. Initial RCS cooldown complete. y Analysis to confirm RCS 5:30 Approximate conditions are as follows: conditions support natural 25

  • Incore temperature 400F (ReS heat circulation throughout this removal via OTSG using natural coping period is not yet circulation) complete. Results will be Page 48 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan

  • OTSG A & B Pressure 110 psig (being available in first 6-month controlled with ADV) update
  • RCS Pressure 410 psig (being controlled with RCS makeup)

Provide B/U for Steam 26 6:00 Complete backup feedwater pump N Driven Emergency connections to condensate supply and Feedwater Pump feedwater header. Backup feedwater capability is now available. Dispatch personnel to position a diesel- Precondition for item 28 27 driven portable pump at the ramp to the 7:30 river, and route discharge hose to a N functional condensate source (B CST or hotwell). Diesel-driven portable pump is set up to draft After a tornado, condensate water from the river and makeup to a y may be depleted in 20 hours. 28 10:30 Condensate Storage Tank or directly to the hotwell. Line-up FLEX condensate feed to the Spent y Spent fuel pool would not 29 12:00 Fuel Pool. Monitor SF pool level and add boil within 40 hours. water as needed to maintain level. Xenon reactivity worth 30 15:00 RCS boron concentration exceeds cold Y reduces below initial shutdown concentration requirement equilibrium concentration at approx. 24 hours. 24:00 RRC (Regional Response Center) resources N

Reference:

JLD-ISG-2012-01 31 begin arriving on site. and NE112-06 24-72 Transition from Steam Driven Emergency N Steam supply to the Steam 32 Hours Feedwater pump to FLEX Emergency Driven Feedwater pump is Feedwater Pumps diminishing. 33 24-72 Continue to maintain critical functions of N End of analytical simulation. Hours Core Cooling, RCS Inventory Control and spent fuel cooling. Note: This timeline is based on best available information. It is subject to change based on outstanding analysis results and will be updated during a 6-month update. Page 49 of 55

Three Mile Island Nuclear Station, Unit 1 Mitigation Strategies Integrated Plan Attachment 2 Milestone Schedule Original Target Activity Status Completion Date {Include date changes in this column} Submit 60 Day Status Report Complete Submit Overall Integrated Complete Implementation Plan Contract with RRC Complete Recurring action, Submit 6-month updates Ongoing Aug and Feb Modification Development Oct 2014

  • Phase 1 modifications N/A Oct 2014
  • Phase 2 modifications Contract Awarded for TMI Oct 2014
  • Phase 3 modifications N/A Modification Implementation Nov 2015
  • Phase 1 modifications N/A Nov 2015
  • Phase 2 modifications Aug 2013 - Nov 2015 Nov 2015
  • Phase 3 modifications N/A Procedure development Nov 2015
  • Strategy procedures Note 1 Nov 2015
  • Maintenance procedures Note 1 Jul2015 Staffing analysis Note 1 Nov 2015 Storage Plan Note 1 Nov 2015 FLEX equipment acquisition Note 1 Nov 2015 Training completion Note 1 Jul2015 Regional Response Center (will be a standard date from Operational RRC)

Nov 2015 Unit 1 Implementation date Note 1 Note(s):

1. Exelon will update the status of ongoing and future milestones in the Integrated Plan for TMI during a scheduled 6-month update. This update will include any changes to the milestone schedule as submitted in the February 28, 2013 Integrated Plan.

Page 50 of 55

Attachment 3A FLEX Diesel Generator Conceptual Design Attachment 3 Conceptual Sketches Page 51 of 55

Attachment 3A FLEX Diesel Generator Conceptual Design 11J'lEINE SJLDING m;:J FlJ.ME NCRTH WAll I ~ AARE<;TOR I

                                                            ~UiT                                                                             I Fill.

l O'IE'!Fl.ClII r-L-=----l /~~~~~ 0" _._ .. ___ 1 ~

                                                                                                                                            ~1                  ~
                                                                                                                                                                                ~

r-- i Fua OIL i EXHAUST SLENCER

         ~"                   1                   @I L _____ '::

STC'lACE TA\k FO-T-6A

                                                        'T                                                                                           II\II F\.J.ME
                           ~~                                           ~.
                                                                                                                                                                 >RRESTOR 1--1                                                   H O'lAIN 1                                                                                                   6" I - - O"/E'(FLClI'I    r-L':"---l                  /?~AI~*:s EXtilUST
FUEl.. ClL  : Sl.ENCER
                  ~"          1L _____(Q)         _ 1 r-- ~4 5TCAAC£ TA'k FC-T--69

___ ':lA~ _ _ _ _ _ _ _ _ _ _ _ _ I f ~4 ,,12, I TU~N~2~*~~~INC r---~~ m AUJt ------------------------ L-T'------~~_i' EOILER I Fua OIL  : TRoNSfE'< o~hlPS I PORTA!!lE II.II<E-U o FU-P-IA/ III  : 2" I r--'> mOil .... K. CONNECl1ON ~-j I BOI..E'l r-~,?...J I ~--~ CONCEPTUAL

         ~"                                          I Jf" l---G I          \...:.                    I SUPPLY        I cr-J -1                  I:                                 DESIGN                                      I tAIt"-l: . . . .  ~_f'Ul:lcas.CZ'It.-=

HETUI<N 1 RO'" 'T-J FO-T-l, EMJIJ. FO~~-I'" ------------~~---------~ WI - FlEX FLUIi DI.t,G!lIoN TllRIllNE 6UIUll'G DIESEL GE~EflATOR SYSlEIi EL 305'-U' CC-1II-~0I'-O?02 ~TT.-ICHIJa.T " Page 52 of 55

Attachment 3B FLEX Electrical Distribution Conceptual Design

      --r-- l'  2D
                            ;;> 1!!CV ES F.lJS
                                   ~I~
                                    '1'      lC
                                                                ----:r------
                                                                            ~T' 4:.
                                                                                                              ---J.
                                                                                                                      .. -[. 11-IS ~8:U
                                                                                                                                            --r-ES liaS 0*'

T, Ie

                                                                                                                                                                    ---T---

I 2C I... I... ..

        ~                     ~--i                                     '.:---1                                   t.~--i                     '_~--l
                                                                                                                                                                     <>-1
          ~ 600~                                                            [~+J 80~                                                           cb 12DD~

[1]' 4- 120010 -*]' L+ 1~'2 8I)[lto ch*~ ~.~ l lP' 2

                                                                                                                                                                                               ~~H
                                    ~                                       ~                                         ~,
                                    .~                                      ~.                                        ~.
                                                                              ~-~                                                               '[                     .J,T         TRANSFER r----~-&:CA
                                                                                                                                                                               ---:-, ,       I
                                                                                                                                                                                                                "..~
                                                                                                                                                                                                                &:CoI\
0) Ii
                                         ------                                                                    ---.                          I                TEST LOAD Bo\NK   7--

I p-' ___ J

                                                                                                                                                                                                                ~

I I ole CONNEC1100\ CO~NEC113~~ GEN. OR R'IlSFER SIIIITCH r----'I ,.--.. E!r-Y-9A IT\ ~:~~"t"It,gj ~"fuLE'E RB HI<'I UOC L.._ _+,---iC"'70 I I 6D~ '<Y ~ I i 10 E5 W'-C Lr:~---T~~ 0' j----"  !~ER  !'ER--------T~-!.~~f~~

                                                                        ~\

TEST 1..00\0 3:'NK Die CO~~ECT10N ,-..  : 1"c

                                                                                                                                                                            ,)               )               ':',                          )
0: I  ;,-,
                                              ~L1ERN.1E     F'EEJ        7010                      ON FO'I
                                                                                                                                                     ! -'       1-'
I R~

f I FOR Auxlu:.me; J CON~ CIESEL G£P,.

                                                                                               ~~~ 1~

Of! IU su c~ CT:'2 w...u RO lID \let 1N,'ERlE~ CHARGER HATTlW I EMElitEI>CY rv""'('"Y'"'. UCHTNC CT-E E\IEIlGENCY

                                                                                                                                                                                                                     'IDlTlJoTON
 -l:lAR                !,1,l T~----r~;---r~~5 ucc I~R                                                    I'~          f--Ji
                         'I                 :             }               }                  :             )              )                                                                  )                                              )

j) i' I I

  • I I

I J

  • I I I I CT-I 'A I~
                                 ....nEAT Ie HATTERY CT-2 EuEilGENCY
                                                                                  >¢=¢:¢<,

CO'/TRO\. EUlG. 'E'!1Eli NO:!II~L CH!.FiGER CWtRCS UCHJ1/'G  : L1:.IIl1NG C1:'5 TEM!"l,

                                                                                  'lo.TlJoTON fP-l'-2U                                       fP-l'-IU

_11£ "";-l"1 f1I): &ItT c:tnc_ EMJsg. CONCEPTUAL DESIGN 1111 fLE)( ElEClRlCAL OlsrRt3UTI!l~ O~E-LI!>E fP-P-I:' f' -I'-2~ cc-rld-~01'-0202 ATfA::Ht.lE~1 3 Page 53 of 55

Attachment 3C FLEX Feedwater Conceptual Design (--____ _ _ - -__ ~OSE llISCH. r-----------------------------------r--r--=~---~----- i ~~U +~ 110" ....___..E~!:.~ __ .., .---___~:!_:~~I_.., . . ___ ~_-I=3_ ___.., k H:;";.t--!'E~~____.., ltU" ~ I I I I I I I I I I I I 1"0 V'4A

          ~   -

I I II I I I I II I I 1 II II I I II I II IL~-.,.~ __12-~J [gJ I I ~-'

                                                                                 ~     I                         I I

I I I I I L-*_.J lil I I I I CO-Y1CA L __________ J I CO-V10B L __________J L-----T-----J CO-";2 L-----r-----J TO CTSG a~ l EF-VI~!I Ie'" I :10

