Summary of 870617-18 Meetings W/Util Re Review of Licensee Draft Proposal Re Specific Sections of Upgraded Tech Specs. List of Attendees & Agenda Encl
ML17342A748
Person / Time
Site: Turkey Point  
Issue date: 07/08/1987
From: Mcdonald D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0492, RTR-NUREG-492 TAC-63038, TAC-63039, NUDOCS 8707160038
Download: ML17342A748 (9)


Text

~S REgy

>~c" Wp

+

0 OO

,0 C

Yr gO

<<**+>>

UNITEDSTATES NUCLEAR REGULATORY COIVIMISSION WASHINGTON, D. C. 20555 July 8< 1987 Docket Nos.

50-250 and 50-251 LICENSEE: Florida Power and Light Company FACILITY: Turkey Point Units 3 and 4

SUBJECT:

SuIImIary of Meeting Held With Florida Power and Light Company (FPL}

on June 17 and 18, 1987, Regarding Technical Specification Conversion

REFERENCE:

TAC Numbers 63038 and 63039 Sack round Members of the NRC staff met with the licensee's representatives at Bethesda, Maryland, to discuss proposed revisions to specific sections of the Turkey Point h

Plant Units 3 and 4 Technical Specifications.

The licensee is converti t e existing custom plant Technical Specifications which were issued in the on er ng early 19?Os to the format and content of the Standard Technical Specifications for Westinghouse Pressurfzed Water Reactors (NUREG-0452).

~Summa r The meeting was an inftfal meeting to review the licensee's draft proposal relating to specific sections of the upgraded technical specifications.'

list of attendees and the agenda are enclosed.

Opening remarks by both the staff and licensee brfefly discussed the effort to date and purpose of the meeting.

The licensee described thefr review process, development constraints and the final product.

The interactions with the staff/licensee, control of changes and the general review process were discussed.

It was concluded that agreement to the details of the process for the review of the technical specification conversion would take place after this initial meeting.

The licensee provided a proposed schedule which appears to be reasonable.

However, the workload of both the staff and licensee could impact the overall schedule.

Both the schedule and review process will be detailed at the beginning of the next meeting.

Close interaction by all parties is necessary to assure that'he review will be implemented on a time1y schedule.

A detailed review of the following sections of the licensee's proposed technical specifications was performed:

Section 3/4.09 Refueling Operations 3/4.10 Special Test Exceptions 3/4.11 Radioactive Efflucnts 3/4,12 Radiological Environmental Monitoring 8707160038 870708 PDR ADDCg GgGGGP50 P

PDR

1 0

Several followup items for both the staff and licensee were identified involving variances and deviations from the Standard Technical Specifications.

The resolu-tion of these items will be handled and agreed upon by informal communications.

The sections will be updated based on the agreements reached.

1<hen all sections of the draft proposal have been updated a revised submittal will be provided to the staff for their final review.

This process is similar to that used in a near term operating license (NTOL) review of proposed technical specificati'ons.

The followup meetings will take place at the site, the Region II office and at Bethesda to assure interaction with all the participants.

Physical systems and components can be verified during the site meetings.

The licensee identified some sections of the proposed technical specifications to be deleted or added which differ from the Standard Technical Specifications due to plant specific design features.

/s/

Enclosures:

1.

Meeting Attendees 2.

Agenda cc w/enclosures:

See next page DISTRIBUTION O.L gd d

NRC PDR C. Moon Local PDR J. Schiffgens PD22 Rdg.

L. Rubenstein D. McDonald D. Miller OGC-Bethesda E. Jordan J. Partlow ACRS (10)

Daniel G. McDonald, Senior Project Manager Project Directorate II-2 Division of Reactor Projects-I/II LA 0

7/

/87 0

22 DMcDonald:hc 7/ 7/87 L u n tein 7/

'I I

I lj

Mr. C. 0. Woody Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C. M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 3230l Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Flor ida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304

ENCLOSURE I STS MEETING 6/l7-18 87, ATTENDANCE LIST Daniel G. McDonald Thomas C. Grozan

  • John B. MacDonald David Langford Calvin W. Moon
  • Clyde Morton Jesus Arias, Jr.

Birch P. Burdick Wi'lliam A. Skelley Gordon A. Nader Edward R. LaPierre John 0. Schiffgens John D. Trotter Project Manager/NRR FPL - Licensing Res.

Insp. PTP/R-II NRR/TSB NRR/TSB EG&G/EMG-AUO FPL - Turkey Point -

N FPL - Licensing FPL - Licensing FPL - Turkey Point - Licensing FPL - Turkey Point - Chemistry Project Engineer/NRR NUS

~Attended 6/17/87 only

ENCLOSURE 2

FPL/NRC MEETING AGENDA TURKEY POINT UNITS 3 a 4 TECHNICAL SPECIFICATION REVISION PROJECT MORNING JUNE 17, 1987 AGENDA LEAD OPENING REMARKS REVIEW PROCESS o

FPL INTERNAL PROCESS o

NRC INTERNAL PROCESS o

CONTROL OF CHANGES o

. CONTROL OF WORD PROCESSING o

HOW/WHEN TO SHOLLY SCHEDULE FPL/NRC FPL NRC FPL FPL FPL FPL o

PROPOSED MEETING SCHEDULE o

FINAL APPROVAL SCHEDULE o

FPL - PNSC/CNRB o

NRC SER/SHOLLY o

FPL IMPLEMENTATION INFORMAL COMMUNICATION CHANNEL MEETING LOCATION FPL FPL

FPL/NRC MEETING AGENDA TURKEY POINT UNITS 3 a 0 TECHNICAL SPECIFICATION REVISION PROJECT AFTERNOON JUNE 17, 198?

AGENDA LEAD SPECIFIC TECHNICAL SPECIFICATION REVIEM FPL o

3/0,9

- REFUELING OPERATIONS o

3/4.10 SPECIAL TEST EXCEPTIONS o

3/4.11 RADIOACTIVE EFFLUENTS o

3/0.12 RADIOLOG ICAL ENVIRONNENTAL NON ITOR I NG o

MISCELLANEOUS TECHNICAL SPECIFICATIONS

0 I ~

l,