RS-12-164 November 27, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Exelon Generation Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
References:
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012
- 2. NRC Letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, Guidelines For Performing Verification Walkdowns of Plant Flood Protection Features, dated May 31, 2012
- 3. Exelon Generation Company, LLCs 90-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1 and 2.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (Flooding), dated June 11, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees. Enclosure 4 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Flooding. On June 11, 2012, Exelon Generation Company, LLC (EGC) submitted the 90-day response requested in Enclosure 4 of Reference 1, confirming that EGC would use the NRC-endorsed flooding walkdown procedure (Reference 3).
u.s.
U.S.Nuclear Nuclear Regulatory Regulatory Commission Commission 180-DayResponse 180-Day Responseto to50.54(f) 50.54(f) Letter Letter NTTF Recommen dation NTTF Recommendation 2.3: Flooding 2.3: Flooding November 27,2012 November 27, 2012 Page 22 Page Forflooding For floodingRecommendation Recommendation2.3 2.3 (walkdownsh (walkdowns),EnclosureEnclosure 44 of ofReference Reference 1 states that within states that within 180 days of the NRC's endorsemen 180 days of the NRC's endorsement of the t of the walkdown walkdownprocess process (Reference (Reference2),2),each each addressee addressee willsubmit will submitaafinal finalresponse, response,including includingaalist listofofany anyareas areasthat thatare areunable unabletotobe be inspected inspected due to due to inaccessibilityand inaccessibility and aa schedule schedule for when when the walkdown walkdown will willbebecompleted.
completed. This letter provides the LaSalle County LaSalle County Station, Station, Units Units 11andand 22 180-day response response to to Reference Reference11for forFlooding Flooding Recommendation 2.3.
Recommendation Conditions identified Conditions identified during during the the walkdowns walkdowns were were documented documented and enteredentered into the corrective action program.
action program.
Enclosure 1 to this letter provides Enclosure provides the requested requested information information for LaSalle Station Units 1 and and 2.
This letter This letter contains contains new regulatory regulatory commitmen commitments, ts, which which are are identified identified in in Enclosure Enclosure 2.2.
Should you Should you have have any any questions questions concerning concerning the the content content of of this letter, letter, please please contact contactRon Ron Gaston Gaston at (630) at (630) 657-3359.
657-3359.
II declare declare under under penalty of of perjury perjurythatthatthetheforegoing foregoingisistrue trueand and correct.
correct. Executed on thethe 27th 27th day of November day of November 2012.
Respectfully, Respectfully,
~9i7./¥ Glen T. Kaegi Director Director -- Licensing licenSing && Regulatory RegulatoryAffairs Affairs Exelon Generation Exelon Generation Company, LLC LLC
Enclosures:
Enclosures:
1.
- 1. Flooding Flooding Walkdown Walkdown ReportReport In In Response Response To To The The 50.54(f) 50.54(f) Information Information Request RequestRegarding Regarding Near-Term Near-Term Task Force Force Recommend Recommendation ation 2.3:2.3:Flooding Floodingfor for the the LaSalle LaSalleCounty CountyStation, Station,Units Units 11 and and 22
- 2. Summary
- 2. Summary of of Regulatory RegulatoryCommitmen Commitments ts cc:
cc: Director, Director, Office Office ofofNuclear NuclearReactor ReactorRegulation Regulation Regional Regional Administrato Administrator r --NRC NRCRegion RegionIIIIII NRC NRC Senior Senior Resident Resident Inspector Inspector -- LaSalle LaSalleUnits Units 11and and22 NRC Project Manager, NRR - LaSalle NRC Project Manager, NRR - LaSalle Units11and Units and22 Illinois Illinois Emergency Emergency Managemen Management t Agency Agency- -Division Divisionof of Nuclear NuclearSafety Safety
U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Flooding November 27, 2012 Page 3 Enclosure 1 Flooding Walkdown Report In Response To The 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the LaSalle County Station, Units 1 and 2 (47 pages)
FLOODING WALKDOWN REPORT IN RESPONSE TO THE 50.54(f ) INFORMATION REQUEST REGARDING NEARTERM TASK FORCE RECOMMENDATION 2.3: FLOODING for the LASALLE COUNTY NUCLEAR POWER STATION 2601 North 21st Road, Marseilles, IL 61341 Facility Operating License Nos. NPF11 (Unit 1) and NPF18 (Unit 2)
NRC Docket Nos. STN 50373 (Unit 1) and 50374 (Unit 2)
Exelon Generation Company, LLC 300 Exelon Way, Kennett Square, PA 19348 Prepared by:
AMEC Environment and Infrastructure 502 West Germantown Pike, Suite 850, Plymouth Meeting, PA 19462 November 6, 2012
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Contents Contents ............................................................................................................................................................................. 2
- 1. EXECUTIVE
SUMMARY
............................................................................................................................................... 3
- 2. PURPOSE .................................................................................................................................................................... 4
- a. Background........................................................................................................................................................... 4
- b. Site Description .................................................................................................................................................... 5
- c. Requested Actions................................................................................................................................................ 7
- d. Requested Information ........................................................................................................................................ 7
- 3. METHODOLOGY ......................................................................................................................................................... 8
- a. Overview of NEI 1207 (Walkdown Guidance) ..................................................................................................... 8
- b. Application of NEI 1207....................................................................................................................................... 9
- c. Reasonable Simulations ..................................................................................................................................... 11
- d. Walkdown Inspection Guidance......................................................................................................................... 11
- 4. RESULTS ................................................................................................................................................................... 11
- a. Requested Information Item 2(a) - Design Basis Flood Hazards ....................................................................... 12 PMF on the Illinois River .......................................................................................................................................... 12 PMP Event on the Cooling Lake with Wave RunUp................................................................................................ 12 Local Intense Precipitation (LIP) Analysis................................................................................................................. 13 Other Flooding Mechanisms.................................................................................................................................... 13 PMF Conclusion ....................................................................................................................................................... 14
- b. Requested Information Item 2(b) - CLB Protection and Mitigation Features ................................................... 14
- c. Requested Information Item 2(c) - Flood Warning Systems ............................................................................. 15
- d. Requested Information Item 2(d) - Flood Protection System/Barrier Effectiveness......................................... 15 Additional Protection Measures .............................................................................................................................. 20
- e. Requested Information Item 2(e) - Implementation of Walkdown Process ..................................................... 20
- f. Requested Information Item 2(f) - Findings and Corrective Actions Taken/Planned........................................ 22 Observations Designated through CAP as Deficient and Corrective Actions Planned............................................. 22 Other Items Awaiting Final Disposition in CAP ........................................................................................................ 24 Restricted Access Areas ........................................................................................................................................... 24 Inaccessible Areas.................................................................................................................................................... 24 Unanalyzed Conditions ............................................................................................................................................ 26
- g. Requested Information Item 2(g) - Cliff -Edge Effects and Available Physical Margin ..................................... 26
- h. Requested Information Item 2(h) - Planned/NewlyInstalled Flood Protection Enhancements....................... 26
- 5. CONCLUSIONS.......................................................................................................................................................... 27
- 6. REFERENCES............................................................................................................................................................. 46 Page 2 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- 1. EXECUTIVE
SUMMARY
In response to the nuclear fuel damage at the FukushimaDaiichi power plant due to the March 11, 2011 earthquake and subsequent tsunami, the United States Nuclear Regulatory Commission (NRC) established the Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations, and to make recommendations to the Commission for its policy direction. The NTTF reported a set of recommendations that were intended to clarify and strengthen the regulatory framework for protection against natural phenomena.
On March 12, 2012, the NRC issued an information request pursuant to Title 10 of the Code of Federal Regulations, Section 50.54 (f) (10 CFR 50.54(f) or 50.54(f)) (Reference 3) which included Enclosure 4 of Reference 3. The NRC requested that licensees perform flood protection walkdowns to identify and address plantspecific degraded, nonconforming, or unanalyzed conditions and cliffedge effects (through the corrective action program) and verify the adequacy of monitoring and maintenance procedures.
This report provides the information requested in the March 12, 50.54(f) letter for LaSalle County Station (LSCS); specifically, the information listed under the Requested Information section of Enclosure 4, paragraph 2 (a through h).
LSCS site is located in the southeastern part of LaSalle County in north central Illinois, 6 miles southeast of Marseilles, Illinois, 3 miles west of State Highway 170, and 0.5 mile north of the Grand RidgeMazon Road (LaSalle County Highway 6). The Illinois River is located approximately 5 miles north of the site. The probable maximum flood (PMF) at LaSalle is based on a 24hour local intense precipitation (LIP) event directly on the site. The maximum flood elevations due to an LIP event at the site are 710.41 feet and 710.48 mean sealevel (MSL), based on location at the plant site.
LSCS current licensing basis reports, calculations and drawings were obtained through LSCS personnel and Exelons Electronic Document Management System (EDMS). Those documents were compiled and reviewed to understand the flooding related current licensing basis (CLB), general plant layout and functionality, and to develop a list of flood protection features to be evaluated during the walkdown.
Flooding walkdowns were performed between August 10 and September 14, 2012, based on guidance provided in Nuclear Energy Institute (NEI) document NEI 1207 [Rev. 0A] (Reference 2). Observations captured during the walkdowns were documented on paper copies of the Walkdown Record Form provided in Appendix B of NEI 1207 (Rev 0A). Pictures were taken of each flood protection feature and associated deficiency, if applicable. Select features were surveyed to assess Available Physical Margin (APM).
One hundred eightyfive (185) features were included on the walkdown list. All of these features were considered incorporated passive. Thirty (30) features could not be immediately judged as acceptable during the flooding walkdown. Thirtythree (33) features were in areas considered to be restricted access and were deferred to outage or when the areas would be opened. Eight (8) features were considered inaccessible.
Five (5) deficiencies were identified during the walkdown. Note that three (3) of these deficiencies were for features not on the walkdown list, because they were originally surveyed for Available Physical Margin (APM) only. Two (2) penetration seals were observed to be in a condition that could not be immediately judged as acceptable and the Corrective Action Program (CAP) process determined they were deficiencies.
Three (3) exterior doors had thresholds that were identified as being lower than the calculated flood elevation. These three door thresholds were considered deficient in the CAP process. No conditions were found that challenged plant safety or operability.
Page 3 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- 2. PURPOSE
- a. Background In response to the nuclear fuel damage at the FukushimaDaiichi power plant due to the March 11, 2011 earthquake and subsequent tsunami, the United States Nuclear Regulatory Commission (NRC) established the Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations, and to make recommendations to the Commission for its policy direction. The NTTF reported a set of recommendations that were intended to clarify and strengthen the regulatory framework for protection against natural phenomena.
On March 12, 2012, the NRC issued an information request pursuant to Title 10 of the Code of Federal Regulations, Section 50.54 (f) (10 CFR 50.54(f) or 50.54(f)) (Reference 3) which included six (6) enclosures:
[NTTF] Recommendation 2.1: Seismic
[NTTF] Recommendation 2.1: Flooding
[NTTF] Recommendation 2.3: Seismic
[NTTF] Recommendation 2.3: Flooding
[NTTF] Recommendation 9.3: EP Licensees and Holders of Construction Permits In Enclosure 4 of Reference 3, the NRC requested that licensees perform flood protection walkdowns to identify and address plantspecific degraded, nonconforming, or unanalyzed conditions and cliffedge effects (through the corrective action program) and verify the adequacy of monitoring and maintenance procedures. (See note below regarding cliffedge effects.)
Structures, systems, and components (SSCs) important to safety are designed either in accordance with, or meet the intent of, Appendix A to 10 CFR Part 50, General Design Criteria (GDC) 2. GDC 2 states that SSCs important to safety at nuclear power plants must be designed to withstand the effects of natural phenomena, including floods, without loss of capability to perform their intended safety functions. For flooding walkdowns, identifying/addressing plantspecific degraded, nonconforming, or unanalyzed conditions (through the corrective action program) and verifying the adequacy of monitoring and maintenance procedures is associated with flood protection and mitigation features credited in the current design/licensing basis. New flood hazard information will be considered in response to Enclosure 2 of Reference 3.
