RA-19-0378, Nuclear Regulatory Commission (NRC) Annual Commitment Change Report

From kanterella
Jump to navigation Jump to search
Nuclear Regulatory Commission (NRC) Annual Commitment Change Report
ML19282A770
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 09/19/2019
From: Teresa Ray
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-19-0378
Download: ML19282A770 (2)


Text

Thomas D. Ray, P.E.

Site Vice President J_-,DUKE McGuire Nuclear Station

~ ENERGY Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Tom .Ray@duke-energy.com RA-19-0378 September 19, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station Docket No. 50-369, 50-370 Renewed License No. NPF-9 and NPF-17 Nuclear Regulatory Commission (NRC) Annual Commitment Change Report This letter serves to document that during the 2018 calendar year, McGuire did not make any NRC commitment changes requiring NRC notification per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments."

Questions regarding this submittal should be directed to Jeff Thomas at (980) 875-4499.

Thomas D, Ray, P.E.

Site Vice President McGuire Nuclear Station www.duke-energy .com

U.S. Nuclear Regulatory Commission Document Control Desk Serial: RA-19-0378 Page 2 cc:

Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Andy Hutto, Senior Resident Inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station Michael Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mailstop 0-881A Rockville, MD 20852 www.duke-energy .com