                                                                                                                              ,~

f- !J~-\'211 110" ---- lr "" i

                                                                                                                                                                                      - '--.,I I
  ..~;:t-J------l------B-"-----J                                                                                          1                 $i)~-~30              fI          CQ-\Il
           "'_ .. '                      Ef-V1f3:                                                                         I                  I EF-P-I                                                          i'7'                                             l.---vr--L~--..j
D'Ii-V31 ()1I-~J5 I' 2" L----~---T.E:Jr-------------------....,J , CONCEPTUAL CO-ViolS C04'1 J TO FlEX RCS/SF DESIGN HE'ADER 6" (ATTACH 0) r----- ,iiY-l
                               ~I_ _ ~

DISCH. *--7.________ J" lEU" H:JSE I" ~TI

                                                                                           ....---~1:!   i
                                                                                                         , I i

EF-'r.i20

                                                                                                                                                                                                                   ---lX/--        (JJSG A D FS-P-l5/16                          6" SIC;HTCl...ASS

(>322' ElEV,) I' I : J" J HI----...!~--/ --1 3' TEMF HOSE

                                                                                       "!                                      PI                                                    \V I

_ _ _...1SUCT. A..EX PUIIP DIESEL DRI'/E'I ir: --------1: - ---- 6' J 1 i I L' _________ J FlEX FEEJ'IIAlER HEAO['l TU1llllNE BUII.DI~C EL J22'-0" I

                                                                                                                                                                                                  ?          S" FROLI EF-P-I---{)Ii:i;;r]---,--lXt-- (JJSG 3 J'

EF-VJOC 3' Ef-',52C FLEX FEEIlWATER

                                                                    <l         <l f   2
                                                                                                                                                                                                               £       Ef-V!j8 T~,\K
                                                "'-T-'                                                                                         IN1E~IIEUIATE UUll!lI~:;

l' !i" T.*NK/?JIA? SKID  ! _1~ I ~'\ ~,I ,~: EL 295'-0" ~ BE 'lttJ-T'III PUll JIIDN4!IfMI TuRBINE 9I.DG 292' L_ Nt~ FLEX FEEl'N~,lE'l PUl PS EulIJ. FI'-fl-2A/2B r~1 FLEX FLO'll DIAGRAM FEEDII'ATtR SYSTEM CC-Thl-~DP-0202 ATT~CHuEt./l' C Page 54 of 55

Attachment 3D FLEX RCS & SFP Makeup Conceptual Design 1lII'ST

      ,.-----------------,          ,                                      SOfNT FuEl.

I 2J7,OOO C!UONS I POOlS ~ AIIO B I AV"ILAUlE "IJCV£ I r-----------, I 32.' ELEV MIN LEVEL or a 5U FT I

                                    ,                              I3JJ El.E".'

t I CT-r-r----'

                                                                                       .. I\.~ I         1 I,                            I,                      I"'-~-+-      220,OOIl GAU..ONS     I         I I  Sf-V16'     A""ILA!lLE A1!O'lE:             I                                                      ~.uXIUARY        RE:.'.C1D~

I J L -_______________ ~ I I !I 330' El..fY. 0 I ,4" 9ULlJINC BUILDI\~ I I I , IIIN I.D'EL Of I " EL 305'-0" I ,, I II I r.' n~ L_~~'=--~~ __ J I I, IIU?S .:. ~4 ~L-Vl07C

                                                                                                                                     ""~*(>-;;;-"~-T-:-                     ~- ';"-;;'-

I , I i i ~ ,)$0 " I i4" SF-V4 I ','; -'----C><;

                                                                                                                                                                                  ;3JS Ie'                                                       ,I I                                                                                                                                                                3/1"        I FeEL H-'N!:u~:;

I

                                                                                                                                                                  ~J-IIHJC    I II EULDING El. ~Al'_O° I

i L!J I I 12, I t---+4-~-- ~ ~., M~-Vl07D 4" ~_.J __ ... W?S Sf-VI9 'f-'v7(l SF-Vl6 SF-VJ7 IlO2-E~l>------l-----EE3---N----- I.IU-Vl1 I "ENET 2" I m~

                                                                                                                                                                ,)2-          ,

V2' I I 3/1" I VU-III4.lD

                                                                                                                 ~ .. HOSE   CON~,

l!J J lEt.l? CO~N. fROM , FS-f'-'S!16 OISCH. ' RCS/Sff' t.lL rUllI'S (TURBINE ELJG) FP-P-1A/19

                                                   '---,~"-     --------------------

CO'TRCL BUILillNG rAllO EL 322'-3" CAD fiLE ~AVE: 1"1 f\.£)( RC ... NO ~

                                                                                                                                                          &eJIJ.

WI flEX flO'll ClAGRLt.l REA~TOR cOOlA~r ~D Sf'EtIT flU "COL SYSTEM Page 55 of 55}}