On behalf of Exelon Generation Company, LLC (Exelon), this report provides the information requested in the March 12, 50.54(f) letter; specifically, the information listed under the Requested Information section of Enclosure 4, paragraph 2 (a through h). The Requested Information section of Enclosure 4, paragraph 1 (a through j), regarding flooding walkdown procedures, was addressed via Exelons June 11, 2012, acceptance (Reference 1) of the industry walkdown guidance (Reference 2).
Note Regarding CliffEdge Effects Cliffedge effects were defined by the NTTF Report (Reference 5), which noted that the safety consequences of a flooding event may increase sharply with a small increase in the flooding level. While Page 4 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
the NRC used the same term as the NTTF Report in the March 12 50.54(f) information request (Reference 3), the information the NRC expects utilities to obtain during the Recommendation 2.3: Flooding Walkdowns is different. To clarify, the NRC is now differentiating between cliffedge effects (which are dealt with under Enclosure 2 of Reference 3) and a new term, Available Physical Margin (APM). APM information will be collected during the walkdowns, but will not be reported in the response to Enclosure 4 of Reference 3. The collected APM information will be available for use in developing the response to of Reference 3.
- b. Site Description LSCS is located in the southeastern part of LaSalle County in north central Illinois, 6 miles southeast of Marseilles, Illinois, 3 miles west of State Highway 170, and 0.5 mile north of the Grand RidgeMazon Road (LaSalle County Highway 6). The Illinois River is located approximately 5 miles north of the site.
The LSCS site is located in the Illinois River basin, which is drained by the main stem of the Illinois River and its tributaries, including the canal system in the Chicago area. The Illinois River is the largest tributary of the Mississippi River above the mouth of the Missouri River. It flows in a westerly, southwesterly, and southerly direction a distance of 273 miles to its confluence with the Mississippi River.
The natural drainage area of the Illinois River is 28,200 square miles, including 1,000 square miles in Wisconsin and 3,200 square miles in Indiana. Diversions from the Lake Michigan watershed by reversal of the flow of the Chicago and Calumet Rivers increase the natural drainage area of the Illinois River from 28,200 square miles to 29,010 square miles. The drainage area of the Illinois River near the LSCS site is 7,640 square miles.
Page 5 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
The LSCS site geology is divided into a large southern gently rolling upland portion containing the plant buildings and cooling lake and a small portion to the north, in the Illinois River valley, containing the intake works. The maximum topographic relief between the two parts is about 250 feet.
The LSCS site occupies approximately 3,060 acres, of which 2,058 acres comprise the cooling lake. The terrain around the plant site is gently rolling, with ground surface elevations varying from 700 feet to 724 feet MSL. Natural drainage at the station site is generally toward the cooling lake.
The LSCS site is a two unit site. Construction began in 1973 for Unit 1 and in 1972 for Unit 2. Units 1 and 2 were licensed for commercial operation in 1982 and 1984, respectively. The plant grade and floor elevations are 710.00 feet and 710.50 feet MSL respectively.
Per the CLB documentation, three main flooding mechanisms were considered at LSCS: A PMF with wave runup on the Illinois River, a probable maximum precipitation (PMP) event on the cooling lake with wave runup, and LIP directly on the site.
The PMF elevation of the Illinois River plus 40mph overland wind generated wave runup is 522.5 feet MSL, 188 feet below the plant grade elevation.
The PMF elevation on the cooling pond including 40mph overland wind generated wind wave runup is 705.6 feet MSL, 4.9 feet below plant grade elevation.
Page 6 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
The PMF maximum flood elevation due to LIP listed in the Updated Final Safety Analysis Report (UFSAR) is 710.41 feet MSL. A PMF flood elevation due to LIP of 710.48 feet MSL was computed in the northeast portion of Zone I in Design Calculation S66, but that elevation has not been incorporated into the UFSAR.
This issue was captured in an issue report in the Corrective Action Program as described later in this report in the Results section, subsection f. Therefore, the maximum flood elevation of 710.48 feet MSL computed in Calculation S66 was used for three features in the northeast portion of the plant. The flooding elevation of 710.41 feet MSL documented in the UFSAR was used to evaluate the remainder of the features.
The CLB documentation states that since there are no large bodies of water in the immediate vicinity of the site, storm surges, seiches, and tsunami floods are not relevant. Failure of upstream dams on the Illinois River or its tributaries is also not relevant, since these are low dams for navigation and hydropower generation, and their failure would not exceed the severity of the PMF on the Illinois River. Failure of the cooling lake dikes would not cause flooding of the plant due to the natural topography around the site.
- c. Requested Actions Per Enclosure 4 of Reference 3, the NRC requests that each licensee confirm use of the industrydeveloped, NRCendorsed, flood walkdown procedures or provide a description of plantspecific walkdown procedures.
In a letter dated June 11, 2012 (Reference 1), Exelon confirmed that the flooding walkdown procedure (Reference 2), endorsed by the NRC on May 31, 2012, will be used as the basis for the flooding walkdowns.
Other NRC requested actions include:
(1) Perform flood protection walkdowns using an NRCendorsed walkdown methodology; (2) Identify and address plantspecific degraded, nonconforming, or unanalyzed conditions, as well as cliffedge effects through the corrective action program, and consider these findings in the Recommendation 2.1 hazard evaluations, as appropriate; (3) Identify any other actions taken or planned to further enhance the site flood protection; (4) Verify the adequacy of programs, monitoring and maintenance for protection features; and (5) Report to the NRC the results of the walkdowns and corrective actions taken or planned. of Reference 3 also states, If any condition identified during the walkdown activities represents a degraded, nonconforming, or unanalyzed condition (i.e. noncompliance with the current licensing basis) for an SSC, describe actions that were taken or are planned to address the condition using the guidance in Reference 6, including entering the condition in the corrective action program. Reporting requirements pursuant to 10 CFR 50.72 should also be considered.
- d. Requested Information Per Enclosure 4 of Reference 3,
- 1. The NRC requests that each licensee confirm that it will use the industrydeveloped, NRC endorsed, flooding walkdown procedures or provide a description of plantspecific walkdown procedures. As indicated previously, Exelons letter dated June 11, 2012 (Reference 1), confirmed that the flooding walkdown procedure (Reference 2), endorsed by the NRC on May 31, 2012, will be used as the basis for the flooding walkdowns.
Page 7 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- 2. The NRC requests that each licensee conduct the walkdown and submit a final report which includes the following:
- a. Describe the design basis flood hazard level(s) for all floodcausing mechanisms, including groundwater ingress.
- b. Describe protection and mitigation features that are considered in the licensing basis evaluation to protect against external ingress of water into SSCs important to safety.
- c. Describe any warning systems to detect the presence of water in rooms important to safety.
- d. Discuss the effectiveness of flood protection systems and exterior, incorporated, and temporary flood barriers. Discuss how these systems and barriers were evaluated using the acceptance criteria developed as part of Requested Information item 1.h.
- e. Present information related to the implementation of the walkdown process (e.g., details of selection of the walkdown team and procedures,) using the documentation template discussed in Requested Information item 1.j, including actions taken in response to the peer review.
- f. Results of the walkdown including key findings and identified degraded, nonconforming, or unanalyzed conditions. Include a detailed description of the actions taken or planned to address these conditions using the guidance in Regulatory Issues Summary 200520, Revision 1, Revision to NRC Inspection Manual Part 9900 Technical Guidance, "Operability Conditions Adverse to Quality or Safety," including entering the condition in the corrective action program.
- g. Document any cliffedge effects identified and the associated basis. Indicate those that were entered into the corrective action program. Also include a detailed description of the actions taken or planned to address these effects. See note in Section 12 regarding the NRCs change in position on cliffedge effects.
- h. Describe any other planned or newly installed flood protection systems or flood mitigation measures including flood barriers that further enhance the flood protection. Identify results and any subsequent actions taken in response to the peer review.
- 3. METHODOLOGY
- a. Overview of NEI 1207 (Walkdown Guidance)
In a collaborative effort with NRC staff, NEI developed and issued report 1207 [Rev 0A], Guidelines for Performing Verification Walkdowns of Plant Protection Features, dated May 2012 (Reference 2). The NRC endorsed NEI 1207 on May 31, 2012 with amendments. NEI 1207 was updated to incorporate the amendments and reissued on June 18, 2012. On June 11, 2012, Exelon issued a letter to the NRC (Reference 1) stating that the endorsed flooding walkdown procedure (Reference 2) will be used as the basis for the flooding walkdowns. NEI 1207 provides guidance on the following items:
Definitions o Incorporated Barrier/Feature o Temporary Barrier/Feature o Exterior Barrier/Feature o Current Licensing Basis (CLB)
Page 8 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
o Design Bases o Inaccessible o Restricted Access o Deficiency o Flood Protection Features o Reasonable Simulation o Visual Inspection o CliffEdge Effects o Available Physical Margin o Variety Of Site Conditions o Flood Duration Scope o Basis for Establishing Walkdown Scope o Identify Flood Protection Features (Walkdown List)
Methodology o Develop Walkdown Scope o Prepare Walkdown Packages o Walkdown Team Selection and Training o Perform PreJob Briefs o Inspection of Flood Protection And Mitigation Features General Incorporated or Exterior Passive Flood Protection Features Incorporated or Exterior Active Flood Protection Features Temporary Passive Flood Protection Features Temporary Active Flood Protection Features Procedure Walkthrough and Reasonable Simulation o Review of The Maintenance and Monitoring of Flood Protection Features o Review of Operating Procedures o Documentation of Available Physical Margins o Documenting Possible Deficiencies o Restricted Access, or Inaccessible Acceptance Criteria Evaluation and Reporting Results of The Walkdown Related Information Sources Examples Walkdown Record Form Sample Training Content Walkdown Report
- b. Application of NEI 1207 Exelons approach to the flooding walkdowns included three phases:
Phase 1 - Preparation, Training, Data Gathering, and Scoping Page 9 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Phase 2 - Inspections Phase 3 - Final Reporting The purpose of Phase 1 was to obtain a clear understanding of the sites flood mitigation strategy; develop scope, methodology, and acceptance criteria for the walkdowns; and logistical planning. The following activities were performed during Phase 1:
Data gathering (CLB documents and plant drawings);
Site visit to preview features and plant conditions; Desktop review of CLB documents to identify and describe the CLB flood hazard; Desktop review of CLB documents to identify and describe flood protection/mitigation strategy; Development of Walkdown List; Development of Walkdown methodology and acceptance criteria; Logistics and strategy planning; and Preparation of Walkdown Packages.
The purpose of Phase 2 was to execute the Flooding Walkdown for LSCS, which included:
Visual inspection; Collect APM survey data; and Documentation of observations.
The Flooding Walkdown activities for LSCS involved visual inspections of the following feature types:
- 1. Site drainage plan/flow paths
- 2. Exterior walls below grade
- 3. Exterior wall penetration seals below grade
- 4. Roofs
- 5. Basement Floor Slabs
- 6. Ground floor exterior access doors, openings, and removable wall panel thresholds - APM survey only All visual inspections of features were recorded in the field to document condition assessments. For each observation, the feature location, photographs with descriptions, and general observations were recorded.
The field data was uploaded to a database. The database was used to generate the Walkdown Record Form for each feature/procedure. The Walkdown Record Form provided in NEI 1207 (Rev. 0A), Appendix B was used to document the collected field data and results of the Flooding Walkdown for both the field data collection and the final form in support of this report.
In addition, ground floor access door thresholds, removable wall panels, and the radioactive waste loading dock were surveyed to determine their finish floor elevations. This information was also used for the APM analysis.
This Walkdown Report was developed to document the methodology and findings of the Flooding Walkdowns. The Walkdown Report was prepared in accordance with the template provided in NEI 1207 (Rev. 0A), Appendix D.
Page 10 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- c. Reasonable Simulations Flood mitigation procedures are not relied upon for flood protection at LSCS; therefore, reasonable simulations are not part of this flooding walkdown.
- d. Walkdown Inspection Guidance A Walkdown Inspection Guidance was developed by Exelon to supplement NEI 1207 (Reference 2), based largely on Appendix A of NEI 1207 (Examples). The guidance was intended to supplement, not supersede, NEI 1207 and provide inspection guidance for specific features, listed below.
