Update to Correspondence Addressees and Service ListsML17111A527 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle, 07100008 |
---|
Issue date: |
04/20/2017 |
---|
From: |
Jim Barstow Exelon Generation Co |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
RS-17-057 |
Download: ML17111A527 (8) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle, 07100008 |
---|
Category:Letter type:RS
MONTHYEARRS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-052, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-047, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations2024-03-14014 March 2024 Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS2024-02-23023 February 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release 2024-09-09 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Nine Mile Point]] OR [[:Oyster Creek]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Limerick]] OR [[:Ginna]] OR [[:Clinton]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:07100008]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Nine Mile Point]] OR [[:Oyster Creek]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Limerick]] OR [[:Ginna]] OR [[:Clinton]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:07100008]] </code>. |
Text
Exelon Generation oc 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com RS-17-057 April 20, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455, and 72-68 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317, 50-318, 72-8 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket Nos. 50-461 and 72-1046 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237. 50-249, and 72-37 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket Nos. 50-333 and 72-012 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373, 50-374, and 72-70 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352, 50-353, and 72-65 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220, 50-410, and 72-1036
U.S. Nuclear Regulatory Commission April 20, 2017 Page2 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 and 72-15 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Facility Operating [Possession Only] License No. DPR-12 NRC Docket Nos. 50-171, 50-277, 50-278, and 72-29 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket Nos. 50-244 and 72-67 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 Exelon Generation Company, LLC 10 CFR 71 - Packaging and Transportation of Radioactive Material NRC Docket No.71-008
Subject:
Update to Correspondence Addressees and Service Lists
Reference:
Letter from D. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Update to Correspondence Addressees and Service Lists," dated January 6, 2016 Exelon Generation Company, LLC (EGC) is providing an updated correspondence addressee and service list. Since the previous update, EGC has acquired the James A.
FitzPatrick Nuclear Power Plant. A change is being made to the EGC station addressees at this time to incorporate the James A. FitzPatrick Nuclear Power Plant. The EGC correspondence addressees were last provided in the referenced letter.
As stated in previous updates, EGC requests that copies of correspondence pertaining to individual nuclear sites be addressed to Mr. Bryan C. Hanson (Senior Vice President, Exelon Generation Company, LLC, President and Chief Nuclear Officer (CNO), Exelon Nuclear).
EGC requests that copies of correspondence pertaining to individual nuclear sites addressed to Mr. Bryan C. Hanson (Senior Vice President, Exelon Generation Company, LLC, President and Chief Nuclear Officer (CNO), Exelon Nuclear) that contain sensitive, proprietary, or other types of items that are not transmitted via the normal electronic distribution process, be sent to the appropriate Director of Licensing and Regulatory Affairs as found in Table 1 below.
U.S. Nuclear Regulatory Commission April 20, 2017 Page 3 Table 1: Address for Director of Licensing and Regulatory Affairs for each EGC Nuclear Site Nuclear Site Director of Licensinq and Requlatorv Affairs Braidwood Station, Units 1 and 2 Byron Station, Units 1 and 2 Clinton Power Station, Unit 1 Director, Licensing and Regulatory Affairs Dresden Nuclear Power Station, Exelon Generation Company, LLC Units 1, 2, and 3 4300 Winfield Road Warrenville, IL 60555 LaSalle County Station, Units 1 and 2 Quad Cities Nuclear Power Station, Units 1 and 2 Limerick Generating Station, Units 1 and 2 Oyster Creek Nuclear Generating Station Peach Bottom Atomic Power Station, Units 1, 2, and 3 Director, Licensing and Regulatory Affairs Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA-3E Calvert Cliffs Nuclear Power Plant, Units 1 Kennett Square, PA 19348 and 2 R.E. Ginna Nuclear Power Plant Nine Mile Point Nuclear Station, Units 1 and 2 James A. FitzPatrick Nuclear Power Plant Please ensure that these changes are forwarded to the appropriate NRC Regional offices as well.
There are no new regulatory commitments contained in this letter. If there are any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.
Respectfully, James Barstow Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Correspondence Addressee and Service List Update
U.S. Nuclear Regulatory Commission April 20, 2017 Page4 cc: NRG Region I, Regional Administrator NRG Region Ill, Regional Administrator NRG Project Manager - Braidwood Station NRG Project Manager - Byron Station NRG Project Manager - Clinton Power Station NRG Project Manager - Dresden Nuclear Power Station, Unit 1 NRG Project Manager - Dresden Nuclear Power Station, Units 2 and 3 NRG Project Manager - James A. FitzPatrick Nuclear Power Plant NRG Project Manager - LaSalle County Station NRG Project Manager - Limerick Generating Station NRG Project Manager - Oyster Creek Nuclear Generating Station NRG Project Manager - Peach Bottom Atomic Power Station, Unit 1 NRG Project Manager - Peach Bottom Atomic Power Station, Units 2 and 3 NRG Project Manager - Quad Cities Nuclear Power Station NRG Project Manager - Three Mile Island Nuclear Station, Unit 1 NRG Project Manager - Calvert Cliffs Nuclear Power Plant NRG Project Manager - R.E. Ginna Nuclear Power Plant NRG Project Manager - Nine Mile Point Nuclear Station
Attachment Correspondence Addressee and Service List Update Page 1of4 Exelon Generation Company, LLC Corporate Offices Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Brvan.Hanson@exeloncorp.com Mr. Christopher H. Mudrick Chief Operating Officer (COO), Constellation Exelon Nuclear Group Senior Vice President, Northeast Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Christopher.Mudrick@exeloncorp.com Senior Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Senior Vice President, West Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Engineering and Technical Services, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Operations Support, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Regulatory Affairs, Nuclear, and General Counsel, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Attachment Correspondence Addressee and Service List Update Page 2 of 4 Exelon Generation Company. LLC Corporate Offices (continued)
Vice President, Nuclear Oversight, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Licensing and Regulatory Affairs, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Operations Support, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel, Exelon Generation Company, LLC 200 Exelon Way, Suite 305 Kennett Square, PA 19348
Attachment Correspondence Addressee and Service List Update Page 3 of 4 James A. FitzPatrick Nuclear Power Plant Site Vice President - James A. FitzPatrick Nuclear Power Plant Exelon Generation Company, LLC P.O. Box 110 Lycoming, NY 13093 Plant Manager - James A. FitzPatrick Nuclear Power Plant Exelon Generation Company, LLC P.O.Box110 Lycoming, NY 13093 Manager - Regulatory Assurance - James A. FitzPatrick Nuclear Power Plant Exelon Generation Company, LLC P.O. Box 110 Lycoming, NY 13093 Senior Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Senior Vice President, Operations Support, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Operations Support, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Licensing and Regulatory Affairs, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director, Licensing and Regulatory Affairs, Exelon Generation Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348 Manager - Licensing - Calvert Cliffs, Ginna, and Nine Mile Point 200 Exelon Way, KSA-3E Kennett Square, PA 19348 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348
Attachment Correspondence Addressee and Service List Update Page 4 of 4 James A. FitzPatrick Nuclear Power Plant (continued)
Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way, Suite 305 Kennett Square, PA 19348 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA-N1 Kennett Square, PA 19348