ML20056G050

From kanterella
Jump to navigation Jump to search
Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl
ML20056G050
Person / Time
Site: 05200002
Issue date: 08/25/1993
From: Mike Franovich
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9309010221
Download: ML20056G050 (4)


Text

.,

,m.

ff C6ef fYx i N, ,ht UNITED STATES j 'Efl j NUCLEAR REGULATORY COMMISSION WASHINGTON, D C. 20555 0001

],4 j f s' ..... 'g August 25. 1993 Docket No.52-002 MEMORANDUM FOR
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger r W. Russell J. Zwolinski C. Thomas -

J. Partlow M. Virgilio F. Congel ,

D. Crutchfield B. Grimes E. Butcher r W. Travers J. Wiggins W. Bateman, ED  !

A. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo E. Adensam C. Rossi THRU: R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors  :

and License Renewal Office of Nuclear Reactor Regulation FROM: Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION '

ENGINEERING (ABB-CE) FOR SYSTEM 80+ (PROBABILISTIC RISK ASSESSMENT (PRA) ISSUES)

DATE AND TIME: September 2, 1993 (B a.m. - 5 p.m.)

LOCATION: ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 PURPOSE: To discuss progress on issue closure for PRA (e.g., shutdown risk and seismic margin). To discuss PRA insights and Tier I and 2 information. A proposed agenda is enclosed.

9309010221 730825 PDR ADDCK 05200002

~"

gg R@ CEt50 i OPfp l

August 25, 1993 PARTICIPANTS *: NRC ABB-CE M. Franovich S. Ritterbusch N. Saltos R. Weston A. El-Bassioni E. Siegman R. Palla D. Finnicum (Original signed by)

Michael X. Franovich, Project Manager '

Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Offlce of Nuclear Reactor Regulation

Enclosure:

Proposed Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are oper. for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1121.

DISTRIBUTION:

Docket File PDST R/F SBajwa, 12G18 RBorchardt PDR TEssig TVWambach MXFranovich PShea OPA EJordan, MNBB3701 TGody, EDO ACRS (11) JMoore, 15B18 AEl-Bassioni,10E4 NSal tos, 10E4 NRR Mailroom,12G18 AChaffee, EAB SMagruder MPratt, 7E4 GZech, RPEB MSnodderly, 8D1 JKudrick, BD1 RPall a, 10E4 0FC: LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR NAME: PSh p MXFr $$v}ich:tz TEssig

(

DATE: 08h p3 08//f/93 08/d/93 0FFICIAL DOCUMENT COPY: CM0901.MXF

. r

. ABB-Combustion Engineering, Inc. Docket No.52-002 f

cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing  !

ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road  ;

Windsor, Connecticut 06095-0500 i t

Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.  !

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 ,

Mr. Stan Ritterbusch  !

Nuclear Systems Licensing  :

ABB-Combustion Engineering, Inc.  !

1000 Prospect Hill Road Post Office Box 500 '

Windsor, Connecticut 06095-0500 l Mr. Sterling Franks U.S. Department of Energy l NE-42 i Washington, D.C. 20585 ,

Mr. Steve Goldberg .

Budget Examiner  !

725 17th Street, N.W. ,

Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.  ;

Suite 300 Washington, D.C. 20006 i l

Joseph R. Egan, Esquire l Shaw, Pittman, Potts & Trowbridge  ;

2300 N Street, N.W.

Washington, D.C. 20037-1128 i Mr. Regis A. Matzie, Vice President l Nuclear Systems Development i ABB-Combustion Engineering, Inc.

. 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 l

CE System 80+

PRA Meeting  !

September 2 ,1993 l Windsor, Connecticut  ;

l Thursday. September 2.1993 l

8:00 - 8:15 Introductions / Agenda Overview i

8:15 - 12:00 Discussion of DSER Open Issues and Related Follow-on Questions  :

- Ievel 1 Internal Events

- Internal Fires, Flood l

- Iow Power Operations and Shutdown Risk j

- Seismic Margins Assessment  ;

12:00 Lunch -

i 1:00 - 3:00 Continue DSER Open Items Discussions

- Ixvel 2 & 3 Items 1

- SAMDAs  ;

- PRA Aspects of SGTR Containment Bypass  !

i 3:00 - 4:30 PRA Insights & Assumptions / Tier 1 & Tier 2 Roadmaps  !

4:30 - 5:00 Summary of Commitments l

l

\

1 Enclosure

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _