RS-07-167, Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and Divom Correlation

From kanterella
Jump to navigation Jump to search

Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and Divom Correlation
ML073511400
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 12/17/2007
From: Hansen J
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-07-167, TAC MC7323, TAC MC7324, TAC MC7325, TAC MC7326
Download: ML073511400 (2)


Text

Exelem,,

Lxelon Generation 4300 Winfield Road www.exeloncorp.com Nuclear Warrenville. IL 60555 RS-07-167 December 17, 2007 U . S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos . 50-254 and 50-265

Subject:

Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and DIVOM Correlation

References:

(1) Letter from Patrick R . Simpson (Exelon Generation Company, LLC), to U . S.

NRC, "Request for License Amendment Regarding Transition to Westinghouse Fuel," dated June 15, 2005 (2) Letter from Maitri Banerjee (U. S. NRC) to Christopher M. Crane (Exelon Generation Company, LLC), "Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 - Issuance of Amendments re: Transition to Westinghouse Fuel and Minimum Critical Power Ratio Safety Limits (TAC NOS. MC7323, MC7324, MC7325 and MC7326)," dated April 4, 2006 (3) Letter from Patrick R. Simpson (Exelon Generation Company, LLC), to U. S.

NRC, "Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and DIVOM Correlation," dated June 20, 2006 (4) Letter from Kenneth M. Nicely (Exelon Generation Company, LLC), to U. S .

NRC, "Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and DIVOM Correlation, " dated January 10, 2007 (5) Letter from Patrick R. Simpson (Exelon Generation Company, LLC), to U. S.

NRC, "Oscillation Power Range Monitor Instrumentation Plant Specific Scram Setpoints and DIVOM Correlation," dated July 2, 2007

U. S. Nuclear Regulatory Commission December 17, 2007 Page 2 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Renewed Facility Operating License Nos . DPR-19 and DPR-25 for Dresden Nuclear Power Station (DNPS), Units 2 and 3, and Renewed Facility Operating License Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, to support the transition to Westinghouse SVEA-96 Optima2 fuel . This request was subsequently approved by the NRC in Reference 2.

As part of the review of Reference 1, the NRC requested EGC to provide plant specific values for the Oscillation Power Range Monitor (OPRM) scram setpoints and the Delta Critical Power Ratio/Initial Critical Power Ratio Versus Oscillation Magnitude (DIVOM) correlation for the next unit cycles, when they become available. The requested values for DNPS, Unit 2 are now available and are provided below.

A DNPS, Unit 2 specific analysis was performed to determine a DIVOM curve that is applicable to Cycle 21 . The DIVOM analysis was performed using NRC approved methodologies and was based on limiting conditions during the operating cycle . The stability analysis was performed for the power/flow state point, corresponding to a post two-pump trip condition at 26% rated core flow along the licensed upper boundary of the power flow map. The limiting exposure condition was identified and utilized to bound the entire operating cycle. A limiting DIVOM curve for DNPS, Unit 2, Cycle 21, was developed. The limiting DIVOM curve is bounded by a slope of 0.44. However, a more conservative DIVOM slope of 0.45 was selected for application in the OPRM Trip Setpoint calculations .

A calculation of the OPRM Amplitude Trip Setpoints (Sp), and associated OPRM Confirmation Count Trip Setpoints (Np) , was performed. The OPRM trip setpoints are a function of the calculated DIVOM curve and the cycle specific Operating Limit Minimum Critical Power Ratio and Safety Limit Minimum Critical Power Ratio.

Based on the Cycle 21 cycle-specific parameters and the conservative DIVOM slope of 0.45, the required Sp was determined to be 1 .18. The associated NP was determined to be 18.

This letter concludes EGC's transmittal of plant specific values for the OPRM scram setpoints and DIVOM correlations as requested by the NRC for DNPS, Units 2 and 3, and QCNPS, Units 1 and 2 (References 3, 4, and 5 for 02C19, D3C20, Q1 C20, respectively) . There are no regulatory commitments contained within this letter .

Should you have any questions or require additional information, please contact Michelle Yun at 630-657-2818.