MONTHYEARML16167A4462016-09-0606 September 2016
[Table View]MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted Project stage: Other ML16167A4612016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Figures Part 2 of 2 - Redacted Project stage: Other ML16167A4632016-09-0606 September 2016 UFSAR, Rev 22, Chap 06 Eng Safety Features - Redacted Project stage: Acceptance Review ML16167A4742016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 2 of 14 - Redacted Project stage: Other ML16167A4802016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 3 of 14 - Redacted Project stage: Other ML16167A4832016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 5 of 14 Redacted Project stage: Other ML16167A5282016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Appendices - Redacted Project stage: Acceptance Review ML16167A5012016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 11 of 14 - Redacted Project stage: Other ML16167A4852016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 7 of 14 - Redacted Project stage: Other ML16167A4722016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Auxiliary Systems - Redacted Project stage: Acceptance Review ML16167A5242016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 14 of 14 - Redacted Project stage: Other ML16167A5002016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 10 of 14 Redacted Project stage: Other ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted Project stage: Other ML16167A5232016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 13 of 14 - Redacted Project stage: Other ML16167A4502016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Site Characteristics Redacted Project stage: Other ML16167A5262016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 12 Radiation Protection - Redacted Project stage: Other ML16167A4702016-09-0606 September 2016 Units 1 and 2, MF7633 & MF7634, UFSAR, Rev 22, Chap 08 Electric Power - Redacted Project stage: Acceptance Review 2016-09-06 |
ML16167A523 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 09/06/2016 |
From: | Plant Licensing Branch III |
To: | Exelon Generation Co |
Vaidya B | |
References | |
TAC MF7633, TAC MF7634 | |
Download: ML16167A523 (3) | |
Similar Documents at LaSalle | |
---|---|
Category:Drawing
MONTHYEARML22146A3732022-04-13013 April 2022
[Table view]5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 2 of 7 (ML22111A240 Redacted) ML22146A3742022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 3 of 7 (ML22111A241 Redacted) ML22146A3762022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 4 of 7 (ML22111A242 Redacted) RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML22146A3782022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 6 of 7 (ML22111A244 Redacted) ML22146A3792022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 7 of 7 (ML22111A245 Redacted) ML22111A2392022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 RS-21-034, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair2021-03-0707 March 2021 Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair RA20-016, Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan2020-03-24024 March 2020 Corrected Drawing for One-Line Electrical Power Supply for Containment Vent System Final Integrated Plan ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) RS-18-037, Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 152018-05-0909 May 2018 Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 Through 15 ML18130A7522018-05-0909 May 2018 Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figure 1, FLEX Hose Deployment ML16167A5232016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 13 of 14 - Redacted ML16167A4612016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Figures Part 2 of 2 - Redacted ML16167A4842016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 6 of 14 - Redacted ML16167A4562016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 02 Figures Part 1 of 2 - Redacted ML16167A5012016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 11 of 14 - Redacted ML16167A4852016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 7 of 14 - Redacted ML16167A4992016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 9 of 14 - Redacted ML16167A5242016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 14 of 14 - Redacted ML16167A5002016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 10 of 14 Redacted ML16167A4822016-09-0606 September 2016 MF7633 & MF7634, UFSAR, Rev 22, Chap 09 Figures Part 4 of 14 - Redacted ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML13282A3482013-10-0404 October 2013 County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H RS-13-151, LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H2013-10-0404 October 2013 LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H ML12269A0712012-09-17017 September 2012 Attachment 8 - Aerial Photographs from Www.Bing.Com/Maps and Site Layout Drawings (I.E., Figures 4A-4E), Site Layout Drawings 1 E-0-4900A, 1 E-0-4900B, and S-1 561, Revision B ML1003213712010-01-27027 January 2010 Attachment 14 - Mechanical Drawings for Leading Edge Flowmeter Installation 2022-04-13 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24108A1562024-04-15015 April 2024
[Table view]Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML22111A2462022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2532022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2302022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2342022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2392022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML22146A3812022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (ML22111A249 Redacted) ML22146A3792022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 7 of 7 (ML22111A245 Redacted) ML22146A3802022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (ML22111A248 Redacted) ML22146A3822022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Appendices (ML22111A254 Redacted) ML22111A2362022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22111A2502022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2472022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2282022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Letter and Attachments A-F ML22111A2522022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2512022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22111A2322022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2332022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22111A2292022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, List of Effective Pages ML22146A3682022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (ML22111A235 Redacted) ML22146A3782022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 6 of 7 (ML22111A244 Redacted) ML22146A3702022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System (ML22111A238 Redacted) ML22146A3692022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (ML22111A237 Redacted) ML22146A3732022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 2 of 7 (ML22111A240 Redacted) ML22146A3762022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 4 of 7 (ML22111A242 Redacted) ML22146A3742022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 3 of 7 (ML22111A241 Redacted) ML20153A7922020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 009 Chap 09 Auxiliary Systems-ML20111A256 Redacted ML20153A8182020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 015 Chap 09 Figures Part 6 of 7-ML20111A262-Redacted ML20153A8152020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 014 Chap 09 Figures Part 5 of 7-ML20111A261-Redacted ML20153A8122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 013 Chap 09 Figures Part 4 of 7-ML20111A260-Redacted ML20153A8212020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 016 Chap 09 Figures Part 7 of 7-ML20111A263-Redacted ML20153A7992020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 011 Chap 09 Figures Part 2 of 7-ML20111A258-Redacted ML20154K6122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of Usfar Rev 24 and FPR Rev 9 - 020 Chap 13 Conduct of Operations-ML20111A267-Redacted ML20154K6082020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 019 Chap 12 Radiation Protection-ML20111A266-BKV-Redacted ML20150A2592020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 008 Chap 08 Electric Power-ML20111A255_Redacted ML20147A6712020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 Appendices (Amended)-ML20133J880_Redacted ML20147A6762020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 LAS FRP Rev_9 ML 20111A273-Redacted ML20150A2562020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted ML20153A8102020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 012 Chap 09 Figures Part 3 of 7-ML20111A259-Redacted ML20111A2482020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20111A2512020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20111A2572020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML20111A2692020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20111A2652020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20111A2462020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Table of Contents ML20111A2502020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems ML20111A2452020-04-13013 April 2020 Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 9 to Fire Protection Report ML20111A2682020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20111A2702020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications 2024-04-15 |
Text
LaSalle UNITS 1 AND 2 UFSAR, REVISION 22 AND FIRE PROTECTION REPORT (FPR), REVISION 7 THE SECURITY SENSITIVE INFORMATION HAS BEEN REDACTED FROM THE ORIGINAL DOCUMENT.
THIS DOCUMENT PROVIDES THE REDACTED VERSION.
THE REDACTED INFORMATION WITHIN THIS DOCUMENT IS INDICATED BY SOLID BLACKEDOUT REGIONS.
REV. 17 APRIL 2008
~v ~o 0'17 *lHS
- *
- Q LA SAL*~E COUNTY STATION
. UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.S-1 FIRE PROTECTION SYSTEM
( SHEET 40 OF41 I EL. 677'-0'1
REV. 17
~17.:10 117133HS
.9 4
- APRIL 2008 F
F E
S E o
o c
c B
B A LA SAllE COUNTY STATION
-A UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.5 -1 FIRE PROTECTION ,SYSTEM EL.674'-0*
(SHEET41 OF41 ) EL. 690'-0' a
EL. 710"*6" 7 6 5 3 2