RS-09-119, Registration of Use of Casks to Store Spent Fuel
ML092650232 | |
Person / Time | |
---|---|
Site: | Quad Cities, Holtec |
Issue date: | 09/22/2009 |
From: | Hansen J Exelon Generation Co, Exelon Nuclear |
To: | Document Control Desk, NRC/NMSS/SFPO |
References | |
RS-09-119 | |
Download: ML092650232 (2) | |
Similar Documents at Quad Cities, Holtec | |
---|---|
Category:Letter type:RS
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024
[Table view]Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-094, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements2022-07-25025 July 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies 2024-08-20 Category:License-Application for Dry Cask ISFSI DKT 72 MONTHYEARML24100A7242024-01-0303 January 2024
[Table view]08. Hs A19 Proposed CoC (Compiled 2023-0313) ML22321A2772022-11-17017 November 2022 Renewed Facility License No. DPR-26 NL-22-0718, Registration of Spent Fuel Cask Use2022-09-14014 September 2022 Registration of Spent Fuel Cask Use ML22245A1062022-09-0202 September 2022 Attachment 2: Proposed Certificate of Compliance No. 1014, Appendix a, Technical Specifications for the HI-Storm 100 Cask System ML22028A3832022-01-28028 January 2022 Attachment 11: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form ML22028A3822022-01-28028 January 2022 Attachment 10: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form ML22028A3812022-01-28028 January 2022 Attachment 9: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form ML22028A3802022-01-28028 January 2022 Attachment 8: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form ML22028A3792022-01-28028 January 2022 Attachment 7: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form ML22028A3782022-01-28028 January 2022 Attachment 6: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix ML22028A3772022-01-28028 January 2022 Attachment 5: Holtec International, Appendix D Technical Specifications for the HI-Storm 100 Cask System ML22028A3762022-01-28028 January 2022 Attachment 4: Holtec International, Appendix C Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3752022-01-28028 January 2022 Attachment 3: Holtec International, Appendix B Technical Specifications for the HI-Storm 100 Cask System ML22028A3742022-01-28028 January 2022 Attachment 2: Holtec International, Appendix a Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3732022-01-28028 January 2022 Attachment 1: Holtec International, Amendment 16 Certificate of Compliance for Spent Fuel Storage Casks ML21349B4202021-12-15015 December 2021 Attachment 1: Proposed HI-STORM 100 CoC Amendment 18 (non-proprietary) ML21211A6072021-07-30030 July 2021 Attachment 3: HI-STORM 100 FSAR Proposed Revision 23 Revised Pages ML21211A6052021-07-30030 July 2021 Attachment 1: HI-STORM 100 Amendment 17 Summary of Proposed Changes ML21211A6062021-07-30030 July 2021 Attachment 2: Proposed Coc No. 72-1014 ML21118A8682021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix D, Approved Contents and Design Features for the Hi-Storm 100S Version E Cask and Hi-Trac Ms ML21113A2032021-04-23023 April 2021 Attachment 1 - Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21068A3632021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance ML21068A3972021-03-0909 March 2021 Attachment 35 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form (Non-Proprietary) ML21068A3962021-03-0909 March 2021 Attachment 34 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form (Non-Proprietary) ML21068A3952021-03-0909 March 2021 Attachment 33 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3942021-03-0909 March 2021 Attachment 32 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3932021-03-0909 March 2021 Attachment 31 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form (Non-Proprietary) ML21068A3922021-03-0909 March 2021 Attachment 30 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form (Non-Proprietary) ML21068A3912021-03-0909 March 2021 Attachment 29 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form (Non-Proprietary) ML21068A3902021-03-0909 March 2021 Attachment 28 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix (Non-Proprietary) ML21068A3892021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization ML21068A3882021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization ML21068A3872021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization ML21068A3862021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization ML21068A3852021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization ML21068A3842021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization ML21068A3832021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization ML21068A3722021-03-0909 March 2021 HI-STORM 100 FSAR Proposed Revision 21 Revised Pages ML21068A3702021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D ML21068A3692021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C ML21068A3682021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U ML21068A3672021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U ML21068A3662021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B ML21068A3622021-03-0909 March 2021 HI-STORM 100 Amendment 16 Summary of Proposed Changes ML21068A3642021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a ML20290A8242020-10-16016 October 2020 Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System LR-N19-0029, Spent Fuel Cask Registration2019-02-25025 February 2019 Spent Fuel Cask Registration BVY 18-028, Registration of Spent Fuel Cask Use2018-07-0505 July 2018 Registration of Spent Fuel Cask Use NL-18-0627, Registration of Spent Fuel Casks2018-05-15015 May 2018 Registration of Spent Fuel Casks 2024-01-03 |
Text
Exelt5m)
Exelon Generation 4300 Winfield Road wwwexeloncorp.com Nuclear Warrenville, IL 60555 10 CFR 72 .212 RS-09-119 September 22, 2009 ATTN : Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U . S. Nuclear Regulatory Commission Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53
Subject:
Registration of Use of Casks to Store Spent Fuel In accordance with 10 CFR 72.212, "Conditions of general license issued under §72.210,"
paragraph (b)(1)(ii), Exelon Generation Company, LLC (EGC) is registering, with the NRC, the use of three casks under the general license to store spent fuel at Quad Cities Nuclear Power Station (QCNPS). The initial use of these casks to store spent fuel occurred on August 24, 2009, September 2, 2009, and September 14, 2009. This registration is required to be submitted within 30 days .
The following information is provided in accordance with 10 CFR 72.212(b)(1)(ii) .
Licensee Name Exelon Generation Company, LLC Licensee Address Quad Cities Generating Station 22710 206th Avenue North Cordova, IL 61242-9740 Reactor License Number DPR-29 and DPR-30 Reactor Docket Number 50-254 and 50-265 Independent Spent Fuel Storage Installation Docket Number 72-53
September 22, 2009 U . S . Nuclear Regulatory Commission Page 2 Contact Person and Title J . L. Hansen Manager - Licensing Cask Certificate Number 1014, Amendment 3 Cask Model Number HI-STORM 100S, Version B August 24, 2009 Cask Identification Number Multi-Purpose Canister Type 68 Serial No. 262 HI-STORM 100S Serial No . 392 September 2, 2009 Cask Identification Number Multi-Purpose Canister Type 68 Serial No. 263 HI-STORM 100S Serial No. 393 September 14, 2009 Cask Identification Number Multi-Purpose Canister Type 68 Serial No. 264 HI-STORM 100S Serial No. 394 Should you have any questions, please contact Mr. John L. Schrage at (630) 657-2821 .
Respectfully, cc: NRC Regional Administrator - Region III