Incorporated or Exterior Passive Features:
o Site Elevations and Topography o Earthen Features (i.e., Flood Protection Berm, Dike, Levee) o Concrete and Steel Structures o Wall, Ceiling, and Floor Seals (e.g. Penetration Seals, Cork Seals) o Passive Flood Barriers or Water Diversion Structures o Drains and Catch Basins o Plugs and Manhole Covers o Drainage Pathways (Swales, Subsurface Drainage System, etc.)
o Piping and Cable Vaults and Tunnels, Electrical Cable Conduit o Floor Hatches o Flap Gate/Backwater Valve/Duckbill Valve o Flood Wall Incorporated or Exterior Active Features:
o Credited Water Tight Doors o Credited NonWatertight Doors o Pumps o Water Level Indication o Gate Valves Temporary Passive Features:
o Portable Flood Barriers and Inflatable Rubber Seals o Flood Gate Temporary Active Feature o Pumps
- 4. RESULTS The information requested in Reference 3, Enclosure 4, under paragraph 2 of the Requested Information section, is provided below. The contents of each item were developed in accordance with Reference 2, Appendix D.
Page 11 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- a. Requested Information Item 2(a) - Design Basis Flood Hazards Describe the design basis flood hazard level(s) for all floodcausing mechanisms, including groundwater ingress.
Three main flooding mechanisms were considered in the LSCS UFSAR Revision 19: A probable maximum flood (PMF) plus 40mph overland wind generated wave runup on the Illinois River, a probable maximum precipitation (PMP) event on the cooling lake with wave runup, and an LIP rainfall event directly on the site.
PMF on the Illinois River The station is "floodproof" or "dry" with regard to a postulated PMF in the Illinois River, since the plant floor (elevation 710.50 feet MSL) is 188 feet higher than the PMF plus wave runup (elevation of 522.5 feet MSL), which includes the maximum (1%) wave characteristics of sustained 40mph overland winds on the probable maximum water level.
The U.S. Army Corps of Engineers (USACE) extrapolated a PMF discharge of 316,000 cubic feet per second (cfs) at LSCS corresponding to a drainage area of 7,640 square miles from PMF discharges computed at gaging stations at Meredosia, Beardstown, and Peoria, Illinois along the Illinois River. Allowing for the effect of urbanization, a conservative maximum discharge of 350,000 cfs was used for the PMF analysis.
The PMF discharge was routed through crosssection geometry developed from topographic data and soundings of the lllinois River channel obtained by the USACE. Using the slopearea method, a PMF Stillwater elevation in the Illinois River in the vicinity of LSCS was estimated to be 521.8 feet MSL. Wind wave characteristics corresponding to 40 miles per hour overland winds were investigated yielding a height of maximum wave runup of 0.7 feet. Adding this value to the PMF Stillwater level of 521.8 feet MSL yielded a probable maximum wave runup elevation of 522.5 feet MSL, which is 188 feet below the plant floor elevation of 710.50 feet MSL. A postulated PMF on the Illinois River, therefore, does not affect any safety related facility.
PMP Event on the Cooling Lake with Wave RunUp A PMF with antecedent standard project flood (SPF) was routed through the lake using the U.S. Army Hydrologic Engineering Center's computer program 22J2L210, "Spillway Rating and Flood Routing", 1966.
Inputs to the program consist of the elevation capacity data derived from topographic maps of the area.
The initial water level used for routing is the normal lake level of 700.0 feet MSL. The program calculated the outflow from the lake for the auxiliary spillway, which has a crest elevation of 702.5 feet MSL and for the service spillway, which has a crest elevation of 697.75 feet MSL. The service spillway directs lake water into the blowdown line to the Illinois River. The maximum lake level corresponding to the SPF is 701.6 feet MSL, which is lower than the auxiliary spillway crest elevation.
When the SPF is followed by the PMF, with three rainless days between the standard project storm (SPS) and the PMP, the lake level varies from a maximum of 701.6 feet MSL during SPF to 701.0 feet MSL before the rise due to PMF, and to a maximum stillwater elevation of 704.3 feet MSL during PMF.
Maximum wave runup associated with 40mph overland winds coincident with the PMF at the plant site is computed to be 1.3 feet. The wave runup elevation obtained by adding the wave runup to the probable maximum water level is 705.6 feet MSL. Since the plant grade and floor elevations are 710.00 feet and Page 12 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
710.50 feet MSL respectively, there is no flooding at the plant due to 40mph overland winds coincident with the probable maximum water level in the lake.
Local Intense Precipitation (LIP) Analysis The 24hour PMP at the site is 32.1 inches. To route the runoff from the rainfall over the plant area, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> PMP is divided into smaller time intervals. For example, 14.8 inches of precipitation is postulated to fall in the first hour of the storm. Conservatively, infiltration losses were considered negligible, the site drainage system was assumed not functioning, and the precipitation falling on different portions of the site area was assumed to reach the peripheral roads simultaneously. The rational formula was used to estimate peak runoff.
The plant area was divided into two zones, Zone I and Zone II. The maximum runoff from each of the zones was routed over the peripheral roads and railroads to obtain the maximum water surface elevation upstream of the peripheral roads and railroads. Culverts running under these roads and railroads were assumed to be fully blocked.
The peak runoff for Zone I was calculated to be 1,065 cfs. The backwater calculations beginning from the peripheral roads and railroads yielded a water surface elevation of 710.18 feet MSL upstream of the north south access road and a maximum water surface elevation of 710.37 feet MSL near the east side of the plant building in Zone I.
For Zone II, a stepbackwater analysis was performed using the U.S. Corps of Engineers Hydrologic Engineering Centers River Analysis System (HECRAS) computer program. The peak discharge at Track No. 1 is 692.5 cfs. Based on the UFSAR, the backwater model results in a water surface elevation of 710.16 feet MSL at Track No. 1 and less than 710.41 feet MSL adjacent to the east side of the plant.
The UFSAR reports the PMP maximum flood elevation of 710.41 feet MSL. That flood elevation was used for all but three features. A PMF flood elevation of 710.48 feet MSL was computed in the northeast portion of Zone I in Design Calculation S66, but that elevation has not been incorporated into the UFSAR. This issue is discussed later in this report in the Results section, subsection f. Three features (exterior access doors D 164, D20 and D508) are in the vicinity of where 710.48 feet MSL was computed, and are the only features that are materially affected by the discrepancy. Therefore, elevation 710.48 feet MSL was used as the flood elevation to evaluate those doors.
Other Flooding Mechanisms The CLB documentation states that since there are no large bodies of water in the immediate vicinity of the site, storm surges, seiches, and tsunami floods are not relevant. Failure of upstream dams on the Illinois River or its tributaries is also not relevant, since these are low dams for navigation and hydropower generation, and their failure would not exceed the severity of the PMF on the Illinois River. Failure of the cooling lake dikes would not cause flooding of the plant due to the natural topography around the site.
Section 2.4.13.5 of the LSCS UFSAR states that the groundwater level assumed for calculation of hydrostatic loading on the power plant foundations is elevation 700.00 feet MSL, which is equivalent to the design cooling lake level. The design groundwater level is based on the assumption that granular fill around the plant foundations will be hydraulically connected with the cooling lake through the granular fill around the intake pipelines. The groundwater level in the granular fill around the plant foundations would reflect the cooling lake level.
Page 13 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
The UFSAR states that the granular fill around the plant foundations is covered with 20 feet of essentially impermeable, compacted clay. In addition, the surrounding clayey till is also essentially impermeable. Due to the compacted clay cover and clayey till, it is expected that infiltration of precipitation and groundwater seepage would likely be minimal.
PMF Conclusion For the flooding walkdowns, the critical CLB hazard considered was the LIP. The maximum flood elevation of 710.48 feet MSL computed in Calculation S66 was used for three features in the northeast portion of the plant. The flooding elevation of 710.41 feet MSL documented in the UFSAR was used to evaluate the remainder of the features.
- b. Requested Information Item 2(b) - CLB Protection and Mitigation Features Describe protection and mitigation features that are considered in the licensing basis evaluation to protect against external ingress of water into SSCs important to safety.
The flood protection features credited in the CLB for LSCS are considered incorporated passive. The features are located in the Auxiliary, Diesel Generator, Reactor, Turbine, Offgas, Lake Screen House and Radioactive Waste Buildings. The features include:
- 1. Site drainage plan/flow paths
- 2. Exterior walls below grade Exterior walls to grade level are sealed with a waterproof membrane.
Exterior construction joints are sealed with waterstops to grade level
- 3. Exterior wall penetration seals below grade
- 4. Roofs
- 5. Basement Floor Slabs
- 6. Ground floor exterior access doors, openings, and removable wall panel thresholds - Performed survey for APM analysis only The PMF flood elevation is based on a 24hour rain event; however the CLB does not identify flood duration. Therefore, the duration of the flooding was not considered for this evaluation.
Exterior walls and penetration seals are designed to protect against groundwater ingress. DBDLSM11 Rev B states that external walls below grade elevation are required to be covered with a waterproof membrane.
In addition, all exterior construction joints are sealed with waterstops to grade level and pipe penetrations in exterior walls are required to have watertight penetration sleeves. The CLB does not specifically credit floor slabs for providing protection from groundwater ingress, although they are designed to resist full hydrostatic uplift pressures.
The Lake Screen House is affected by static and dynamic consequences of wave activity. The walls of the Lake Screen House are designed to withstand hydrodynamic forces caused by wind wave runup superimposed on hydrostatic forces. The Lake Screen House walls were included in the walkdown list.
The flooding CLB does not specify plant configurations during certain modes of operation. Therefore, all modes of operation were considered during the walkdown.
Page 14 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Flood mitigation procedures are not relied upon for flood protection at LSCS, and there are no warning systems for weather conditions or flood levels present at the plant.
During an LIP, shallow flooding due to sheet flow could occur north and west of the plant buildings. Surface conditions could become soft (i.e. muddy) where ground cover is grass and soil. Both of these conditions could make moving equipment and foot traffic challenging. However, because procedures are not part of the LSCS CLB, and the flood protection strategy consists of incorporated passive features only, these adverse conditions have no impact on the performance of flood protection features.
- c. Requested Information Item 2(c) - Flood Warning Systems Describe any warning systems to detect the presence of water in rooms important to safety.
There are no systems in place credited with detecting the occurrence of or providing warning in the event of an external flood event. This is in agreement with the requirements of the current flooding licensing basis.
- d. Requested Information Item 2(d) - Flood Protection System/Barrier Effectiveness Discuss the effectiveness of flood protection systems and exterior, incorporated, and temporary flood barriers. Discuss how these systems and barriers were evaluated using the acceptance criteria developed as part of Requested Information Item 1.h [in Enclosure 4 of the March 12, 2012, 50.54(f) letter]
Section 6 of NEI 1207 defines acceptance as:
Flood protection features are considered acceptable if no conditions adverse to quality were identified during walkdowns, verification activities, or program reviews as determined by the licensees Corrective Action Program. Conditions adverse to quality are those that prevent the flood protection feature from performing its credited function during a design basis external flooding event and are deficiencies. Deficiencies must be reported to the NRC in the response to the 50.54(f) letter.
As indicated in Section 3d, inspection guidance was developed, supplementing NEI 1207, to provide more specific criteria for judging acceptance. All observations that could not be immediately judged as acceptable were entered into the sites Corrective Action Program (CAP) where a subsequent evaluation of the observation could be made.
The purpose of the Flooding Walkdowns was to determine if the plants credited external flood protection features conform to the LSCS CLB and meet the acceptance criteria outlined in Section 6 of NEI 1207 and the Supplemental Walkdown Inspection Guidance. The CLB credits plant exterior walls and wall penetration seals below grade for providing protection against external flooding ingress into the plant. Site topography and above ground drainage pathways are credited for providing drainage for the site. The CLB also credits roofs of Seismic Category I structures for supporting loads that equate to a maximum depth of 16 inches of water stored on the roof surface. Finally, the CLB credits the Lake Screen House exterior walls exposed to the lake for withstanding static and dynamic loads caused by wave runup from the cooling pond. In addition to the flood protection features discussed in the CLB, basement floor slabs were also walked down. The acceptance criteria for each of the flood protection feature types are as follows:
Page 15 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Site Elevations and Topography o Verify the current site topography (i.e. contours, slopes, and grades) appears to be consistent with the topography assumed in the CLB flood evaluation, based on field observations.
o Verify that the plant configuration with regard to impervious areas assumed in the CLB evaluation has not changed.
o Verify that the site drainage system configuration appears to be consistent with CLB evaluation.
o Verify that there are no added structures, security barriers, fences, etc., not shown on the design drawings used in the CLB flooding evaluation that could affect site drainage.
