ML20059K177

From kanterella
Jump to navigation Jump to search
Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design
ML20059K177
Person / Time
Site: 05200002
Issue date: 01/26/1994
From: Wambach T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9402010391
Download: ML20059K177 (4)


Text

.

gn MCgsg

/ t UfJITED STATES j NUCLEAR REGULATORY COMMISSION

  • k,}?3[}

g [

/

t WASHINGTON, D.C. 20505-0001

      • ++ January 26, 1994 Docket No.52-002 '

j, - ,

MEMORANDUM FOR: T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger -

W. Russell J. Zwolinski C. Thomas J. Callan E. Adensam F. Congel D. Crutchfield B. Grimes E. Butcher -

W. Travers J. Hodges W. Bateman, EDO F. Gillespie B. D. Liaw J. Caldwell S. Varga A. Thadani Operations Center J. Calvo M. Virgili C. Rossi THRU: R. W. Borchardt, Director Standardization Project Di >ctorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation ,

FROM: Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING SENIOR MANAGEMENT MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) ON THE SYSTEM 80+ DESIGN DATE & TIME: February 1, 1994 (1 p.m. - 3 p.m.)

LOCATION: U.S. Nuclear Regulatory Commission One White fli'it North 11555 Rockvil Pike Rockville, Maijland 20852 Room 12-B-11 PURPOSE: For management to discuss the status of the certification review of the ABB-CE System 80+ design. An agenda is enclosed.

9402010391 940226 PDR ADOCK 05200002 r A PDR CONTACT: *k T. Wambach, NRR 504-1103 i '

31()O47 W .E bN ffh I

January 26, 1994 PARTICIPANTS *: NRR 63H-01 T.~ Murley R. Matzie W. Russell C. Brinkman D. Crutchfield J. Longo R. Borchardt L. Gerdes A. Thadani S. Ritterbusch ,

F. Congel F. Carpentino B. D. Liaw J. Robertson  :

B. Boger R. Mitchell T. Wambach D. Finnicum M. Franovich T. Crom S. Magruder .

R. Architzel (Original signed by) .j Thomas V. Wambach, Project Manager ,

Standardization Project Directorate

~ Associate Directorate for Advanced Reactors .i and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated t

cc w/ enclosure:

See next page -i

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of

. NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public.who wish to attend should contact me at (301) 504-1103.

DISTRIBUTION:

sDockettFile: PDST R/F TBoyce RArchitzel PDR RBorchardt TVWambach MXFranovich '

SMagruder PShea . OPA RPerch, 8D1 EJordan, MNBB 3701 WDean, ED0 ACRS (11) MPratt, 7E4 i NRR Mailroom,12G18 'JMoore, 15818 Receptionist, 0WFN OFC: LA:PDST:ADAR PgD{:pA,R/ SC:PDS y R NAME: PShea. g g Thdamdhch:tz RArchitzel DATE: 1/2[j/94 1/26/94 1/][f/94 0FFICIAL DOCUMENT COPY: DH0201.JND t

J ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ,.

ABB-Combustion Engineering, Inc.  ?~

1000 Prospect Hill Road '

'?

Windsor, Connecticut 06095-0500 4 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Victor G. Snell, Director  ;. I Safety and Licensing l 9210 Corporate Boulevard . l Suite 410 i Rockville, Maryland 20850 l l

-l l

i J

AGENDA NRC AND ABB-CE SENIOR MANAGEMENT MEETING February 1, 1994 ,

a NRC Headquarters

  • Rockville, Maryland 3 1:00 p.m. INTRODUCTIONS T. Wambach 1:10 OPENING COMMENTS R. Matzte

- Issues closed since last meeting

- Issues to be closed prior to FSER (Structural Design, Tech. Specs, ITAAC) 1:20 OPEN ISSUES RESOLUTION

- New Source Term Environmental Qualification- F. Carpentino I

- Equipment Survivability F. Carpentino

- Small Break LOCA Boron Dilution F. Carpentino l

- Shutdown Risk, Margin for Operator F. Carpentino

- Expansion of PRA Insights List D. Finnicum

- In-containment RWST pH Control T. Crom 2:55 CLOSING COMMENTS R. Matzie Enclosure

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _