MONTHYEARNRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0035, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications NRC-24-0025, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] |
Text
DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 DTE January 12, 2024 10 CFR 71.106 NRC-24-0007
Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Fermi 1 Power Plant NRC Docket No. 50-16 and 71-0526 NRC License No. DPR-9
Fermi 2 Power Plant NRC Docket No. 50-341 and 71-0526 NRC License No. NPF-43
Subject:
Report of Changes to Quality Assurance Program for Radioactive Material Packages
References:
- 1) Letter from NRC to DTE, "Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0526, Revision 6," dated August 28, 2015 (ML15244A004)
- 2) DTE Letter NRC-21-0046, "Report of Changes to Quality Assurance Program for Radioactive Material Packages," dated August 27, 2021 (ML21239A069)
- 3) DTE Letter NRC-22-0042, "Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical Specifications Bases, and a Summary of the Excessive Detail Removed from the UFSAR," dated November 9, 2022 (ML22313A187)
- 4) DTE Letter NRC-22-0052, "Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) through EIE on November 9, 2022," dated November 17, 2022 (ML22325A158)
- 5) DTE Letter NRC-09-0072, "Renewal of Quality Assurance Program Approval for Radioactive Material Packages," dated October 29, 2009 (ML093100305)
- 6) DTE Letter NRC-22-0046, "Submittal of Biennial Review of the Fermi 1 Safety Analysis Report," dated November 14, 2022 (ML22319A151)
USNRC NRC-24-0007 Page2
In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 71.106(b ), DTE Electric Company (DTE), is submitting a 24-month update of changes made to approved Radioactive Material Packages Quality Assurance Program No. 0526. This report was due on August 28, 2023; however, DTE failed to submit a letter to the NRC documenting that review. This condition was entered into the Fermi Corrective Action Program on December 5, 2023. In Reference 1, the NRC transmitted a revised 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages (i.e., NRC Form 311, Approval No. 0526, Revision 6) for activities conducted at DTE's Fermi 1 and Fermi 2. The regulations in 10 CFR 71.106 require that changes to the approved Quality Assurance Program that do not reduce commitments must be submitted to the NRC every 24-months, with the reporting period starting on the date the revised NRC Form 311 was approved (i.e., August 28, 2015).
Changes made to the Radioactive Material Packages Quality Assurance Program in the previous reporting period were submitted under Reference 2.
This letter provides a report of changes made to the Radioactive Material Packages Quality Assurance Program that do not reduce commitments for the 24-month period of August 28, 2021 through August 27, 2023.
In References 3 and 4, DTE submitted Revision 24 of the Fermi 2 Updated Final Safety Analysis Report (UFSAR). As identified in Reference 5, the 10 CFR 50, Appendix B, Quality Assurance Program documented in Section 17.2 of the Fermi 2 UFSAR is utilized to satisfy the Quality Assurance requirements of 10 CFR 71. A summary of the changes included in Revision 24 of Chapter 17 of the UFSAR, but that were not already summarized in the Reference 2 report, is provided below:
- Minor administrative improvements, renumbering, clarifications, spelling corrections, and editorial items were made. These types of changes are not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b).
- The responsibility of the Employee Concerns Program is relocated from the Director -
Nuclear Oversight to the Senior Vice President and Chief Nuclear Officer. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- The reporting structure of the Radiological Emergency Response Preparedness (RERP) group is changed to report up through the Licensing Manager then to the Vice President Engineering & Technical Support rather than reporting directly to the Vice President Engineering & Technical Support. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
USNRC NRC-24-0007 Page 3
- The position of Manager - Chemistry is merged with the position of Manager - Radiation Protection (RP), such that a single individual manages both groups. There are no changes to the roles and responsibilities of the Chemistry or RP groups. As a result, this change can be considered an organizational revision. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- The reporting structure of the site's Environmental group is changed from the Manager-Nuclear Licensing to the Manager-Chemistry. This change transfers the non-radiological environmental monitoring responsibilities to the Manager - Chemistry.