Drainage Pathways (Swales and Channels) o Verify the feature is in place and configured as designed.
o Visually inspect the material condition to determine if there is any damage that might prevent the feature from performing its flood protection function.
o Verify that the plant drainage swales are free of obstructions that could prevent the feature from performing the flood protection function and controls are in place to assure they remain free from obstruction.
Concrete Exterior Walls o Verify that the structure is in place and in accordance with its design configuration, per plant documents. The level of verification here would be to determine that there are no openings that are not shown on the drawings and the openings are of the same shape and location as shown on the design drawings. If a wall structure, perform physical measurement to confirm the required height. The minimum required height must be met with no allowance for dimensional tolerance.
o Visually inspect all exterior exposed surfaces below the analyzed maximum flood height for significant indications of structural degradation or any openings that might permit flooding of the interior spaces.
o Visible penetrations are sealed.
o Required relief paths are in place and unobstructed.
o No signs of water ingress on interior surfaces (e.g. calcification, staining, etc.).
o If conditions will not allow close examination, use of binoculars is permitted if 100% of the surface area below the maximum flood height can be inspected in a manner sufficient to meet the intent of this review; alternatively, a camera on a stick can be employed for evaluation.
o No apparent degradation in structural members that challenges their ability to withstand forces from flooding, i.e. reinforced concrete, concrete block or steel barriers, such as surface cracks greater than 0.04 inch in width.
Page 16 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
o Concrete structures should not show water stains/stalactites emanating from their surfaces.
o Surfaces of the structure/building that are buried are considered inaccessible and not subject to inspection. A visual inspection of interior surface is acceptable, if the exterior surface is inaccessible. In addition, the base of structures should be inspected for evidence of scouring or undermining that may have occurred during previous high water events.
o If a PM/surveillance exists that inspects the structure, then it is not necessary to specifically inspect individual barriers for this review (although the surface (e.g., wall), in accessible areas, must still be visually inspected for any unexpected conditions). If credit is being taken for a PM, then identify the PM number in the walkdown records. The PM should be reviewed for adequacy per NEI 1207.
Wall Penetration Seals o Perform a visual inspection of credited wall, ceiling, and floor penetration seals for indications of degradation that would allow external water ingress into the flood protected area. Conditions that should be recorded include (but are not limited to) damage, undocumented openings or holes (such as those due to abandoned equipment), etc.
o The credited side(s) (surface) of a seal must be inspected. For example, if the side of a wall penetration seal that is credited for flood protection is examined and found to be acceptable, the other side of the seal does not require examination.
o Visible penetrations are sealed and there are no visible gaps through wall holes.
o Penetration sleeves, link seals, piping, and conduit should have an absence of corrosion on the exposed steel surface.
o Conduit seal material should have an absence of water stains below the penetrations.
o Material should appear to be as indicated in plant documents and in generally good condition.
Piping and Cable Vaults and Tunnels, Electrical Cable Conduit o Water ingress into tunnels, vaults, and cable conduit is not a concern in the short term unless there are components in these structures with an active flood protection function that might be damaged by submergence.
o Provide reasonable assurance that these features will not become pathways for water (surface or groundwater) into SSCs protected from flooding. See NEI 1207 regarding the evaluation of features designated as inaccessible. Reasonable assurance that these features are not receiving and conveying water to protected SSCs can be demonstrated by reviewing plant/construction drawings and specifications. If visible, internal seals should also be inspected; see previous discussion on seal inspection guidance. The following factors can be considered in making a reasonable assurance determination:
Conduit/pipe material type; Construction methods; Type of joints; Page 17 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Elapsed time since installation; Conditions surrounding conduit/pipe (saturated soil, acidity, etc.);
Information regarding durability of conduit/pipe material and associated joints; and Signs of leakage inside the plant building, particularly at the terminus point.
o Signs of leakage and inspection results for internal seals should be captured on the Walkdown Record Form for the associated penetration or wall feature. The Walkdown Record Form should also include an attachment that contains the basis for the reasonable assurance determination, discussed above.
o Visually inspect all seals or other devices that are credited to prevent water intrusion into a space that contains safety related equipment or equipment credited for flood protection during a flooding event.
o Determine if there is any damage that would prevent the seals or other devices from performing their flood protection function. See previouslylisted supplemental guidance for Wall, Ceiling, and Floor Seals for additional guidance on seal inspection.
Roofs o Confirm that parapet heights do not exceed 1 foot, 4 inches on Seismic Category I structures.
o Confirm that roof feature openings have lip heights higher than the parapets or the opening can accommodate water without water entering the plant, or roof drains are capable of keeping the rain from entering the opening.
o Visually inspect all exterior exposed surfaces of the roof for significant indications of structural degradation or any openings that might permit flooding of the interior spaces.
o Confirm that visible penetrations are sealed.
o Built up surfaces of the roof that are covered with aggregate ballast, such as slag or gravel, are considered inaccessible and not subject to inspection.
Basement Floor Slabs o No signs of degradation.
o No spalling, scaling, or cracking of concrete surfaces.
Lake Screen House Walls o Verify that the structure is in place and in accordance with its design configuration, per plant documents.
o The walls should be inspected for evidence of structural damage that would prevent the walls from performing their design function of resisting the lake PMF with wave runup.
Ground Floor Door Thresholds, Removable Wall Panels and Radioactive Waste Loading Dock Walls o These features are evaluated for APM.
Page 18 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
The visual inspections revealed that the flood protection features met the acceptance criteria and were considered acceptable with the exception of the items entered into the CAP and are listed in Tables 3 and 4 of Section 5 of this report. Table 2 of Section 5 lists the flood protection features determined to be acceptable during the visual inspections.
A summary of the flood protection features that were determined to be acceptable are as follows:
Basement floor slabs did not have significant surface cracking, material degradation or show signs of water intrusion. Basement floor slabs were considered to be acceptable and capable of performing their design flood protection function.
Exterior walls credited for providing flood protection did not show signs of material degradation, spalling or significant cracking. Exterior walls did not show signs of water intrusion such as staining, calcification or stalactites. Exterior walls were considered to be acceptable and capable of performing their design flood protection function.
Penetration seals did not show signs of material degradation that would allow external water ingress. Penetration sleeves, piping and conduit material did not show corrosion. Conduit seals did not have water stains below the penetrations. Material and penetration locations were consistent with plant design drawings. Based on those observations, the penetration seals were considered to be acceptable and capable of performing their design flood protection function.
Safetyrelated roof parapet walls were observed to be less than 16 inches above the roof surface. It was determined water had no ingress paths to the plant through penetrations or deteriorated roofing. Roofs were determined to be capable of performing their design flood protection function.
Lake Screen House walls exposed to the lake were placed in accordance with design configuration and did not show signs of structural damage. Based on observations, the Lake Screen House walls were determined to be capable of performing their design flood protection function.
Site elevations, topography, and drainage pathways were found to be in accordance to site analyses and assumptions. No major modifications were found that would affect the analyses.
The LSCS flood protection strategy consists of incorporated passive features only and no operator procedures. Therefore, additional adverse site and weather conditions do not impact the performance of the flood protection features and the sites flood protection plan.
Since penetrations in basement floor slabs are not specifically credited in the CLB, they were not walked down individually. Observations on penetrations in basement floor slabs were made during the floor slab walkdowns. Only two locations of the floor slab were not immediately judged as acceptable during the walkdown due to observed cracking in the slab and minor apparent groundwater inleakage. Neither of the inleakage locations was due to degraded conditions of or around penetrations.
LaSalle has four electrical conduit runs (Conduit 1, Conduit 2, Conduit 3 and Conduit 4) that enter the plant below the PMF flood elevation of 710.41 feet MSL. None of the four conduit runs tie into manholes. The conduits are at the following locations:
Conduit 1 - Unit 2 Heater Bay on Yline between 18 and 19 from elevations 682.25 feet MSL to 680.75 feet MSL Conduit 2 - Unit 1 Heater Bay on Yline between 12 and 13 from elevations 682.25 feet MSL to 680.75 feet MSL Page 19 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Conduit 3 - OffGas Filter Building on 14line between Ab and Ac from elevations 705.40 feet MSL to 703.90 feet MSL Conduit 4 - OffGas Filter Building on 11line between A and Ab from elevations 705.50 feet MSL to 707.50 feet MSL.
Conduits 1, 2 and 4 are continuous and not open to ground water from the plant exterior walls to their end point which is above the flood elevation based on review of electrical design drawings. Conduit 3 (penetrating below the flood elevation at 14line of the OffGas Building) connects to a drain point for duct runs outside of the offgas building before extending back into the reactor building. Inside the drain point, the conduits have drainage slots cut into them creating a potential flow path for water into the off gas building. A walkdown of the Conduit 3 penetration at the OffGas 14line exterior wall confirmed that the conduits had recently been resealed, preventing flood water from entering the plant.
All other electrical conduit runs enter inside the plant above 710.50 feet MSL, so if a manhole flooded, water would not get into the plant from those conduit runs. These conduits are also designed to have seals at the openings of the conduits either at the end on the exterior side of the plant or at the end on the inside of the plant.
Additional Protection Measures The basement floor slabs of the main power block buildings include a network of floor drains and sump pumps (primary and backup), which could route flood water away from safetyrelated equipment in the event of a beyonddesign basis flood. The primary function of these drains and pumps is to provide protection from internal flooding, but would also be available to route water from an external source. As these features are not credited for providing flood protection, a general observation was made and they appeared to be in good working order.
- e. Requested Information Item 2(e) - Implementation of Walkdown Process Present information related to the implementation of the walkdown process (e.g., details of selection of the walkdown team and procedures) using the documentation template discussed in Requested Information Item 1.j [in Enclosure 4 of the March 12, 2012, 50.54(f) letter], including actions taken in response to the peer review.
Flooding walkdowns were performed using guidance provided in NEI 1207 (Rev. 0A) Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features.
The members of the Walkdown team were selected to ensure that the team included individuals who are experienced in conducting visual inspections of plant structures, systems and components and flood protection features. The AMEC team for the LSCS Flooding Walkdown included a Senior Water Resources Engineer, A Junior Water Resources Engineer, a Senior Electrical Engineer, and a Junior Structural Engineer.
Both water resources engineers are flooding specialists and have significant experience with inspections and evaluations of flood protection features. The remaining two engineers are experienced in conducting visual inspection of plant SSCs. The Exelon personnel involved with the walkdowns were two Civil/Structural Engineers and Project Management professionals with plant knowledge and plant Maintenance Personnel that provided logistical support to the Walkdown teams.
Page 20 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Each AMEC team member completed Exelons Walkdown Training, Nuclear Generation Employee Training (NGET), and NANTeLs generic verification walkdowns of plant flood protection features course, including the NANTeL exam. The two Exelon Civil/Structural engineers also completed the NANTeL generic verification walkdown of plant flood protection features course and the NANTeL exam. In preparation for the walkdown, the team members reviewed and became familiar with the materials and content of NEI 12 07 (Rev. 0A); and they also became knowledgeable of the sites current flooding licensing basis and operating procedures by thoroughly reviewing them during the walkdown planning phase of the project.
Generally, two teams of three persons were utilized to perform the walkdowns. Two persons in each group were familiar with the plants flooding design basis; were specialists in either water, civil, structural or electrical engineering; were prepared for flooding walkdowns through training developed by the NEI Fukushima Flooding Task Force; and passed the NANTeL training and examination. The third member of the walkdown team was a plant specialist familiar with operations, configurations and the location of safety related plant structures, systems and components. Maintenance personnel accompanied the walkdown teams when necessary to provide additional logistical support. Where specific knowledge was necessary to inspect a flood protection feature, at least one member of the walkdown team had the ability to evaluate the acceptability of the feature credited with providing flood protecton.
