ML20056E096
| ML20056E096 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 08/17/1993 |
| From: | Magruder R Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| NUDOCS 9308190340 | |
| Download: ML20056E096 (4) | |
Text
'
'o UNITED STATES
[
j NUCLEAR REGULATORY COMMISSION C
W ASHINGT ON, D. C. 70555 g
August 17, 1993 Docket No.52-002 MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow E. Adensam F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Wiggins W. Bateman, ED0 T. Gody, Acting B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo M. Virgilio C. Rossi THRU:
R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (SAFEGUARDS ISSUES) i DATE AND TIME:
August 18, 1993 (8 a.m. - 5 p.p.)
LOCATION:
Duke Engineering and Services 230 South Tryon Street Charlotte, North Carolina 28201-1004 PURPOSE:
Meeting to review the status of the safeguards review for ABB-CE System B0+.
A proposed agenda is enclosed.
1*
NE RE CINTER COPY S
(O
- gpADOCK9m40 9aosu m
05200002 A
\\
PDR y
\\
J
i
. August 17, 1993 PARTICIPANTS *:
NRC ABB-CE F. Young D. Finnicum S. Magruder S. Ritterbusch DE&S T. Crom L. Davis G. Pollard original signed by: Thomas J. Kenyon Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
Meeting Agenda cc w/ enclosure:
See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. However, portions of this meeting may be closed to protect ABB-CE safeguards information.
Members of the public who wish to attend should contact me at (301) 504-3139.
DISTRIBUTION:
Docket File PDST R/F MCullingford, 12E18 RBorchardt PDR TWEssig JNWilson TVWambach MXFranovich SMagruder PShea EJordan, MNBB 3701 OPA TGody, EDO ACRS (11) (w/o encl)
P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES PMcKee, 9D24 FYoung, 9D24 NRR Mailroom,12G18 MPratt, 7E4 BPerch, BH7
[a
[b PM:qST':ADAR SC:PDQ!ADAR 0FC:
LA:PDST:ADAR NAME: PSheag g SMIgIuder:sg TWEshg 08/[/93 08/f} /93 08/j]/93 DATE:
0FFICIAL DOCUMENT COPY:
CEMIG818.SLM
ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director l
Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 l
Mr. C. B. Brinkman, Manager l
Washington Nuclear Operations l
I ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 i
Mr. Sterling Franks U.S. Department of Energy
}
NE-42 Washington, D.C.
20585 l
Mr. Steve Goldberg l
Budget Examiner l
725 17th Street, N.W.
Washington, D.C.
20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006 s
Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 3
2300 N Street, N.W.
l Washington, D.C.
20037-1128 Mr. Regis A. Matzie, Vice President
[
Nuclear Systems Development ABB-Combustion Engineering, Inc.
[
i 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 I
r r
l
t SYSTEM 80+ SAFEGUARDS REVIEW MEETING August 18, 1993 PROPOSED AGENDA 8:00 - 8:30 Introduction 8:30 - 11:30 Insider Vulnerability Analysis 11:30 - 12:30 Lunch 12:30 - 3:00 Vital Equipment List 3:00 - 4:00 Control Room Indications for Critical Manual Valves l
t 4:00 - 5:00 Wrap Un - Further Actions t
[
l 4
Enclosure
.