MONTHYEARNRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0035, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications NRC-24-0025, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] Category:Quality Assurance Program
[Table view] |
Text
DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 August 27, 2021 10 CFR 71.106 NRC-21-0046 Attention: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Fermi 1 Power Plant NRC Docket No. 50-16 NRC Docket No. 71-0526 NRC License No. DPR-9 Fermi 2 Power Plant NRC Docket No. 50-341 NRC Docket No. 71-0526 NRC License No. NPF-43
Subject:
Report of Changes to Quality Assurance Program for Radioactive Material Packages
References:
- 1) Letter from NRC to DTE, Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0526, Revision 6, dated August 28, 2015 (ML15244A004)
- 2) DTE Letter NRC-19-0063, Report of Changes to Quality Assurance Program for Radioactive Material Packages, dated August 21, 2019 (ML19233A207)
- 3) DTE Letter NRC-21-0002, Submittal of Revision 23 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical Specifications Bases, and a Summary of the Excessive Detail Removed from the UFSAR, dated February 2, 2021
- 4) DTE Letter NRC-09-0072, Renewal of Quality Assurance Program Approval for Radioactive Material Packages, dated October 29, 2009 (ML093100305)
- 5) DTE Letter NRC-20-0068, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report, dated November 25, 2020 (ML20330A289)
USNRC NRC-21-0046 Page 2 In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 71.106(b), DTE Electric Company (DTE), is submitting a 24-month update of changes made to approved Radioactive Material Packages Quality Assurance Program No. 0526. In Reference 1, the NRC transmitted a revised 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages (i.e., NRC Form 311, Approval No. 0526, Revision 6) for activities conducted at DTEs Fermi 1 and Fermi 2. The regulations in 10 CFR 71.106 require that changes to the approved Quality Assurance Program that do not reduce commitments must be submitted to the NRC every 24-months, with the reporting period starting on the date the revised NRC Form 311 was approved (i.e., August 28, 2015).
Changes made to the Radioactive Material Packages Quality Assurance Program in the previous reporting period were submitted under Reference 2. Note that Reference 2 was submitted a few days prior to the end of the previous 24-month reporting period; however, no changes were made between the Reference 2 letter (i.e., August 21, 2019) and the end of the previous reporting period (i.e., August 27, 2019).
This letter provides a report of changes made to the Radioactive Material Packages Quality Assurance Program that do not reduce commitments for the 24-month period of August 28, 2019 through August 27, 2021.
In Reference 3, DTE submitted Revision 23 of the Fermi 2 Updated Final Safety Analysis Report (UFSAR). As identified in Reference 4, the 10 CFR 50, Appendix B, Quality Assurance Program documented in Section 17.2 of the Fermi 2 UFSAR is utilized to satisfy the Quality Assurance requirements of 10 CFR 71. A summary of the changes included in Revision 23 of Section 17.2 of the UFSAR, but that were not already summarized in the Reference 2 report, is provided below:
Minor administrative improvements, clarifications, spelling corrections, and changes to punctuation or editorial items were made. These types of changes are not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b).
The Plant Support department was reorganized under other department titles and reporting structures. Some of the responsibilities and reporting organizations previously held by or reporting to or through the Plant Support department are transferred to other departments. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
The position title of Manager - Nuclear Training was revised to Director - Nuclear Training. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(2).
The description of the number of Onsite Review Organization (OSRO) members was clarified. This change was not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b).
The position title of Chief Operating Officer was revised to Chief Executive Officer while also removing the stand-alone discussion of the Executive Board Chairman. This
USNRC NRC-21-0046 Page 3 change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(2).
The frequency of Nuclear Safety Review Group (NSRG) meetings was clarified from once per six months to twice per year. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b).
Procurement of calibration and/or testing services from domestic and international laboratories was revised to permit accreditation to ISO/IEC-17025:2017 in addition to ISO/IEC-17025:2005. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(1).
The discussion of human performance responsibilities was relocated from the Nuclear Performance Improvement organization to the Executive Director - Nuclear Production organization. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
Revisions were made regarding the available grace period for audits. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(1).
The discussion of industrial health and safety responsibilities was relocated from the Radiation Protection organization to the Executive Director - Nuclear Production organization. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
The Nuclear Projects and Business Operations department was renamed to the Strategic Business Operations department and reorganized to report directly to the Senior Vice President and Chief Nuclear Officer. Additionally, the specific position title of Manager
- Nuclear Strategy and Business Support was replaced with a generic discussion of the position. These changes were not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b)(2) and (b)(5).
A new position of Vice President - Engineering and Technical Support was created.
Some existing responsibilities and reporting organizations previously held by or reporting to or through the Site Vice President were transferred to this new position. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
The portions of the Major Enterprise Projects (MEP) group performing activities subject to the Quality Assurance Program were relocated from a functional role provided by Corporate Support to being under direct control of the Fermi 2 organizational structure and the group was renamed Nuclear Technical Support - Project Management. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(5).
The specific position title of Supervisor - Materials was replaced with a generic discussion of the position. This change is not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(2).
The description of the process for maintaining proficiency of audit personnel was revised to provide clarification. This change was not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b).
USNRC NRC-21-0046 Page 4 Provisions were added to allow for remote surveillances to be used when a pandemic or similar state of emergency has been declared restricting access or travel. This change was not a reduction in commitment of the Quality Assurance Program consistent with the example in 10 CFR 71.106(b)(1).
DTE has made no additional changes to the Fermi 2 Quality Assurance Program since the submittal of UFSAR Revision 23 in Reference 3.
For Fermi 1, the Radioactive Material Packages Quality Assurance Program is implemented through Fermi 2 UFSAR Chapter 17 and Fermi 1 Safety Analysis Report (F1SAR) Sections 6.2 and 6.5. Reference 5 identifies no changes in the previous 24 months to either Sections 6.2 or 6.5 of the F1SAR. The Reference 5 submittal does describe minor changes to Fermi 1 documents, but which did not actually impact the F1SAR Quality Assurance Program description. These changes were not a reduction in commitment of the Quality Assurance Program consistent with the examples in 10 CFR 71.106(b). In addition, no changes to the F1SAR have been made since the Reference 5 submittal.
As indicated above, these changes did not reduce the commitment in the Radioactive Material Packages Quality Assurance Program.
No new commitments are being made in this submittal.
Should you have any questions or require additional information, please contact me at (734) 586-4273.
Sincerely, Margaret M. Offerle for Ertman L. Bennett III Manager - Nuclear Licensing cc: NRC Project Manager NRC Resident Office Regional Administrator, Region III