The exception to having a group of three personnel perform the walkdown was when a feature was in a locked high radiation area. To limit dose and potential contamination, generally one NANTeL trained specialist, with one other individual with plant knowledge, entered the locked high radiation area and performed the walkdown.
A prejob brief was performed at the beginning of each workday. The subjects discussed in the prejob briefs included but were not limited to: positive component verification, inspection methodology, acceptance criteria, field documentation requirements, reporting degraded conditions and previous walkdown lessons learned. A highradiation prejob brief was performed with the walkdown team and radiation protection personnel when entering highradiation areas. Subjects discussed in highradiation prejob briefs included, but were not limited to, tasks required to complete the job, time required to complete the tasks, dose rate surveys, maximum dose rates and total allowable dose.
A combination of ladder, camera on a stick, and scaffolding were used to perform visual inspection on flood protection features that were not accessible from the plant floor. When a camera on a stick was used, the plant specialist extended the camera on a stick to a position where the condition of the feature could be fully inspected by the NANTeL trained personnel through a view finder screen. Pictures were captured from the camera on a stick.
Concrete walls were inspected using binoculars where appropriate. Wall crack widths were measured using crack width gauge cards.
Observations captured during the walkdowns were documented on paper copies of the Walkdown Record Form provided in Appendix B of NEI 1207 (Rev 0A). Pictures were taken of each penetration and of deficiencies on floor slabs and walls.
A daily project report was generated at the end of each workday documenting the following:
Industrial Safety/First Aid Radiological Information ALARA Information Page 21 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Production Performance Deficiencies Identified Operability Issues Identified General Problems Issue Reports (in CAP)
Items Requiring Further Review Lessons Learned Observations not immediately judged as acceptable were reported to Exelon personnel immediately and Issue Reports were entered in the CAP, as necessary.
- f. Requested Information Item 2(f) - Findings and Corrective Actions Taken/Planned Results of the walkdown including key findings and identified degraded, nonconforming, or unanalyzed conditions. Include a detailed description of the actions taken or planned to address these conditions using the guidance in Regulatory Issues Summary 200520, Rev 1, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Conditions Adverse to Quality or Safety, including entering the condition in the corrective action program.
One hundred eightyfive (185) flood protection features were on the walkdown list. Accessible features were inspected to determine their compliance with acceptance criteria provided in NEI 1207 (Rev. 0A).
One hundred twelve (112) flood protection features were immediately determined as acceptable and capable of performing the designed flood protection function. Those features are listed in Table 2 of Section 5.
Thirty (30) features were observed to be in a condition that could not be immediately judged as acceptable but through the CAP were determined not to be deficiencies. A summary of those features by feature type are as follows:
Five (5) exterior walls Twentyone (21) penetration seals Two (2) floor slabs Two (2) roofs A complete list of those features, observations, issue report numbers and resolutions are provided in Table 3 of Section 5.
Observations Designated through CAP as Deficient and Corrective Actions Planned Two (2) penetration seals and four (4) exterior doors were observed to be in a condition that could not be immediately judged as acceptable and during the CAP process were determined to be deficiencies. Note that for the exterior doors, the deficiencies are reported as three, because two doors are considered to be the same deficiency and were written in the same Issue Report in CAP. Additionally, note that these three (3) deficiencies (four (4) door thresholds) were not on the walkdown list, because they were originally Page 22 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
surveyed for Available Physical Margin (APM) only. The doors are D20 (Reactor Building secondary containment missile door - rail #2) and D164 (U2 TB trackway door, rail #3) in Zone I, D479 (Unit 1 Diesel Generator Corridor door) in Zone II, and D508 (Unit 2 Diesel Generator Corridor door) in Zone I. The penetrations were 1TB1144 in the Unit 1 Turbine Building Makeup Demineralizer (MUDS) room and Generic Cast Iron 2 in the Unit 1 Turbine Building Tube Pull Area.
Penetration 1TB1144 is located in the Unit 1 Turbine Building MUDS room at elevation 705.83 feet MSL on column 1 between rows V and W. The pipe through penetration 1TB1144 appeared to have shifted, separating the seal cover from the sleeve creating a gap approximately 2 to 3 inches wide. Water stains were observed on the wall below the penetration and a small amount of puddling water was observed on the floor. The sleeve could provide a pathway for water to enter the plant. The volume of water that could enter the site would be limited by the soil outside of the penetration. In addition, any water entering the building would be removed by the sump pumps in the MUDS room. The MUDS room does not contain any safety related equipment. This condition was entered into the sites CAP through Issue Report (IR) 1401068, and the corrective action is to repair the seal.
Generic Cast Iron 2 is located in the Unit 1 Turbine Building Tube Pull Pit. The cast iron pipe transports water for an eye wash. The penetration did not have a penetration seal and therefore could potentially provide a pathway for water inflow. The volume of water that could enter the site would be limited by the soil outside of the penetration. In addition, any water entering the building would be routed to sumps by floor drains upon entering the plant. This condition was entered into the sites CAP through IR 1401463, and the corrective action is to repair/provide a seal.
The door D479 threshold elevation was surveyed to be 710.35 feet MSL. The threshold elevation of door D 479 is 0.06 feet below the CLB flood elevation of 710.41 feet MSL and 0.02 feet below the calculated flood elevation for Zone II of 710.37 feet MSL. A PMP flood event could be postulated to enter the buildings through D479. However, there is an 18 inch tall flood barrier just inside the door made of sheet metal and steel angles that is anchored to the floor and caulked. This condition was entered into the sites CAP through IR 1416084. The calculation was reviewed, and it is apparent there is additional margin. Therefore, the corrective action is to revise the Zone II calculation to show the additional margin of flooding to the plant floor.
The door D20 threshold elevation was surveyed to be 710.39 feet (MSL), and the door D164 threshold elevation was surveyed to be 710.40 feet (MSL). The threshold elevation of door D20 is 0.09 feet below the current calculated flood elevation for Zone I at D20 of 710.48 feet MSL, and the threshold elevation of door D164 is 0.08 feet below the current calculated flood elevation for Zone I at D164 of 710.48 feet MSL.
During a PMP flood event, water could be postulated to enter the buildings through door D20 or door D 164. This condition was entered into the sites CAP through IR 1413252. The existing analysis uses a hand calculation. A preliminary analysis was performed by Site Engineering using HECRAS (the same hydraulic modeling program used to analyze Zone II), which shows there is sufficient margin to plant flooding due to PMP. The corrective action is to formalize the preliminary hydraulic analysis on Zone I using HECRAS by issuing a revision to the calculation.
The door D508 threshold elevation was surveyed to be 710.29 feet MSL. The threshold elevation of door D 508 is 0.19 feet below the Zone I calculated flood elevation of 710.48 feet MSL. A PMP flood event could be postulated to enter the buildings through D508. This condition was entered into the sites CAP through IR 1415966. The existing analysis uses a hand calculation. A preliminary analysis was performed by Site Engineering using HECRAS (the same hydraulic modeling program used to analyze Zone II), which shows Page 23 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
there is sufficient margin to plant flooding due to PMP. The corrective action is to formalize the preliminary hydraulic analysis on Zone I using HECRAS by issuing a revision to the calculation.
Other Items Awaiting Final Disposition in CAP During the review of CLB documents, a discrepancy was identified between the PMF flood elevation reported in the UFSAR and the hydraulic calculations (Calculations S66 and L002536). The highest calculated flood elevation for Zone I (north area of the plant) is 710.48 feet MSL based on Calculation S66.
The highest calculated flood elevation for Zone II (south area of the plant) is 710.37 feet MSL based on Calculation L002536. However, the UFSAR states that the maximum water surface elevation due to local intense PMP would not exceed 710.41 feet MSL. It appears that the UFSAR was not updated the last time S66 was revised. This discrepancy was documented in IR 1413252, and is being tracked in the CAP.
Restricted Access Areas Four (4) penetrations in the Unit 1 Turbine Building, three (3) penetrations in the Unit 2 Turbine Building, eight (8) penetrations in the OffGas Filter Building, and portions of basement floor slabs and exterior walls in the Turbine, Heater Bay, Auxiliary and OffGas Filter buildings that are within scope were not walked down due to high radiation dose rates, and therefore were considered restricted access. These areas will be walked down during the next refueling outage. The next Unit 2 refueling outage (L2R14) is currently scheduled for February 11, 2013 to March 6, 2013, and the next Unit 1 refueling outage (L1R15) is currently scheduled for February 10, 2014 to March 1, 2014. In addition, Units 1 and 2 Reactor Building tendon tunnels were considered restricted areas because floor plugs have to be pulled and radiation protection support for confined space is required. Access to the tendon tunnels requires disassembly of floor plugs to gain access, so it will be performed during the planned access currently scheduled to be completed by August 26, 2013. The features considered to be in restricted access areas are provided in Table 5 in Section 5.
Inaccessible Areas Portions of basement floor slabs and exterior walls in the Units 1 and 2 Turbine Building were considered inaccessible because these areas cannot reasonably be inspected due to a significant personnel safety hazard. A complete list of slab and wall locations is provided in Table 6 of Section 5. These features are in high radiation rooms that remain high radiation rooms during outages, and therefore are considered inaccessible. The inaccessible rooms contain tanks that hold highlyradioactive fluids and sludge. An additional area that is considered inaccessible is the FC (Fuel Pool Cooling) filter rooms, due to very high radiation levels. Assuming a 10 minute inspection per room, it was estimated by Radiation Protection that the total dose received by the inspection team (only using two people) would be 2.494 REM. This does not include the extra dose that would be received while inspecting the FC filter rooms, or extra dose received from support activities for entering the tank rooms and FC filter rooms, including floor cleaning/decontamination. There is no planned or foreseen time when these rooms would become non high radiation rooms. Therefore, because the rooms are high radiation areas, the estimated dose to the team is very high, and the rooms are not planned to become nonhigh radiation areas, the rooms are considered inaccessible. This also applies to the FC filter rooms. Since these areas were not able to be walked down, alternate methods were used to evaluate them, which are described below.
Basement floor slabs and exterior walls immediately adjacent to the inaccessible areas were walked down and determined acceptable. The slabs in these rooms and the surrounding slabs that were inspected are part of the common basemat for the building complex, which is a minimum of 68 thick concrete, Page 24 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
including the mud mat below and the finish floor above. Additionally, there is undisturbed low permeability clay beneath the mud mat, so there is reasonable assurance that the floors in these rooms are capable of performing their design function during a design basis flooding event. The exterior walls of the FC filter rooms (there are no exterior walls for the tank rooms), which includes the walls from elevation 677.00 feet MSL to elevation 710.50 MSL feet, are 4 feet thick. No other walls in the entire complex were declared Deficiencies. Given the thickness of the wall and because no other walls were declared Deficient, it was judged that this section of wall is acceptable and would be able to perform its design function in the event of a design basis flood. The features considered to be in inaccessible areas due to high radiation dose rates that will not decrease during outage are listed in Table 6 in Section 5.
Observations on penetrations in basement floor slabs in accessible areas were made during the floor slab walkdowns. Only two locations of the floor slab were not immediately judged as acceptable during the walkdown due to observed cracking in the slab and minor apparent groundwater inleakage. Neither of the inleakage locations was due to degraded conditions of or around penetrations. Based on those observations, there is reasonable assurance that floor slab penetrations in inaccessible areas are capable of performing their flood protection function.
Sump pits were considered inaccessible due to significant disassembly of equipment to gain access.
However, no signs of potential groundwater inleakage were observed around sump pits during the basement floor slab walkdowns. In addition, the following items provide reasonable assurance that groundwater or floodwater will not challenge safety related plant equipment:
In the Reactor Building, concrete slabs are generally a minimum of 5 feet thick around the sumps.
In the Diesel Basement and Turbine Building, concrete slabs are generally a minimum of 3 feet thick around the sumps. This is comparable to slabs that were inspected and found to not be deficient.
LaSalle has a nearly impervious clay layer (undisturbed) surrounding the sumps, which would minimize flow in the event a crack in the slab is present.
Sump pumps are located throughout the buildings, which could potentially accommodate any small amount of leakage if it were to penetrate through any potential cracks in the sump pits. Sump pumps generally have backups and hilevel alarms.
Preventative Maintenance is performed on multiple sump pumps in all buildings.
The Turbine Building (where a majority of sumps are located) is designed to retain a substantial amount of water before allowing water to enter the Auxiliary, Diesel, or Reactor Buildings.
Failure of these features to perform their flood protection function would mean that water would enter the plant through a crack in the slab, sump pit or wall. If failure of these features were to occur, the failures would be independent of each other due to the feature locations and the nature of the failure. Depending on the location of multiple failures occurring, the inleakage could potentially cause greater water accumulation than if only one failure occurred. However, it is reasonable to conclude that the amount of water seeping through the crack would be relatively small considering the nearly impermeable clay below the slab and mud mat, and surrounding the opengraded stone outside of the walls. Also, there are multiple sump pumps in all buildings that could remove any of this seepage, many of which have preventive maintenance performed on them. Watertight doors separate rooms that contain redundant safetyrelated equipment in the Diesel Generator Building and Reactor Building. Additionally, the safety related buildings are protected to an elevation of 6734 from the Turbine Building, so water would first have to fill the entire Turbine Building Basement (which is at elevation 663) more than 10 feet deep before safety related Page 25 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
equipment would be affected, if the sump pumps in the Turbine Building were to fail. This is a significant volume that is not postulated to be reached during a shortterm PMP event with water entering the plant via postulated cracks.
Unanalyzed Conditions There were not any unanalyzed conditions identified during the flooding walkdowns.
- g. Requested Information Item 2(g) - Cliff -Edge Effects and Available Physical Margin Document any cliffedge effects identified and the associated basis. Indicate those that were entered into the corrective action program. Also include a detailed description of the actions taken or planned to address these effects.
Cliffedge effects were defined in the NTTF Report (Reference 5) as the safety consequences of a flooding event may increase sharply with a small increase in the flooding level. As indicated in Sections 3.12 of NEI 1207 (Reference 2), the NRC is no longer expecting the Recommendation 2.3: Flooding Walkdowns to include an evaluation of cliffedge effects. The NRC is now differentiating between cliffedge effects, which are addressed in Enclosure 2 of Reference 3, and Available Physical Margin (APM).
As indicated in Sections 3.13 of NEI 1207 (Reference 2), APM describes the flood margin available for applicable flood protection features at a site (not all flood protection features have APMs). The APM for each applicable flood protection feature is the difference between licensing basis flood height and the flood height at which water could affect an SSC important to safety.
APM information was collected during the walkdowns in accordance with guidance provided in NEI 1207 and the final resolution to FAQ006. APM was collected to primarily support the response to Enclosure 2 of Reference 3 and, as such, is not included in this report. APM determinations did not involve calculating cliff edge effects (i.e. the safety consequences). During the Integrated Assessment (see Enclosure 2 of Reference 3), the cliffedge effects and the associated safety risks will be evaluated using the APMs and other information, such as the specific SSCs that are subjected to flooding and the potential availability of other systems to mitigate the risk.
Since the walkdowns were completed prior to the final resolution of FAQ006 (September 13, 2012), APM information was collected and documented on the Walkdown Record Form using the old approach; that is, where applicable, a simple measurement of the difference between the licensing basis flood height and the flood height at which water could affect an SSC important to safety.
- h. Requested Information Item 2(h) - Planned/NewlyInstalled Flood Protection Enhancements Describe any other planned or newly installed flood protection systems or flood mitigation measures including flood barriers that further enhance the flood protection. Identify results and any subsequent actions taken in response to the peer review.
The site has requested a preventative maintenance plan to periodically inspect and maintain roof drains to assure they remain open and functional during rain events. Service Request 00079453 was created.
Page 26 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- 5. CONCLUSIONS The Flooding Walkdown at LaSalle County Station was conducted between August 10 and September 14, 2012 and included a visual inspection of belowgrade walls, penetrations, basement floor slabs, roofs and the site drainage plan; also, available physical margin surveys of above grade exterior doors, removable wall panels and the radioactive waste loading docks were performed. A list of flood protection features considered to be acceptable and capable of performing their flood protection function is provided in Table 2.
Thirty (30) flood protection features were observed to be in a condition that could not be immediately judged as acceptable during the walkdown but were not considered deficiencies after the observation was reviewed in the CAP. A summary of those features is provided in Table 3.
Five (5) flood protection features were observed to be in a condition that could not be immediately judged as acceptable during the walkdown and were considered deficiencies after the observation was reviewed in the CAP. Note that three (3) of these deficiencies were for features not on the walkdown list, because they were originally surveyed for Available Physical Margin (APM) only. A summary of those features is provided in Table 4.
Thirtythree (33) features were in areas considered to be restricted access and are deferred to outage due to high radiation dose rates or significant equipment disassembly. These areas will be walked down during outage. The features considered to be in restricted areas are listed in Table 5.
Seven (7) features were considered inaccessible because they are in rooms that cannot reasonably be inspected due to significant personnel safety hazard. These inaccessible rooms have high dose rates that do not decrease during outages. One (1) feature, sump pits, was considered inaccessible because it would take significant equipment disassembly to inspect. The features considered to be in inaccessible areas are listed in Table 6.
The site has requested a preventative maintenance plan to periodically inspect and maintain roof drains to assure they remain open and functional during rain events. Service Request 00079453 was created.
Table # 1: Summary - Features Included in the Walkdown Scope Feature Type Total Number Passive - Incorporated 185 Passive - Temporary 0 Active - Incorporated 0 Active - Temporary 0 Page 27 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #2: Inspected Flooding Features Meeting Acceptance Criteria Features Immediately Judged as Acceptable
- Feature ID # Description Passive/Active Incorporated/Temporary 1 1AB70 Penetration Passive - Incorporated 2 1DR19 Penetration Passive - Incorporated 3 1DR22 Penetration Passive - Incorporated 4 1DR29 Penetration Passive - Incorporated 5 1DR30 Penetration Passive - Incorporated 6 1DR35 Penetration Passive - Incorporated 7 1DR36 Penetration Passive - Incorporated 8 1DR37 Penetration Passive - Incorporated 9 1DR38 Penetration Passive - Incorporated 10 1DR39 Penetration Passive - Incorporated 11 1DR40 Penetration Passive - Incorporated 12 1DR6 Penetration Passive - Incorporated 13 1RB256 Penetration Passive - Incorporated 14 1RB258 Penetration Passive - Incorporated 15 1RB33 Penetration Passive - Incorporated 16 1RB50 Penetration Passive - Incorporated 17 1RB503 Penetration Passive - Incorporated 18 1RB504 Penetration Passive - Incorporated 19 1RB51 Penetration Passive - Incorporated 20 1RB61 Penetration Passive - Incorporated 21 1RB64 Penetration Passive - Incorporated 22 1RB67 Penetration Passive - Incorporated 23 1RB7 Penetration Passive - Incorporated 24 1RB83 Penetration Passive - Incorporated 25 1RB84 Penetration Passive - Incorporated 26 1TB525 Penetration Passive - Incorporated 27 1TB1108 Penetration Passive - Incorporated 28 1TB1272 Penetration Passive - Incorporated 29 1TB1273 Penetration Passive - Incorporated 30 1TB1310 Penetration Passive - Incorporated Page 28 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #2: Inspected Flooding Features Meeting Acceptance Criteria Features Immediately Judged as Acceptable
- Feature ID # Description Passive/Active Incorporated/Temporary 31 1TB264 Penetration Passive - Incorporated 32 1TB266 Penetration Passive - Incorporated 33 1TB267 Penetration Passive - Incorporated 34 1TB270 Penetration Passive - Incorporated 35 1TB274 Penetration Passive - Incorporated 36 1TB275 Penetration Passive - Incorporated 37 1TB517 Penetration Passive - Incorporated 38 1TB58 Penetration Passive - Incorporated 39 1TB591 Penetration Passive - Incorporated 40 1TB592 Penetration Passive - Incorporated 41 1TB593 Penetration Passive - Incorporated 42 1TB595 Penetration Passive - Incorporated 43 1TB673 Penetration Passive - Incorporated 44 1TB721 Penetration Passive - Incorporated 45 1TB75 Penetration Passive - Incorporated 46 1TB94 Penetration Passive - Incorporated 47 1WS03D 20in Pipe Penetration Passive - Incorporated 48 2DR1 Penetration Passive - Incorporated 49 2DR10 Penetration Passive - Incorporated 50 2DR13 Penetration Passive - Incorporated 51 2DR2 Penetration Passive - Incorporated 52 2DR3 Penetration Passive - Incorporated 53 2DR4 Penetration Passive - Incorporated 54 2DR6 Penetration Passive - Incorporated 55 2DR7 Penetration Passive - Incorporated 56 2DR8 Penetration Passive - Incorporated 57 2RB1 Penetration Passive - Incorporated 58 2RB120 Penetration Passive - Incorporated 59 2RB147 Penetration Passive - Incorporated 60 2RB163 Penetration Passive - Incorporated Page 29 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #2: Inspected Flooding Features Meeting Acceptance Criteria Features Immediately Judged as Acceptable
- Feature ID # Description Passive/Active Incorporated/Temporary 61 2RB2 Penetration Passive - Incorporated 62 2RB26 Penetration Passive - Incorporated 63 2RB27 Penetration Passive - Incorporated 64 2RB3 Penetration Passive - Incorporated 65 2RB6 Penetration Passive - Incorporated 66 2RB70 Penetration Passive - Incorporated 67 2RB74 Penetration Passive - Incorporated 68 2RB75 Penetration Passive - Incorporated 69 2RB76 Penetration Passive - Incorporated 70 2WS03D 20in Pipe Penetration Passive - Incorporated 71 4" pipe Penetration Passive - Incorporated 72 Electrical Conduit Group Penetration Passive - Incorporated 4
73 Four (4) Pipes Encased in Penetration Passive - Incorporated Concrete 74 GENERIC CAST IRON Penetration Passive - Incorporated 75 Lake Screen House Walls Concrete Wall Passive - Incorporated 76 OB170 Penetration Passive - Incorporated 77 OB171 Penetration Passive - Incorporated 78 OB173 Penetration Passive - Incorporated 79 OB66 Penetration Passive - Incorporated 80 OB67 Penetration Passive - Incorporated 81 OB69 Penetration Passive - Incorporated 82 OB70 Penetration Passive - Incorporated 83 OB75 Penetration Passive - Incorporated 84 OB76 Penetration Passive - Incorporated 85 OB77 Penetration Passive - Incorporated 86 OB78 Penetration Passive - Incorporated 87 OB79 Penetration Passive - Incorporated 88 OB80 Penetration Passive - Incorporated Page 30 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #2: Inspected Flooding Features Meeting Acceptance Criteria Features Immediately Judged as Acceptable
- Feature ID # Description Passive/Active Incorporated/Temporary 89 OffGas Filter Building Slab Passive - Incorporated Basement Floor Slab 90 OffGas Filter Building Concrete Wall Passive - Incorporated Exterior Wall (Basement) 91 OffGas Filter Building Concrete Wall Passive - Incorporated Exterior Wall (Upper Basement) 92 Pipe encased in concrete Penetration Passive - Incorporated 93 Reactor Building Roof Roof Passive - Incorporated 94 Sch. 40 Penetration Passive - Incorporated 95 U2 DG Building Roof Roof Passive - Incorporated 96 Unit 1 Diesel Generator Slab Passive - Incorporated Building Basement Floor Slab 97 Unit 1 Diesel Generator Concrete Wall Passive - Incorporated Building Exterior Wall (Upper Basement) 98 Unit 1 Reactor Building Slab Passive - Incorporated Basement Floor Slab 99 Unit 1 Reactor Building Concrete Wall Passive - Incorporated Exterior Wall (Basement) 100 Unit 1 Reactor Building Concrete Wall Passive - Incorporated Exterior Wall (Upper Basement) 101 Unit 1 Turbine Building Concrete Wall Passive - Incorporated Exterior Wall (Basement) 102 Unit 1 Turbine Building Concrete Wall Passive - Incorporated Exterior Wall (Upper Basement) 103 Unit 2 Diesel Generator Concrete Wall Passive - Incorporated Building Exterior Wall (Upper Basement) 104 Unit 2 Reactor Building Slab Passive - Incorporated Basement Floor Slab 105 Unit 2 Reactor Building Concrete Wall Passive - Incorporated Exterior Wall (Basement)
Page 31 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #2: Inspected Flooding Features Meeting Acceptance Criteria Features Immediately Judged as Acceptable
- Feature ID # Description Passive/Active Incorporated/Temporary 106 Unit 2 Reactor Building Concrete Wall Passive - Incorporated Exterior Wall (Upper Basement) 107 Unit 2 Turbine Building Slab Passive - Incorporated Basement Floor Slab 108 Unit 2 Turbine Building Concrete Wall Passive - Incorporated Exterior Wall (Upper Basement) 109 10inch Sleeve Penetration Passive - Incorporated 110 1AB69 Penetration Passive - Incorporated 111 Generic Cast Iron 3 Penetration Passive - Incorporated 112 Site Drainage Plan - Site Drainage Passive - Incorporated Plant Configuration Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 1 1DR20 Penetration Corrosion on Yes, Recommended Actions:
bottom of documented Clean surface corrosion, penetration sleeve. in IR 1399525 paint and seal the penetration.
