RS-04-099, Supplement to Request for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (Pit) Limits

From kanterella
Jump to navigation Jump to search
Supplement to Request for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (Pit) Limits
ML041950136
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/07/2004
From: Ainger K
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-04-099
Download: ML041950136 (24)


Text

July 7, 2004 U. S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct.

Respectfully, Executed on 7-7-05/

Kenneth A. Ainger Manager, Licensing 4 : Markup of Proposed Technical Specifications Page Changes : Retyped Pages for Technical Specifications Changes : Affidavits and Proprietary General Electric Company Reports : Non-Proprietary General Electric Company Reports cc: Regional Administrator- NRC Region IlIl Senior Resident Inspector - LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety

ExekenSM Exelon Generation www.exeloncorp.com 4300 Winfield Road Warrenville. IL 60555 RS-04-099 July 7, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374

Subject:

Supplement to Request for Amendment to Technical Specifications Section 3.4.11, `RCS Pressure and Temperature (PIT) Limits"

Reference:

Letter from K. R. gJury (Exelon Generation Company, LLC) to U. S. NRC, "Request for Amendment to Technical Specifications Section 3.4.11, 'RCS Pressure and Temperature (P/T) Limits,"' dated January 31, 2003 In the referenced letter, Exelon Generation Company, LLC (EGC) requested a license amendment to revise Technical Specifications (TS) Section 3.4.11, "RCS Pressure and Temperature (PIT) Limits," to incorporate revised PIT curves for LaSalle County Station (LCS),

Units 1 and 2. Subsequently, the vendor that performed the calculations for the PIT limits, General Electric (GE) Company, identified required changes to the proposed P/T limits and the supporting information.

Attachments 1 and 2 to this letter provide the TS markup pages incorporating the revised PIT limits for LCS. These pages replace in their entirety the TS pages provided in the referenced letter. Attachment 3 provides revised GE proprietary reports supporting the revised PIT limits.

These GE reports replace in their entirety the reports provided in the referenced letter.

Changes to the reports have been indicated by revision bars, and a summary of changes is provided on Page iii of each of the reports. Attachment 4 provides non-proprietary versions of the GE reports.

Requests for withholding this information from disclosure, in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(4), are provided in each report.

EGC has determined the enclosed information does not affect the finding of no significant hazards consideration provided in the referenced letter.

Should you have any questions concerning this submittal, please contact Mr. A. R. Haeger at (630) 657-2807.

ATTACHMENT I MARKUP OF PROPOSED TECHNICAL SPECIFICATIONS PAGE CHANGES

'. Revised TS Pages 3.4.11-3 3.4.11-6 3.4.11-7 3.4.11-8 3.4.11-9 3.4.11-10 3.4.11-11

RCS P/T Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE I FREQUENCY SR 3.4.11.1 ------- NOTE--------------------

Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.

Verify: 30 minutes

a. RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1. 3.4.11-2.

3.4.11-3 for Unit 1,-an-d--- -

Figures 3.4.11-4. 3.4.11-5. and 3.4.11-6 for Unit 2;

b. RCS heatup and cooldown rates are

< 100IF in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and

c. RCS temperature change during system leakage and hydrostatic testing is

< 200 F in any one hour period when the RCS pressure and RCS temperature ar not within the limits of Figure 3.4.11-2 for Unit 1Iand Figure 3.4.11-5 for Unit 2.

SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes Figure 3.4.11-3 for Unit la-nd Fig prior to 3.4.11-6 for Unit 2 control rod withdrawal for the purpose of achieving criticality (continued)

LaSalle 1 and 2 3.4 .11 -3 Amendment No. 147/133

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES ARE F FOR BELTLINE, 40-F FOR UPPER VESSEL, AND 47F FOR BOTTOM HEAD BELTLINE CURVES

-6 ADJUSTED AS SHOWN:

EFPY SHIFT (F)

a. 32 102 D.

0 e-fIn HEATUPICOOLDOWN RATE OF COOLANT 0 < 20OFIHR

-a U'

u) 0:

i u'

Cn

-UPPER VESSEL AND BELTUNE LIMITS HEAD .

CURVE 50 73 100 12S 150 175 200 22S 25C MUM REACTOR VESSEL METAL TEMPERA:

(F)

P-T Curves for Hydrostatic or Leak Te ting Figure 3.4.11-1 (Page 1 of 1)

/ Unit I

..Minimum Reactor Vessel Metal Temperature vs.

Reactor Vessel Pressure (Valid until December 15, 2004) I LaSalle I and 2 3.4.11 -6 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 1300 INITIAL RTndt VALUES ARE 1200 -30°F FOR BELTLINE, 40°F FOR UPPER VESSEL, AND 1100 47°F FOR BOTTOM HEAD to Cl 0 1000 BELTLINE CURVES III ADJUSTED AS SHOWN:

EFPY SHIFT (-F)

0. 900 20 114 0

C')

800

)

o 700 0 ) HEATUP/COOLDOWN RATE OF COOLANT W 600 < 20'F/HR Z

n 500 AL.

g)

UJ 400

.E 300

-UPPER VESSEL 200 AND BELTLINE LIMITS

.... BOTTOM HEAD 100 CURVE 0

0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE (eF)

Figure 3.4.11-1 (Page 1 of 1)

Unit 1 P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11-6 Amendment No.

RCS P/T Limits 3.4.11 14000 \ _ ,.' - _ /

INITIAL RTndt VALUES ARE

13. - _ . - - _ -30OF FORBELTLINE,

\409F FOR UPPER VESSEL, AND 1200 _ _ - 47F FOR BOTTOM HEAD 1100 - - - - - - - BELTLINE CURVES cm ADJUSTED AS SHOWN:

0.

G EFPY SHIFT ('F) low0 -- T----- 32 10

[. 900 0

II-co 0)

W 900 HEATUP/COOLDOWN 0: RATE OF COOLANT c 1009FIHR o 700 Ul lY600 z(3 S III W

1:SO U) gC C

.__ _AND BELTLINE

- - - - - - - - - - -LIM ITS

_ BOTTOM HEAD

/ I - . - CURVE 68T FLANGE REGION 100 72F _

0 . 7-,- , -

0 25 75 100 125 150 175 200 222S4075 MINIM M REACTOR VESSEL METAL TEMPERATURE

( F)

P-T Curve for Heatup by Non-Nuclear Means, Cooldo n Following A uclear Shutdown and Low Power Physics Tes ing Figure 3.4.11-2 (Page 1 of 1)

Unit 1 Minimum Reactor Vessel Metal Temperature vs.

eactor Vessel Pressure (Valid until December 15, 2004 LaSalle I and 2 3.4. 11-7 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 r-1300 1200 INITIAL RTndt VALUES ARE

-30@F FOR BELTLINE.

40'F FOR UPPER VESSEL, 1100 AND 61.6°F FOR BOTTOM HEAD in or I-BELTLINE CURVES ADJUSTED AS SHOWN:

CL EFPY SHIFT (F) 20 114 Uja800 I-I~

HEATUPICOOLDOWN En RATE OF COOLANT a 600 z < 100IF/HR U

LU 500 vg 400 300

-UPPER VESSEL 200 AND BELTLINE LIMITS 100 BOTTOM HEAD .

CURVE 0

0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(@F)

Figure 3.4.11-2 (Page 1 of 1)

Unit 1 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11- 7 Amendment No.

RCS P/T Limits 3.4.11 1400 0INITIAL RTndt VALUES ARE 1300 -309F FOR BELTLINE, 40'F FOR UPPER VESSEL, AND 1200 47F FOR BOTTOM HEAD CQ 1100 NE, __ - /_ BELTLINE CURVE ADJUSTED AS SHOWN:

o 1000 EFPY SHIFT (-F) 32 102

x IL 900
0) 800 U HEATUPICOOLDOWN RATE OF COOLANT
c. 1000FIHR o 700 CIiclt I z
600 A I t=

, 500 . ,AX UO 400 30) 0.

300 BELTLINE AND NON-BELTLINE 200 cMinimum / If _I LIMITS Teper It '\ I 100 n

IA ) ,-_I.

