ML20059K805

From kanterella
Jump to navigation Jump to search
Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl
ML20059K805
Person / Time
Site: 05200002
Issue date: 01/28/1994
From: Stewart Magruder
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
Office of Nuclear Reactor Regulation
References
NUDOCS 9402020275
Download: ML20059K805 (4)


Text

_

  1. o g UNITED STATES g NUCLEAR REGULATORY COMMISSION

[ E WASHINGTON, D C,20555 5

% / Sanuary 28, 1994 Docket No.52-002 MEMORANDUM FOR: T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger i W. Russell J. Zwolinski C. Thomas J. Callan E. Adensam F. Congel  ;

D. Crutchfield B. Grimes E. Butcher W. Travers W. Hodges W. Bateman, EDO F. Gillespie B. D. Liaw J. Caldwell S. Varga A. Thadani Operations Center ,

J. Calvo M. Virgilio C. Rossi THRU: R. W. Borchardt, Director Standardization Project Dir&6torate Associate Directorate for Advanced Reactors-and License Renewal Office of Nuclear Reactor Regulation FROM: Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTIO4 ENGINEERING (ABB-CE) FOR SYSTEM 80+ (STRUCTURAL /GE0 TECHNICAL ISSUES REVIEW / AUDIT)

DATE AND TIME: January 31, 1994 (8:30 a.m. - 5 p.m.) l February 1, 1994 (8:30 a.m. - 5 p.m.) <

LOCATION: ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway Suite 330 Rockville, Maryland 20582 PURPOSE: Meeting to review and resolve remaining structural / ,

geotechnical design issues for ABB-CE System 80+, )

and to conduct an audit of non-nuclear island analysis I and design calculations. An agenda is enclosed. ,

I C100iul 50YU.E((f[gg- l p2on53 3Eaj*g2-Lho - I

~

- ~ ~ N g Eder S. Dermitzaltis (VECTRA)

S. Esfendiari (VECTRA)

G. Tilton (SMEC)

J. Pierro (SWEC)

B. Lawton (SWEC)

@MDD Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Fac.u 31 Reaister 28058, 6/28/78. Members of the public who wish to atted s'tould contact me at (301) 504-3139.

DISTRIBUTION:

Docket File PDST R/F MCullingford, 12E18 PDR R80rchardt RArchitzel JNWilson TVWambach MXFranovich SMagruder PShea OPA EJordan, MNBB 3701 WDean, EDO JMoore, 15B18 GBagchi, 7H15 ACRS (11) (w/o encl) TCheng, 7H15 SAli, 7H15 NRR Mailrm, 12G18 0FC: LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR

,a NAME:

PShea g j SMagruder:tY RArchibel DATE:

01/3)94 01/ W/94 01/20/94 0FFICIAL DOCUMENT COPY: CMTG0131.SLh

T l 1

l l

January 28, 1994

/

PARTICIPANTS *: NRR ABB-CE

.j G. Bagchi L. Gerdes )

S. Ritterbusch S. Ali T. Cheng T. Oswald (DE&S)

S. Magruder S. Dermitzakis (VECTRA) 4' S. Esfendiari (VECTRA)

G. Tilton (SWEC)

J. Pierro (SWEC)

8. Lawton (SWEC)

@M M %

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal 4 Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-3139.

J DISTRIBUTION:

Docket File PDST R/F MCullingford, 12E18 RBorchardt PDR RArchitzel JNWilson TVWambach MXFranovich SMagruder PShea EJordan, MNBB 3701 OPA WDean, ED0 ACRS (11) (w/o encl) TCheng, 7H15 JMoore, 15B18 GBagchi, 7H15 SAli, 7H15 NRR Mailrm,12G18 0FC: LA:PDST:ADAR !I PM:PDST:ADAR SC:PDST:ADAR A

NAME: PShea g j SMagruder:D RArchithel DATE: 01/g)94 01/ R/94 01/.20/94 0FFICIAL DOCUMENT COPY: CMTG0131.SLM

ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development  !

ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 .

Windsor, Connecticut 06095-0500 l Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850 i

I 1

~

t ABB-CE SYSTEM 80+

STRUCTURAL OPEN ISSUES AND AUDIT MEETING January 31, 1994 - February 1, 1994 AGENDA January 31. 1994 8:30 a.m. Introductions and General Discussion 8:45 a.m. Structural Sliding Results/ Evaluations 10:00 a.m. Non-Nuclear Island Issues 11:30 a.m. Lunch 12:30 p.m. Technical Evaluation Results ",

- Incoherent Ground Motion

- Target PSDs 12:30 p.m.* Audit of Non-Nuclear Island Analysis and Design-Calculations 1:30 p.m. Nuclear Island and Other Issues  !

(Ref. minutes from 12/14/93 meeting) 5:00 p.m. Adjourn >

February 1. 1994  !

8:30 a.m. Nuclear Island Calculation Review 8:30 a.m.* Audit of Non-Nuclear Island Analysis and Design Calculations (Continued) 10:30 a.m. Comments on CESSAR-DC Appendices 3.8A & 3.88 Confirmation of FSER Issues Validation of Plant Level HCLPF Site-Specific Spectra 12:00 p.m. Lunch 1:00 p.m. 3..tinued Discussions (As Required)

  • Audit will conducted in a separate room Enclosure

.- . . _ - , -