ML100321371

From kanterella
Jump to navigation Jump to search
Attachment 14 - Mechanical Drawings for Leading Edge Flowmeter Installation
ML100321371
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/27/2010
From:
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
Shared Package
ML100321303 List:
References
RS-10-001
Download: ML100321371 (2)


Text

ATTACHMENT 14 Mechanical Drawings for Leading Edge Flowmeter Installation LIST OF DRAWINGS INCLUDED M-802, Sheet 2, Rev. V, Feedwater Piping System (LSCS, Unit 1)

8 7 6 5 4 3 2 Z 'lHS Z08-V'l


+--rl~

F F

v (FOR FLUSHING PURPOSES) 24" -1500# W.N.

FLANGE TYP.

" - - - - FOR CONT. SEE DWe E M-S66 SHT. 71:>

FLOW STRAIGHTENER (INSIDE 24" NPS PIPE) o 24" SCH 160 PIPE (APPROX. 19'-2¥" LG)

---I-----I~ R c c 1" PLUG CONN.

lYP, (2)

CHORDAL SPOOL PIECE (CALDON)

SEC.T ION "21-2'-

B B 24" SCH 160 PIPE (APPROX. 5'-8¥" LG)

(EXISTING)

¥.' -6000 LB 2 PLS (PRESSURE CONN.)

(EXISTING) ~----~....

SECTION DETAIL B (lYPICAL 2 PLACES)

SCALE: lit' = 1'-0

BCtFO;;;R:;R£:COR1l:::PER~~~C3SJ<<8~RlPll~ON~.===4!!~~ngr----------------I A A

FEEDWATER PIPING SYSTEM LEFM

1. SEE CAMERON OWG'S 300C096 SHEETS 1 THRU 5 FOR CHORDAL SPOOL PIECE DETAILS
2. SEE DWG 131 C7599 SHEET 1 FOR REFERENCE DETAILS 8 7 5 4 3