RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations
From kanterella
(Redirected from RA-23-0300)
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
EPID:L-2024-LLR-0017, 2024 Rpn - CGD Inspection Information Request (Open) | |
Initiation Administration Results
Other: RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations | |
MONTHYEARRA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024
[Table View]Fifth Ten-Year Inservice Inspection Interval Limited Examinations Project stage: Other ML24047A0162024-02-15015 February 2024 2024 Rpn - CGD Inspection Information Request Project stage: Request ML24079A3062024-03-19019 March 2024 NRR E-mail Capture - Acceptance Review Results for Robinson - Proposed Relief Request RA-23-0300 Project stage: Acceptance Review ML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson Project stage: RAI 2024-03-19 |
ML24050A006 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 02/15/2024 |
From: | Ellis K Duke Energy Progress |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24050A005 | List: |
References | |
RA-23-0300 | |
Download: ML24050A006 (1) | |
Similar Documents at Robinson | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024
[Table view]Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-20-0329, Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers2021-09-0707 September 2021 Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report2021-05-26026 May 2021 Refueling Outage 32 Steam Generator Tube Inspection Report RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report2021-03-0808 March 2021 Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections2019-07-23023 July 2019 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head2019-07-10010 July 2019 Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval2019-02-20020 February 2019 Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report2015-09-17017 September 2015 Submittal of Ninety-Day Inservice Inspection Summary Report RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement2015-07-0808 July 2015 Submittal of Ninety Day Inservice Inspection Summary Report - Supplement RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program2014-05-29029 May 2014 Submittal of Snubber Examination and Testing Program RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i)2014-05-0909 May 2014 Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report2014-01-30030 January 2014 Submittal of Ninety Day Inservice Inspection Summary Report RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program...2012-11-11011 November 2012 Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval2012-06-19019 June 2012 Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report2012-06-15015 June 2012 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-06-0404 June 2012 Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-05-10010 May 2012 Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval2012-03-16016 March 2012 Inservice Testing Program Plan for the Fifth-Ten Year Interval RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval2012-03-14014 March 2012 Inservice Inspection Program for the Fifth Ten-Year Interval ML1103300852011-01-27027 January 2011 H. B. Robinson, Unit 2 - Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xi, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23) RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report2010-09-22022 September 2010 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 252009-02-11011 February 2009 Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results2008-04-30030 April 2008 Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report2007-08-0202 August 2007 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report2006-01-16016 January 2006 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report2004-08-26026 August 2004 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements2003-04-15015 April 2003 Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report2003-02-11011 February 2003 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program2002-05-14014 May 2002 Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program ML0205703112002-02-20020 February 2002 Revision 1 to Inservice Testing Program Plan - Fourth Interval. 2024-02-15 Category:Letter type:RA MONTHYEARRA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-07-26026 July 2024
[Table view]Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0099, Reactor and Senior Reactor Operator Initial Examination Outlines2024-04-10010 April 2024 Reactor and Senior Reactor Operator Initial Examination Outlines RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0080, Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports2024-03-28028 March 2024 Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024 Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations2023-03-30030 March 2023 Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 22023-03-24024 March 2023 Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0027, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20222023-01-30030 January 2023 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022 RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0347, Transmittal of Core Operating Limits Report2022-12-0202 December 2022 Transmittal of Core Operating Limits Report 2024-07-26 |