0 5 50 75 100 125 150 175 200 225 250 75 300 NIMUM REACTOR VESSEL METAL TEMPERATUR (F)

P-T Curves for Operation with a Core Cr'tical other than Low Power Physics Testin Figure 3.4.11-3 (Page 1 of 1)

Unit 1

.Minimum Reactor Vessel Metal Temperature vs.

Reactor Vessel Pressure (Valid until December 15, 2bO4) I LaSalle I and 2 3.4.1 1-8 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 1300 I I I I I I1 -30'F FOR BELTLINE, 40'F FOR UPPER VESSEL, 1200 AND 47'F FOR BOTTOM HEAD 1100 cm 0)

BELTLINE CURVE

- 1000 s ADJUSTED AS SHOWN:

il w EFPY SHIFT ('F)

c. 900 20 114 0

I-j

-o Vn 800 HEATUPICOOLDOWN U) w RATE OF COOLANT

< 100'F/HR o 700 0

ml i 600 Z

2 L-i 500 w

a:

CO 400 Lu I i_I 0.

300 200

-BELTLINE AND NON-BELTLINE 100 I _ Minimum Criticality LIMITS

/ > _Temperature 72@F 0

0 25 50 75 100 125 150 175 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)

Figure 3.4.11-3 (Page 1 of 1)

Unit 1 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11-8 Amendment No.

.RCS P/T Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 52F FOR BELTLINE.

1300 40F FOR UPPER VESSEI

. AND h200 BELTLINE CURVES 1100 ADJUSTED AS SHOWN EFPY SHIFT (OF) 32 23 0s 1000 w

x

-J HEATUPICOOLDOWN IL 300 RATE OF COOLANT f 20FIHR o

w goo kw s0 700 U-Go w - UPPER VESSEL AND BELTLINE LIMITS 300

'BOTTOM HEAD CURVE 200 100 0

75 100 123 IS0 173 200 213 250 275 REACTOR VESSEL METAL TEMPERATURE ('I P-T Curves for Hydrostatic or Leak Tes ng Figure 3.4.11-4 (Page 1 of 1)

/ Unit 2 Minimum Reactor Vessel Metal Temperature vs.

Reactor Vessel Pressure (Valid until December 15, 2004) I LaSalle I and 2 3.4. 11 -9 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 1300 INITIAL RTndt VALUES ARE 1200 52OF FOR BELTLINE, 40'F FOR UPPER VESSEL, AND 1100 49F FOR BOTTOM HEAD la cw BELTLINE CURVES ADJUSTED AS SHOWN:

III EFPY SHIFT ('F)

L. 900 0 0 20 25

-j w

ax 0 800 6000 w

X o

I.-

700 HEATUP/COOLDOWN RATE OF COOLANT W- 600 < 20'F/HR Z

tz w

0.

300

-LUPPER VESSEL 200 AND BELTLINE LIMITS BOTTOM HEAD -

100 CURVE 0

0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)

Figure 3.4.11-4 (Page 1 of 1)

Unit 2 P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11- 9 Amendment No.

RCS P/T Limits 3.4.11 la A

a.

o 0

En 0j 0

all al w6 W.

Is so 7S 100 its 1SO 11S 200 22m 230 27S

/MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)

Curves for Heatup by Non-Nuclear Means, Coo dJown Following

. A Nuclear Shutdown and Low Power Physics sting Figure 3.4.11-5 (Page 1 of 1)

Unit 2 Minimum Reactor Vessel Metal Temperature vs.

0 Reactor Vessel Pressure (Valid until December 15, 2004) I LaSalle I and 2 3.4 .11-10 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 1300 1200 INITIAL RTndt VALUES ARE 52°F FOR BELTLINE, 40'F FOR UPPER VESSEL, 1100 AND Si 58.6'F FOR BOTTOM HEAD CD D 1000

<: BELTLINE CURVES ADJUSTED AS SHOWN:

0L 900 EFPY SHIFT (OF)

R 20 25 I-

-J

0) 800 o 700 I.-

C, HEATUP/COOLDOWN RATE OF COOLANT I= 600 w < IF00/HR 2

_ 500 I=l V) 400 c

300

-UPPER VESSEL 200 AND BELTLINE LIMITS 100 -.-.- BOTTOM HEAD CURVE 0

0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(.F)

Figure 3.4.11-5 (Page 1 of 1)

Unit 2 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11-10 Amendment No.

