ML20057D083

From kanterella
Jump to navigation Jump to search
Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design
ML20057D083
Person / Time
Site: 05200002
Issue date: 09/24/1993
From: Boyce T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9310010086
Download: ML20057D083 (4)


Text

gaaeog h c642 NA.

  • t UNITED STATES ff Zi.

j NUCLEAR REGULATORY COMMISSION C

WASHINGTON, D.C. 20555-0001 3

v 4.....",

September 24, 1993 Docket No.52-002 MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B, Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Wiggins W. Bateman, EDO F. Gillespie B. D. Liaw H. Slosson S. Varga A. Thadani Operations Center J. Calvo E. Adensa C. Rossi THRU:

R. W. Borchardt, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewas Office of Nuclear Reactor Regulation FROM:

Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+

DATE AND TIME:

October 4, 1993 (10:15 a.m. - 5 p.m.)

October 5 and 6, 1993 (7:30 a.m. - 4:30 p.m.)

LOCATION:

ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 PURPOSE:

To discuss staff comments on the Tier 1 design certification material for the CE System 80+ design.

bk koo!k o$$o$002 A

PDR-1Fo3 tu

4'

- September 24,'1993 PARTICIPANTS *:

E ABB-CE E

.D. Crutchfield R. Matzie P. Lang-t C. McCracken C. Brinkman R. Jones J. Egan G. Bagchi T. Crom T. Boyce S. Ritterbusch M. Chiramal J. Rec D. Terao T. Rudek M. Franovich et al.

D. Thatcher J. Lyons M. Rubin R. Emch G. West M. Snodderly T. Polich S. Magruder M. Waterman H. Walker sY."hoyck"NohtManager Tho Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation r

sed genda j

cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1130.

DISTRIBUTION:

Docket File PDST R/F SBajwa,12G18 RBorchardt PDR TBoyce TVWambach MXFranovich PShea OPA EJordan, MNBB3701 TGody, ED0 ACRS (11)

JMoore, 15B18 JNWilson CMcCracken, BD1 RJones, 8E23 -

NRR Mailroom, 12G18 AChaffee, EAB SMagruder GBagchi, 7H15 MChiramal, 8H1 DTerao, 7H15 DThatcher, 7E4. Ayons, 8D1 MRubin, 8E23 REmch, 11E23 GWest, 10D24

.. Ti$nodderly, 801 TPolich, 10A19 MWaterman, 8H3 HWalker, 801

{Saltos,10E4 0FC:

LA:PDST:ADAR PM:PDST:ADAR SC:PD E.AR NAME: PShea g TBoyce:tzG}

JNWilson 09/[d3 09/Jf/93 09/k/93 DATE:

0FFICIAL DOCUMENT COPY:

CM1004.THB

'ABB-Combustion Engineering, Inc.

Docket No. 52-002-cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 r

Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 P

i

'6'

.m CE System 80+

ITAAC Meeting October 4-6,1993 Windsor, Connecticut Monday. October 4.1993 10:15 - 10:30 Introductions / Agenda Overview CE 10:30 - 12:00 Discussion of Significant Issues CE 12:00 - 12:30 LUNCH 12:30 - 5:00 ITAAC Task Group breakout sessions Tuesday. October 5.1993 7:30 - 11:30 Continue ITAAC Task Group breakout sessions 11:30 - 12:30 LUNCH 12:30 - 5:00 Continue ITAAC Task Group breakout sessions Wednesday. October 6.1993 7:30 - 11:30 Continue ITAAC Task Group breakout sessions 11:30 - 12:30 LUNCH 12:30 - 4:00 Continue ITAAC Task Group breakout sessions 4:00 - 4:30 Summary of Commitments P

7 Enclosure