There are no changes to the roles and responsibilities of the Environmental group; therefore, this change is considered an organizational revision. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- A new position for the Assistant Plant Manager was created. This new position is responsible for managing a portion of the Nuclear Production organization. Specifically, the areas of Radiation Protection (RP), Chemistry, Industrial Health and Safety (IHS),
and Human Performance (HP) are now split from the responsibility of the Executive Director - Nuclear Production and are now reporting to the Assistant Plant Manager.
Note, this change is implemented in a manner such that the option still exists for the Executive Director - Nuclear Production and the Assistant Plant Manager positions to be combined if needed or desired in the future. There are no changes in the roles and responsibilities of the RP, Chemistry, IHS or HP and the additional position causes no hinderance to ability of performing the functions. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- Revisions were made permitting of the procurement of calibration and/or testing services from domestic and international laboratories accredited to ISO/IEC 17025:2017. This is due to NRC Safety Evaluation Report endorsement (ML20322A019) ofNEI 14-05A Revision 1 which recognized ISO/IEC 10725:2017 as the basis for the International Laboratory Accreditation Cooperation (ILAC) accreditation process. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(l).
- Revisions were made adding nondestructive testing as an area to be reviewed by the Nuclear Safety Review Group to align with ANSI N18.7-1976. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(l).
USNRC NRC-24-0007 Page4
DTE has made the following additional changes to the Fermi 2 Quality Assurance Program (Chapter 17 of the UFSAR) since the submittal ofUFSAR Revision 24 in References 3 and 4.
- Added Medical Review Officer and substance abuse expert (which are contractors/vendors) to the list of internal nuclear generation areas to be audited. Adding the new audited area clarifies 10 CFR 26 and 10 CFR 73 tied to the 12-month auditing frequency of these contractors/vendors. This change is considered a clarification and is not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b).
- Revision was made changing the reporting structure for the Manager - Chemistry moved under the Director - Operations. This change also unmerged the position of Manager -
Chemistry with the position of Manager - Radiation Protection (RP) that was added in Revision 24 of References 3 and 4. As a result, this change can be considered an organizational revision. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- Restructuring of the Engineering organization to enhance effectiveness has resulted in the elimination of a manager position and transfer of group responsibility to other Manager positions. The following changes are (1) removed position of "Manager - Nuclear Tactical Engineering", (2) transferred responsibility of Procurement Engineering to Manager - Nuclear Design Engineering, and (3) transferred responsibility of Engineering Response Team to Manager - Nuclear Strategic Engineering. Under the current UFSAR, Manager - Nuclear Tactical Engineering, Manager - Nuclear Strategic Engineering, and the Manager - Nuclear Design Engineering report directly to the Director - Nuclear Engineering. Thus, the removal of the Manager - Nuclear Tactical Engineering and transfer of responsibility for the Engineering Response Team to the Manager - Nuclear Strategic Engineering and Procurement Engineering to the Manager - Nuclear Design Engineering does not affect the requisite authority and organizational freedom for those functions. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
- Added 2011 NIRMA technical guidelines to provide supplemental guidance to ANSI N45.2.9-1974, Regulatory Guide 1.88 Revision 2. 2011 NIRMA standards for electronic records were previously approved by an NRC safety evaluation for Duke Energy Carolinas, LLC (ML15099A561). This change has minor safety significance and is not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(l).
For Fermi 1, the Radioactive Material Packages Quality Assurance Program is implemented through Fermi 2 UFSAR Chapter 17 and Fermi 1 Safety Analysis Report (Fl SAR) Sections 6.2 and 6.5. Reference 6 identifies no changes in the previous 24 months to either Sections 6.2 or 6.5 of the Fl SAR. In addition, no changes to the Fl SAR have been made since the Reference 6 submittal.
As indicated above, these changes did not reduce the commitment in the Radioactive Material Packages Quality Assurance Program.
No new commitments are being made in this submittal.
USNRC NRC-24-0007 Page 5
Should you have any questions or require additional information, please contact me at (734) 586-4772.
Sincerely, (fa)
Eric Frank Manager - Nuclear Licensing