RCS P/T Limits 3.4.11 1400 1300 I'\ I I I I1 HI m INITIAL RTndl VALUES ARE 52'F FOR BELTLINE, 40'F FOR UPPER VESSEL.

AND 1200 49'F FOR BOTTOM HEAD a.

cl) 1100 1fi000

-X I. ZI. BELTLINE CURVE ADJUSTED AS SHOWN EFPY SHIFT (7F) 32 23 3::

t. 900 o

I.-

0.1 0 IU HEATUPICOOLDOWN RATE OF COOLANT o 700 100'FIHR U

CZ 500 z

=E SOo It Vn 400 Cn 0.

300

- BELTLINE AND NON-BELTLINE 200 LIMITS CrialTy /

100

.\

Temgp~e rsi e _ / _\

I I n

0 so 75 100 12S ISO 17S 200 225 2s0 75 300 NIMUM REACTOR VESSEL METAL TEMPERATURE F)

P-T Curves for Operation with a Co e Critical other than Low Power Physics T ting Figure 3.4.11-6 (Page 1 of 1)

Unit 2 0 Minimum Reactor Vessel Metal Temperature vs.

Reactor Vessel Pressure (Valid until December 15, 2004) I LaSalle 1 and 2 3.4. 11-11 Amendment No. 156/142

RCS P/T Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 1300 *52F FOR BELTLINE, 40*F FOR UPPER VESSEL, 1200 AND 49-F FOR BOTTOM HEAD 1100 cn la.

-. 1000 BELTLINE CURVE ADJUSTED AS SHOWN:

0to EFPY SHIFT (OF) tL 900 20 25 0

I-Mu Cn 800 Cn HEATUPICOOLDOWN RATE OF COOLANT

< 100IF/HR o 700 I

Z 600 I I-

> 500 tr a

U) 400 us a:

300 200

-BELTLINE AND NON-BELTLINE 100 I- _ Minimum Criticality LIMITS

_ Temperature 86'F I I I 0

0 25 50 75 100 125 150 175 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)

Figure 3.4.11-6 (Page 1 of 1)

Unit 2 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11- 11 Amendment No.

ATTACHMENT 2 RETYPED PAGES FOR TECHNICAL SPECIFICATIONS CHANGES Retyped TS Pages 3.4.11-3 3.4.11-6 3.4.11-7 3.4.11-8 3.4.11-9 3.4.11-10 3.4.11-11

RCS P/T Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4

SR 3.4.11.1 ------------------- NOTE--------------------

Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.

Veri fy: 30 minutes

a. RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1, 3.4.11-2, 3.4.11-3 for Unit 1 up to 20 EFPY, and I Figures 3.4.11-4, 3.4.11-5, and 3.4.11-6 for Unit 2 up to 20 EFPY; I
b. RCS heatup and cooldown rates are
  • 1000F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and
c. RCS temperature change during system leakage and hydrostatic testing is s 200F in any one hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2 for Unit 1 up to 20 EFPY and Figure 3.4.11-5 for Unit 2 up to 20 EFPY.

SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes Figure 3.4.11-3 for Unit 1 up to 20 EFPY prior to and Figure 3.4.11-6 for Unit 2 up to 20 control rod EFPY. withdrawal for the purpose of achieving criticality (continued)

LaSalle 1 and 2 3.4.11-3 Amendment No.

RCS P/T Limits 3.4.11 130 INITIAL RTndt VALUES ARE 12Wi -30'F FOR BELTLINE.

40'F FOR UPPER VESSEL, AND 47'F FOR BOTTOM HEAD en I- BELTLINE CURVES

-l LIE ADJUSTED AS SHOWN:

EFPY SHIFT (F) o 900 20 114 (n B HEATUP/COOLDOWN RATE OF COOLANT

< 20*FIHR zw

, o00 0

300

-UPPER VESSEL 2: AND BELTLINE LIMITS


BOTTOM HEAD 100 CURVE 0 25 50 75 100 125 150 175 2 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(.F)

Figure 3.4.11-1 (Page 1 of 1)

Unit 1 P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle 1 and 2 3.4.11-6 Amendment No.

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES ARE

-30*F FOR BELTLINE, 40F FOR UPPER VESSEL, 1100 AND 47F FOR BOTTOM HEAD M ow ct1000 BELTLINE CURVES

a. ADJUSTED AS SHOWN:

EFPY SHIFT ('F) 0 20 114 cIx o 700

-J HEATUPICOOLDOWN (nE00 RATE OF COOLANT z c 100FIHR ow W 300 w

C,,

U) w3S a.

-UPPER VESSEL AND BELTLINE LIMITS

---.-- BOTTOM HEAD 100 CURVE 0

0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(.F)

Figure 3.4.11-2 (Page 1 of 1)

Unit 1 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low.Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4.11- 7 Amendment No.

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES ARE F FOR BELTLINE, l 1SXI Ii 40'F FOR UPPER VESSEL, AND 47F FOR BOTTOM HEAD 1100 BELTLINE CURVE 0 1000 ADJUSTED AS SHOWN:

EFPY SHIFT ('F)

I 20 114 ax HEATUP/COOLDOWN RATE OF COOLANT

~~321 1PS11IG 100FIHR R

o 700 I_ I <

w en O U)'

W 0.3 500 U)

_ - - E- - Miiurtclt

- BELTLINE AND NON-BELTLINE 100 LIMITS TeprtrI72_

0 0 5 r50 75 100 125 ISO 175 20 225 2 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(*F)

Figure 3.4.11-3 (Page 1 of 1)

Unit 1

.P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4.11-8 Amendment No.

RCS P/T Limits 3.4.11

.400 300 INITIAL RTndt VALUES ARE 1200 52F FOR BELTLINE.

40'F FOR UPPER VESSEL, AND 1100 49F FOR BOTTOM HEAD in 0

10X BELTLINE CURVES ADJUSTED AS SHOWN:

0 EFPY SHIFT (OF) a I- 9X 20 25

-J It' SWo U) 7X HEATUPICOOLDOWN U' RATE OF COOLANT

< 20'F/HR It U'

a-400 4X 300

-UPPER VESSEL 20 AND BELTLINE LIMITS


BOTTOM HEAD 100 CURVE 0

a 2S s0 7 100 12s 1m0 175 2 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)

Figure 3.4.11-4 (Page 1 of 1)

Unit 2 P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle 1 and 2 3.4 .11 -9 Amendment No.

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES ARE 52-F FOR BELTLINE, 40F FOR UPPER VESSEL, 1100 AND 49-F FOR BOTTOM HEAD la oI G

BELTLINE CURVES ADJUSTED AS SHOWN:

CL 900 EFPY SHIFT (F) 0.

20 25 0:

HEATUPICOOLDOWN RATE OF COOLANT Z- < 100*FIHR C:

9w c 5Cn wn (0

(0

- UPPER VESSEL AND BELTLINE LIMITS BOTTOM HEAD .

CURVE 0

0 :5 o0 75 100 12 150 175 20 MINIMUM REACTOR VESSEL METAL TEMPERATURE

("F)

Figure 3.4.11-5 (Page 1 of 1)

Unit 2 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4 .11-10 Amendment No.

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES ARE 52-F FOR BELTLINE, 400 F FOR UPPER VESSEL.

AND 49@F FOR BOTTOM HEAD I1w BELTLINE CURVE ox ADJUSTED AS SHOWN:

g a- EFPY SHIFT (F) 20 25

-I0 Ij L 9X axl HEATUP/COOLDOWN RATE OF COOLANT

< 100F/HR o 7W a 0 n

I-

,i w SOD U,

U) ,,

U) a.

-BELTLINE AND NON-BELTLINE 100 LIMITS 0

o 25 90 75 1W 125 SW 175 W 29 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(.F)

Figure 3.4.11-6 (Page 1 of 1)

Unit 2 .

P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 1 1- 1 1 Amendment No.