ML20057D115

From kanterella
Jump to navigation Jump to search
Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled
ML20057D115
Person / Time
Site: 05200001, 05200002, 05200003
Issue date: 08/16/1993
From: Boyce T
Office of Nuclear Reactor Regulation
To: Borchardt R
Office of Nuclear Reactor Regulation
References
NUDOCS 9310010125
Download: ML20057D115 (9)


Text

I f--

{,-

f t%

lg UNITE D STATES g,

[g NUCLEAR REGULATORY COMMISSION g

l c. $

oE W ASHINGTON, D. C. 20$55 gl EASE A)D 7~E l Q

}

T August 16, 1993 Mee n^>c c,qa CELLED Docket Nos.52-001, 52-002 and 52-003 T~

~

MEMORANDUM FOR:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reac, ors and License Renewal Office of Nuclear Reactor Regulation FROM:

Thomas H. Boyce, Project Manager /

Standardization Project Directorate Associate Directorate for Advancbd Reactors and License Renewal

/

Office of Nuclear Reactor Reg 61ation

/

SUBJECT:

FORTHCOMING SENIOR MANAGEKENT MEETING WITH THE U.S. DEPART-MENT OF ENERGY (DOE)

/

/

DATE & TIME:

October 5, 1993 (9 a.ml - 11:30 a.m.)

/

LOCATION:

U. S. Nuclear Regulatory Commission 11555 Rockville Pi)(e land 20852 Rockville, Mary /

Room 12-B-ll

/

PURPOSE:

To discuss th'e status of the design certification reviews.

/

j/

ABB-CE El PARTICIPANTS *:

NRC T. Mur)ey R. Matzie R. Bergland D. Cr,utchfield C. Brinkman J. Quirk R. B6rchardt J.tt' Wilson l

j k

v 9310010125 930816 PDR ADOCK 05200001 3Fo3

^

tu j

~

IO N

_2-August 16, 1993 QQL WESTINGHOUSE S. Franks B. McIntyre P. Lang N. Fletcher (Original signed by)

Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation I

cc: See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 004-1130.

DJSTRIBUTION:

Docket File PDST R/F TMurley/FMiraglia,12G18 PDR WRussell, 12G18 DCrutchfield RBorchardt JNWilson TEssig TBoyce TVWambach MXFranovich PShea OPA CPoslusny TGody, ED0 ACRS (11)

NRR Mailroom, 12G18 e_

JMoore, 15B18 SMagruder AChaffee, EAB EJordan, 3701 ERossi, 9A2 Receptionist, WF P0' Dell, PMAS GZech, RPEB 0FC:

LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR NAME:

P5hea TBoyce:sg TEssig

[

08//6/h3 08//6/93 08//g93 DATE:

0FFICIAL DOCUMENT COPY:

DOCUMENT NAME:

DOE 1005.THB

GE Nuclear Energy Docket No.52-001 cc:

.Mr. Patrick W. Harriott, Manager Mr. Joseph Quirk Licensing & Consulting Services GE Nuclear Energy GE Nuclear Energy General Electric Company 175 Curtner Avenue 175 Curtner Avenue, Mail Code 782 San Jose, California 95125 San Jose, California _95125 Mr. Robert Mitchell General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy 12300 Twinbrook Parkway Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs U.S. Environmental Protection Agency I

401 M Streat, S.W.

Washington, D.C.

20460 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C.

20503 Mr. Frank A. Ross j

U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901 Germantown Road Germantown, Maryland 20874 j

Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 j

i Marcus A. Rowden, Esq.

fried. Frank, Harris, Shriver & Jacobson 1001 Pennsylvania Avenue, N.W.

Suite 800 Washington, D.C.

20004 Jay M. Gutierrez, Esq.

Newman & Holtzinger, P.C.

1615 L Street, N.W.

Suite 1000 Washington, D.C.

20036

'ABB-Combustion Engineering, Inc.

Docket No.52-002 3,

cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington. Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks I

U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

6 Docket No.52-003 Westinghouse Electric Corporation cc:

Mr. Nicholas J. Liparulo Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division-Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. B. A. McIntyre Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. John C. Butler Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh,fPennsylvania 15230 Mr. M. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20852 Mr. Sterling Franks U.S. Department of Energy NE-42 Washingicn, D.C.

20585 Mr. S. M. Modro EG&G Idaho Inc.

Post Office Box 1625 Idaho falls, Idaho 83415 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C.

20503 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901 Germantown Road Germantown, Maryland 20874

9 nato

[o,,

UNITED STATES NUCLEAR REGul.ATORY COMMISSION y

)3(

g

" i 7

E WASHING TON, D. C. 20555 8

L

/

l EASE NO TE.'

e....

August 16, 1993 A(GE 7~~ NG

/

Docket Nos.52-001, 52-002 and 52-003

-~

MEMORANDUM FOR:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation i

'3homas H. Boyce, Project Manager FROM:

Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING SENIOR MANAGEMENT MEETING WITH THE U.S. DEPART-MENT Of ENERGY (DOE)

DATE & TIME:

October 5, 1993 (9 a.m. - 11:30 a.m.)

LOCATION:

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Room 12-B-ll PURPOSE:

To discuss the status of the design certification reviews.

PARTICIPANTS *:

NRC ABB-CE G1 T. Murley R. Matzie R. Bergland D. Crutchfield C. Brinkman J. Quirk R. Borchardt J.N. Wilson

.x

Au.r;ust 16, 1993 i

DOE WESTINGHOUSE S. Franks B. McIntyre P. Lang N. Fletcher (Original signed by)

Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation l

cc: See next page-

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to. attend should contact me at (301) 504-1130.

DISTRIBUTION:

Docket File PDST R/F THurley/FMiraglia,12G18 PDR WRussell, 12G18 DCrutchfield RBorchardt JNWilson TEssig TBoyce TVWambach MXFranovich PShea OPA CPoslusny TGody, EDO ACRS (11)

NRR Mailroom, 12G18 JMoore, 15B18 SMagruder AChaffee, EAB EJordan, 3701 ERossi, 9A2 Receptionist, WF P0' Dell, PMAS GZech, RPEB

+

OFC:

LA:PDST:ADAR PM:PDST:ADAR I SC:PDST:ADAR NAME:

PShea TBoyce:sg j TEssig((

i DATE: 08//f/h3 '

08//6/93 08f(/93 OFFICIAL DOCUMENT COPY:

DOCUMENT NAME: DOE 1005.THB I

F w.

f carog'o UNITED STATES 8~

NUCLEAR REGULATORY COMMISSION

~

n 4

U W ASHINGTON, D. C. 20555 t

i k eenors

August 16, 1993 NEE 72AlG Q A) CELLED Docket Nos.52-001, 52-002 and 52-003 C~

MEMORANDUM FOR:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation l

FROM:

' Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING SENIOR MANAGEMENT MEETING WITH THE U.S. DEPART-MENT OF ENERGY (DOE)

DATE & TIME:

October 5, 1993 (9 a.m. - 11:30 a.m.)

LOCATION:

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Room 12-B-11 PURPOSE:

To discuss the status of the design certification reviews.

PARTICIPANTS *:

NRC ABB-CE S1 T. Murley R. Matzie R. Bergland D. Crutchfield C. Brinkman J. Quirk R. Borchardt J.N. Wilson

w.

-[ August 16, 1993 D0_E WESTINGHOUSE S. Franks B. McIntyre P. Lang N. Fletcher (Original signed by)

Thomas H. Boyce, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation I

cc:

See next pagh-

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1130.

DISTRIBUTION:

Docket File PDST R/F TMurley/FMiraglia,12G18 PDR WRussell, 12G18 DCrutchfield RBorchardt JNWilson TEssig TBoyce TVWambach MXFranovich PShea OPA CPoslusny TGody, EDO ACRS (11)

NRR Mailroom, 12G18 JMoore, 15B18 SMagruder Achaffee, EAB EJordan, 3701 ERossi, 9A2 Receptionist, WF P0' Dell, PMAS GZech, RPEB 0FC:

LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR NAME:

PShea TBoyce:sg TEssig f

08//6/ I3 08//6 /93 08//g93 DATE:

0FFICIAL DOCUMENT COPY:

DOCUMENT NAME: DOE 1005.THB

.