Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000324/20190102 July 2019Biennial Problem Identification and Resolution Inspection Report 05000325/2019010 and 05000324/2019010
IR 05000324/20160049 February 2017NRC Integrated Inspection Report 05000325/2016004 and 05000324/2016004
IR 05000324/20160039 November 2016NRC Integrated Inspection Report 05000325/2016003 and 05000324/2016003 and Exercise of Enforcement Discretion
ML15175A44724 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6
ML15175A44524 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6
ML15175A43924 June 2015Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6
IR 05000324/20130054 February 2014IR 05000325-13-005, 05000324-13-005, 05000325-13-502, 05000324-13-502; 10/01/13 - 12/31/13; Brunswick Steam Electric Plant, Units 1 & 2; Operability Determinations and Post Maintenance Testing
IR 05000324/20130038 August 2013Integrated Inspection Report 05000325/13-003 and 05000324-13-003
IR 05000324/201100414 November 2011IR 05000325-11-004, 05000324-11-004; on 07/1/11 - 09/30/11; Brunswick Steam Electric Plant, Units 1 & 2; Flood Protection Measures, Maintenance Effectiveness
ML11318057414 November 2011IR 05000325-11-004, 05000324-11-004; on 07/1/11 - 09/30/11; Brunswick Steam Electric Plant, Units 1 & 2; Flood Protection Measures, Maintenance Effectiveness
ML09211025030 July 2009IR 05000325-09-003, 05000324-09-003, on 4/01/2009 - 6/30/2009, Brunswick Steam Electric Plant, Units 1 & 2; Refueling and Other Outage Activities
IR 05000324/200900827 March 2009IR 05000325-09-008, 0500324-09-008, on 01/20/2009 - 03/06/2009, Brunswick Steam Electric Plant Unit 1 and Unit 2, Special Inspection
ML1019404523 June 200810CFR50.75g File: AR00237296 Overflowed CST
IR 05000324/20080069 April 2008IR 05000325-08-006, 05000324-08-006; 02/11-15/2008, 02/25-29/2008; Brunswick Steam Electric Plant, Units 1 and 2: Biennial Baseline Inspection of the Identification and Resolution of Problems..
IR 05000324/200700723 March 2007IR 05000324-2007-007, 05000325-2007-007, on 02/05/2007 - 02/23/2007, Brunswich Steam Electric Plant
IR 05000324/19990037 June 1999Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support
IR 05000324/19980099 November 1998Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support
IR 05000324/199800711 August 1998Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000324/19980066 July 1998Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000324/199700915 September 1997Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance
ML20198P7129 July 1997Discusses OI Rept 2-96-036 Re Brunswick Steam Electric Plant Discrimination Against Engineer for Raising Technical Concerns About Equipment Qualification Practices.Also Encl, Viewgraphs Re Cpl EQ Program Reconstitution Effort
BSEP-97-0221, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-03 & 50-325/97-03.Corrective Actions:Individual Was Counseled on Importance of Using Valid Basis for Reportability Determinations30 May 1997Responds to NRC Re Violations Noted in Insp Repts 50-324/97-03 & 50-325/97-03.Corrective Actions:Individual Was Counseled on Importance of Using Valid Basis for Reportability Determinations
ML20138J5982 May 1997Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings
BSEP-95-0519, Responds to Violations Noted in Insp Repts 50-324/95-13 & 50-325/95-13.Corrective Actions:Permanent Mod Installed to Provide Isolated Power Supply to RCIC Flow Controller6 October 1995Responds to Violations Noted in Insp Repts 50-324/95-13 & 50-325/95-13.Corrective Actions:Permanent Mod Installed to Provide Isolated Power Supply to RCIC Flow Controller
ML20150G0191 July 1988Responds to Violations Noted in Insp Repts 50-324/87-22 & 50-325/87-22 on 880606-10 & Proposed Imposition of Civil Penalty.Util Contends That No Civil Penalty Should Be Levied for Equipment Qualification Violations.Supporting Info Encl
ML20151A25129 June 1988Insp Repts 50-324/88-18 & 50-325/88-18 on 880501-0604. Violations Noted.Major Areas Inspected:Previous Enforcement Matters,Maint Observation,Operational Safety Verification, LER Review & Silicon Controlled Rectifier Controllers