2 1DR27 Penetration Corrosion on the Yes, Immediate actions taken:
bottom of the pipe documented Confirmed the ability of penetration sleeve, in IR 1399598 the penetration sleeve to and flamecutting perform its design of seal plate not function. Recommended associated with Actions:
water degradation. Initiate a Document Change Request or other actions as appropriate (for example, weld overlay to restore to original design condition).
Page 32 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 3 1DR28 Penetration Corrosion Yes, Recommended Actions:
observed at the documented Clean surface corrosion, bottom of the in IR 1399536 paint and seal the sleeve. Signs of penetration.
past leakage (i.e.
water stains) found below the penetration.
4 1RB13 Penetration Surface rusting on Yes, Recommended Actions:
bottom documented Clean surface corrosion, in IR 1426637 paint/seal the penetration/piping.
5 1TB1270 Penetration Rust, corrosion and Yes, Recommended Actions:
staining below the documented Remove rust, inspect pipe feature. in IR 1401010 and penetration. Seal the penetration.
6 1TB1271 Penetration Rust/corrosion of Yes, Recommended Actions:
sleeve and pipe. documented The rubber penetration Staining from in IR 1401001 seal must be repaired or apparent water replaced. When repairing leaks below the or replacing the seal, the feature. condition of the WD piping should be evaluated for potential replacement due to the amount of corrosion on the piping.
The missing insulation should be replaced.
7 1TB265 Penetration Stalactites on Yes, Recommended Actions:
bottom of feature. documented Remove rust and calcified Signs of corrosion. in IR 1400652 material, paint and reseal the penetration.
8 1TB269 Penetration Rust and flaking on Yes, Recommended Actions:
the right side of documented Remove rust, paint and the feature. in IR 1400673 reseal.
Page 33 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 9 1TB96 Penetration Rust and flakes on Yes, Recommended Actions:
bottom of feature. documented Clean surface corrosion, Feature material is in IR 1426636 paint/seal the degrading, staining penetration.
below penetration.
10 2DR9 Penetration Rust and surface Yes, Recommended Actions:
corrosion present documented Clean surface corrosion, on bottom of in IR 1400278 paint and seal the sleeve with slight penetration.
flaking. Signs of slight apparent ground water in leakage.
11 2TB1 Penetration Rust and flaking Yes, Recommended Actions:
observed on the documented Remove rust, paint and pipe and sleeve. in IR 1400662 reseal the penetration.
Water stains on wall below penetration 12 30inch pipe Penetration Rust and flaking Yes, Recommended Actions:
were observed, documented Clean surface corrosion, along with signs of in IR 1400252 paint and seal the leakage on the wall penetration.
below the pipe.
13 Electrical Conduit Penetration Evidence of water Yes, Conduits are continuous Group staining, but no documented to above 710'6" and do signs of active in IR 1412024 not have a point where leakage. Small water can enter.
amount of corrosion present at bottom of the penetrations, but does not affect structural integrity.
14 Electrical Conduit Penetration Evidence of water Yes, Conduits are continuous Group 2 staining, but no documented to above 710'6" and do signs of active in IR 1412028 not have a point where leakage. Small water can enter.
amount of corrosion present at bottom of the penetrations, but does not affect structural integrity.
Page 34 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 15 Generic Cast Iron 4 Penetration Corrosion on Yes, Recommended Actions:
bottom of pipe. documented Remove rust, paint and Signs of leakage. in IR 1400635 reseal the penetration.
16 Unit 1 Auxiliary Wall Leaching at various Yes, Recommended Actions:
Building Exterior Wall locations from documented Engineering to monitor (Basement) J:9_15. Water in IR 1401610 wall for emergent ground stains on wall and water inleakage floor at J:11_12. (seepage) per the Structural Monitoring Program and initiate an appropriate IR as required if leakage is observed.
17 Unit 1 Diesel Wall Rust colored Yes, Immediate actions taken:
Generator Building calcium leaching documented Evaluated the condition Exterior Wall showing from 3 in IR 1400272 per American Concrete (Basement) foot long crack in Institute ACI 349.3R02 DIV I CSCS. (Reapproved 2010),
"Evaluation of Existing Nuclear SafetyRelated Concrete Structures",
Chapter 5 "Evaluation Criteria". Recommended Actions:
Continue monitoring for spalling of the concrete at this location in the Structures Monitoring Program.
18 Unit 1 Ice Melt Penetration Entire pit area is Yes, Recommended Actions:
Penetration A considered part of documented Clean the calcium buildup this penetration (ie in IR 1401110 on the U1 Deicing Pit "A" walls and slab). and "B" penetrations Condition not and seal the penetrations acceptable due to as necessary.
leaching; evidence of water leakage/accumulat ion.
Page 35 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 19 Unit 1 Ice Melt Penetration Entire pit area is Yes, Recommended Actions:
Penetration B considered part of documented Clean the calcium buildup this penetration (ie in IR 1401110 on the U1 Deicing Pit "A" walls and slab). and "B" penetrations Condition not and seal the penetrations acceptable due to as necessary.
leaching; evidence of water leakage/accumulat ion.
20 Unit 1 Turbine Building Slab Crack between Yes, Immediate actions taken:
Basement Floor Slab concrete floor slab documented Notified the Work and concrete in IR 1400720 Execution Center of the containment curb and IR water on the floor in Muds Room. 1401884 (possible fall hazard). The Water stains and area will be roped off and debris observed posted.
around the crack. Recommended Actions:
(MUDS Room): Clean floor and seal the leaks in the floor. (D HTR DRN PMP Room): Engineering to monitor the floor for emergent ground water inleakage (seepage) per the Structural Monitoring Program and initiate an appropriate IR as required if leakage is observed.
21 Unit 2 Auxiliary Wall Leaching and Yes, Recommended Actions:
Building Exterior Wall calcification on documented Engineering to monitor (Basement) walls in places on in IR 1401610 wall for emergent ground Jline from 15 to water inleakage
- 21. (seepage) per the Structural Monitoring Program and initiate an appropriate IR as required if leakage is observed.
Page 36 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 22 Electrical Conduit Penetration Slight water Yes, The conduits had recently Group 3 staining of documented been sealed to stop the the wall below in IR 1412039 inleakage. No the conduits due recommended or immediate action.
to past leakage.
23 U1 DG Building Roof Roof Clogged roof Yes, Recommended Actions:
drains documented Clean the roof drains.
in IR 1402098 24 1inch conduit Penetration Conduit is not Yes, Immediate Actions:
documented in documented Searched drawings to plant drawings in IR 1419529 find the conduit -
nothing was found.
Used a borescope to identify a seal.
Recommended Actions:
As an enhancement to the current seal, a work request was initiated to put duct seal into the conduit.
25 Auxiliary & Turbine Roof Open bathroom Yes, Immediate Action:
Building Roof vents could documented Performed preliminary potentially in IR 1424707 evaluation, which provide flow path showed that water for water would not enter the vents in the case of a design basis rain event.
Recommended Action:
Formalize the evaluation.
Page 37 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 26 Unit 2 Diesel Slab Possible Yes, Recommended Actions:
Generator Building groundwater documented Grout floor to stop Basement Floor Slab infiltrating from in IR 1400268 ground water inleakage.
crack in slab in the Replace stanchion Division 1 CSCS baseplate room. associated with Full Flow Test instrumentation 2FE038 and add 1.5 inches of grout. Clean/paint the stanchion baseplate associated with instrument 2FIFC035.
27 Unit 2 Diesel Wall Leaking, leaching Yes, Recommended Actions:
Generator Building and calcification documented Clean and grout any Exterior Wall observed on walls in IR 1400223 visible openings.
(Basement) in DIV III DGST and DIV I CSCS.
28 Unit 2 Ice Melt Penetration Entire pit area is Yes, Recommended Actions:
Penetration A considered part of documented Clean the calcium buildup this penetration (ie in IR 1401119 on the U2 Deicing Pit "A" walls and slab). and "B" penetrations Condition not and seal the penetrations acceptable due to as necessary.
leaching; evidence of water leakage/accumulat ion.
29 Unit 2 Ice Melt Penetration Entire pit area is Yes, Recommended Actions:
Penetration B considered part of documented Clean the calcium buildup this penetration (ie in IR 1401119 on the U2 Deicing Pit "A" walls and slab). and "B" penetrations Condition not and seal the penetrations acceptable due to as necessary.
leaching; evidence of water leakage/accumulat ion.
Page 38 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #3: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Not Designated as Deficient Through CAP
- Feature ID # Description Observation Component Resolution Operability 30 Unit 2 Turbine Building Wall Crack in wall in Yes, Recommended Actions Exterior Wall Amertap Room. documented (Amertap):
(Basement) Leaching and in IR 1401906 Engineering to monitor water stains on the & IR 1402075 the north Amertap Room wall and floor Wall for emergent ground below the crack. water inleakage Also, (seepage) per the calcification and Structural Monitoring staining on 21line Program and initiate an from L to R. appropriate IR as required if leakage is observed.
Recommended Actions (21line from L to R):
Engineering to monitor the 2WF03TA/B Room North Wall for emergent ground water inleakage (seepage) per the Structural Monitoring Program and initiate an appropriate IR as required if leakage is observed.
Page 39 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #4: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Designated as Deficient through CAP
- Feature ID # Description Observation Component Resolution Deficiency 1 1TB1144 Penetration Significant rust and Yes, Immediate Actions: It corrosion, plate is documented was determined safety separated from in IR 1401068 related equipment would sleeve. not be jeopardized in the event of a design basis flood event.
Recommended Actions:
The seal must be repaired and the associated piping inspected and repaired as required.
2 Generic Cast Iron 2 Penetration No seal between Yes, Immediate Actions: It pipe and sleeve. documented was determined safety Pipe and sleeve in IR 1401463 related equipment would material shows not be jeopardized in the heavy rust and event of a design basis apparent flood event.
deterioration.
Recommended Actions:
Staining below The penetration seal penetration shows must be replaced.
signs of possible ground water intrusion.
3 Door D20 and Door D Exterior Door The threshold Yes, Immediate Actions:
164 Threshold elevations were documented Performed a preliminary below the in IR 1413252 analysis, which shows calculated flood there is sufficient margin elevation to plant flooding due to PMP.
Recommended Actions:
Formalize the analysis by revising the applicable calculation(s), which is being tracked through CAP.
Page 40 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #4: Inspected Features Not Immediately Judged as Acceptable Flood Features Not Meeting Acceptance Criteria, Designated as Deficient through CAP
- Feature ID # Description Observation Component Resolution Deficiency 4 Door D479 Exterior Door The threshold Yes, Immediate Action:
Threshold elevation was documented Verified the existing below the CLB in IR 1416084 flood barrier was flood elevation intact.
Recommended Action:
Revise the analysis to show the additional margin of flooding to the plant floor. This is being tracked through CAP.
5 Door D508 Exterior Door The threshold Yes, Immediate Actions:
Threshold elevation was documented Performed a below the CLB in IR 1415966 preliminary analysis, flood elevation which shows there is sufficient margin to plant flooding due to PMP.
Recommended Actions: Formalize the analysis by revising the applicable calculation(s), which is being tracked through CAP.
Table #5: Features Classified as Restricted Access
- Feature ID # Description Reason Resolution 1 Off Gas Pipe 1 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 2 Off Gas Pipe 2 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 3 Off Gas Pipe 3 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 Page 41 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #5: Features Classified as Restricted Access
- Feature ID # Description Reason Resolution 4 Off Gas Pipe 4 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 5 OffGas Filter Building row AA.5 to AD High radiation dose rates that Unit 1 refueling outage Basement Floor Slab_1 and column 11 decrease during outage (L1R15) scheduled for to 12.5 2/10/143/1/14 6 OffGas Filter Building row AA.5 to AD High radiation dose rates that Unit 2 refueling outage Basement Floor Slab_2 and column 12.5 decrease during outage (L2R14) scheduled for to 14 2/11/133/6/13 7 OffGas Filter Building row AA.5 to AD High radiation dose rates that Unit 1 refueling outage Basement Wall 2_1 and column 11 decrease during outage (L1R15) scheduled for to 12.5 2/10/143/1/14 8 OffGas Filter Building row AA.5 to AD High radiation dose rates that Unit 2 refueling outage Basement Wall 2_2 and column 12.5 decrease during outage (L2R14) scheduled for to 14 2/11/133/6/13 9 OffGas Filter Building 11line from AB High radiation dose rates that Unit 1 refueling outage Upper Basement Wall to AD and AD decrease during outage (L1R15) scheduled for 2_1 line from 11 to 2/10/143/1/14 12.5 10 OffGas Filter Building ADline from High radiation dose rates that Unit 2 refueling outage Upper Basement Wall 12.5 to 14 and decrease during outage (L2R14) scheduled for 2_2 14line from AB 2/11/133/6/13 to AD 11 Unit 1 Auxiliary Building 8.9line from N High radiation dose rates that Unit 1 refueling outage Upper Basement Wall - to S (El. 687) decrease during outage (L1R15) scheduled for Steam Tunnel 2/10/143/1/14 12 Unit 1 Heater Bay Yline from 7 to High radiation dose rates that Unit 1 refueling outage Upper Basement 11 decrease during outage (L1R15) scheduled for Exterior Wall (HDT 2/10/143/1/14 Room) 13 Unit 1 Turbine Building column 5 to 11 High radiation dose rates that Unit 1 refueling outage Basement Floor Slab 2 - and S to V decrease during outage (L1R15) scheduled for Condenser Pit 2/10/143/1/14 14 Unit 1 Turbine Building column 5 to 11 High radiation dose rates that Unit 1 refueling outage Basement Wall 2 - and S to V decrease during outage (L1R15) scheduled for Condenser Pit 2/10/143/1/14 Page 42 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #5: Features Classified as Restricted Access
- Feature ID # Description Reason Resolution 15 Unit 1 Turbine Building 5line from S.5 High radiation dose rates that Unit 1 refueling outage Upper Basement Wall 2 to U.5 and Sline decrease during outage (L1R15) scheduled for (Upper Condenser Pit) from 5 to 8.9 2/10/143/1/14 and HP Heater room and 8line from R to S (El.
704.5) 16 Unit 2 Auxiliary Building 21.1line from High radiation dose rates that Unit 2 refueling outage Upper Basement Wall - R to S (El. 687) decrease during outage (L2R14) scheduled for Steam Tunnel 2/11/133/6/13 17 Unit 2 Heater Bay Yline from 19 High radiation dose rates that Unit 2 refueling outage Upper Basement to 23 and 23 decrease during outage (L2R14) scheduled for Exterior Wall (HDT line from X.5 to 2/11/133/6/13 Room) Y 18 Unit 2 Turbine Building column 19 to High radiation dose rates that Unit 2 refueling outage Basement Floor Slab 2 - 24 and S to V. decrease during outage (L2R14) scheduled for Condenser Pit 2/11/133/6/13 19 Unit 2 Turbine Building column 19 to High radiation dose rates that Unit 2 refueling outage Basement Wall 2 - 24 and S to V. decrease during outage (L2R14) scheduled for Condenser Pit 2/11/133/6/13 20 Unit 2 Turbine Building Vline from 23 to High radiation dose rates that Unit 2 refueling outage Upper Basement Wall 2 25, 25line from decrease during outage (L2R14) scheduled for (Upper Condenser Pit) S.5 to U.5, and S 2/11/133/6/13 and HP Heater room line from 21 to 25 and 22line from R to S (El.
704.5) 21 1TB271 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 22 1TB516 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 23 2TB114 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 24 OB156 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 Page 43 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #5: Features Classified as Restricted Access
- Feature ID # Description Reason Resolution 25 OB168 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 26 OB169 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 27 OB71 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 28 OB72 Penetration High radiation dose rates that Unit 2 refueling outage decrease during outage (L2R14) scheduled for 2/11/133/6/13 29 OB73 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 30 OB74 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 31 OB81 Penetration High radiation dose rates that Unit 1 refueling outage decrease during outage (L1R15) scheduled for 2/10/143/1/14 32 Unit 1 Reactor Building Entire Tendon Disassembly and radiation Floor plug disassembly Tendon Tunnel Floor Tunnel Slab support for confined space and tendon tunnel Slab access scheduled complete by 8/26/13 33 Unit 2 Reactor Building Entire Tendon Disassembly and radiation Floor plug disassembly Tendon Tunnel Floor Tunnel Slab support for confined space and tendon tunnel Slab access scheduled complete by 8/26/13 Page 44 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #6: Features Classified as Inaccessible
- Feature ID # Description Reason Resolution 1 Unit 1 Turbine Basement tank room Feature is in high radiation Reasonable assurance Building floor slabs within this rooms that remain high based on similar features Basement Floor perimeter: 13.4line radiation rooms during analysis Slab 3 from X to Y, Yline from outages 13.4 to 15, 15line from W.6 to Y, W.6line from 14 to 15, 14line from W.6 to X, Xline from 13.4 to 14, 2 Unit 1 Turbine Basement tank room Feature is in high radiation Reasonable assurance Building floor slabs from rooms that remain high based on similar features Basement Floor column 13 to 15 and radiation rooms during analysis Slab 4 row L to V outages 3 Unit 1 Turbine FC filter walls from Feature is in high radiation Reasonable assurance Building column 13 to 15 and rooms that remain high based on similar features Basement Walls 3 row Y to Ya, Elevation radiation rooms during analysis 677 to 710.5 outages 4 Unit 2 Turbine Basement tank room Feature is in high radiation Reasonable assurance Building floor slabs within this rooms that remain high based on similar features Basement Floor perimeter: 15line from radiation rooms during analysis Slab 3 W.6 to Y, Yline from outages 15 to 16, 16line from X to Y, Xline from 16 to 17.5, 17.5line from W.6 to X, W.6line from 17.5 to 18, 18line from W.6 to W, Wline from 16 to 18, 16line from W to W.6, W.6 line from 15 to 16 5 Unit 2 Turbine Basement tank room Feature is in high radiation Reasonable assurance Building floor slabs from rooms that remain high based on similar features Basement Floor column 15 to 17 and radiation rooms during analysis Slab 4 row L to V outages 6 Unit 2 Turbine Basement tank room Feature is in high radiation Reasonable assurance Building floor slabs from rooms that remain high based on similar features Basement Floor column 18 to 19 and radiation rooms during analysis Slab 5 row L to R outages Page 45 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
Table #6: Features Classified as Inaccessible
- Feature ID # Description Reason Resolution 7 Unit 2 Turbine FC filter walls from Feature is in high radiation Reasonable assurance Building column 15 to 18 and rooms that remain high based on similar features Basement Walls 3 row Y to Ya, Elevation radiation rooms during analysis 677 to 710.5 outages 8 Sump Pits Sump pits in the Reactor, Feature is inaccessible due to Reasonable assurance Auxiliary, Diesel significant disassembly of sump based on basement floor Generator, and Turbine pump assemblies slab walkdown Buildings observations, floor slab design and sump pumps
- 6. REFERENCES
- 1. Exelon Letter to U.S. Nuclear Regulatory Commission. Exelon Generation Company, LLCs 90Day Response to March 12, 2012 Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 and 2.3, of the NearTerm Task Force Review of Insights from the Fukushima Daiichi Accident (Flooding). June 11, 2012.
- 2. Nuclear Energy Institute (NEI), Report 1207 [Rev 0A]. Guidelines for Performing Verification Walkdowns of Plant Protection Features. May 2012 [NRC endorsed May 31, 2012; updated and re issued June 18, 2012].
- 3. U.S. Nuclear Regulatory Commission. Letter to Licensees. Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near Term Task Force Review of Insights from the Fukushima Daiichi Accident. March 12, 2012.
- 4. U.S. Nuclear Regulatory Commission. Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire. NUREG1852. October 2007.
- 5. U.S. Nuclear Regulatory Commission. Recommendations for Enhancing Reactor Safety in the 21st Century, The Near Term Task Force Review of Insights from the Fukushima Daiichi Accident. July 12, 2011.
- 6. U.S. Nuclear Regulatory Commission. Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety. NRC Inspection Manual. Part 9900: Technical Guidance. Regulatory Issues Summary 200520, Revisions 1.
September 26, 2005.
- 7. Institute of Nuclear Power Operations. Fukushima Daiichi Nuclear Station Fuel Damage Caused by Earthquake and Tsunami. INPO Event Report 111. March 15, 2011.
- 8. U.S. Nuclear Regulatory Commission. Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. Inspection Manual. Temporary Instruction 2515/183. ML113220407. November 2011.
Page 46 of 47
NTTF Recommendation 2.3 (Walkdowns): Flooding Exelon Corporation November 6, 2012 Revision {0}
- 9. U.S. Nuclear Regulatory Commission. Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants. Inspection Manual. Inspection Procedure 62002.
Section 03.01(h), Dams, Embankments and Canals.
- 10. U.S. Nuclear Regulatory Commission. Evaluate Readiness to Cope with External Flooding. Inspection Procedures. Attachment 71111.01. Adverse Weather Protection. Section 02.04.
- 11. U.S. Nuclear Regulatory Commission. NRC Inspector Field Observation Best Practices. NUREG/BR 0326, Rev. 1. August 2009.
- 12. U.S. Nuclear Regulatory Commission. Flood Protection for Nuclear Power Plants. Regulatory Guide 1.102.
- 13. LaSalle County Station, Updated Final Safety Analysis Report (UFSAR), Rev. 19.
- 14. LaSalle County Station, Topical Design Basis Document Flood Protection (DBDLSM11), Rev. B.
- 15. NUREG/CR4832, SAND920537, VOL. 7, Analysis of the LaSalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (RMIEP), External Event Scoping Quantification, M.K.
Ravindra and H. Bacon.
Page 47 of 47
U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Flooding November 27, 2012 Page 4 Enclosure 2
SUMMARY
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRCs information and are not regulatory commitments.)
COMMITMENT TYPE COMMITTED DATE COMMITMENT ONE-TIME ACTION PROGRAMMATIC OR "OUTAGE" (Yes/No) (Yes/No)
- 1. Exelon Generation Company, LLC (EGC) L1R15 Yes No will complete the inspection of the 17 Spring 2014 LaSalle Unit 1 features classified as restricted access and deferred due to inaccessibility. These items are listed in Table 5 of Enclosure 1.
- 2. Exelon Generation Company, LLC (EGC) L2R14 Yes No will complete the inspection of the 14 Spring 2013 LaSalle Unit 2 features classified as restricted access and deferred due to inaccessibility. These items are listed in Table 5 of Enclosure 1.
- 3. Exelon Generation Company, LLC (EGC) August 30, 2013 Yes No will complete the inspection of the LaSalle Unit 1 and 2 Reactor Building Tendon Tunnel Floor Slabs. These features are classified as restricted access and deferred due to inaccessibility. These items are listed in Table 5 of Enclosure 1.