Letter Sequence Response to RAI |
---|
|
|
MONTHYEARNOC-AE-12002898, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-09)2012-10-16016 October 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-09) Project stage: Request NOC-AE-12002928, Supplement to Relief Request RR-ENG-3-09 for the Essential Cooling Water System2012-11-14014 November 2012 Supplement to Relief Request RR-ENG-3-09 for the Essential Cooling Water System Project stage: Supplement ML12314A2602012-11-20020 November 2012 11/8/2012 - Summary of Telephone Conference with STP Nuclear Operating Company to Discuss RR-ENG-3-09, Request for Relief from ASME Code Requirements for Essential Cooling Water System Piping for South Texas Project, Unit 2 Project stage: Other ML12339A2672012-12-0404 December 2012 Acceptance Review Email, Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage Project stage: Acceptance Review ML13003A0722013-01-0202 January 2013 Email, Request for Additional Information, Relief Request RR-ENG-3-09 from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage Project stage: RAI NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System Project stage: Response to RAI ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage Project stage: Other 2012-12-04
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24201A0462024-07-26026 July 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-07 ML24040A1962024-02-13013 February 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-06 ML22245A0012022-09-12012 September 2022 Relief from the Requirements of the ASME Code ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) ML19142A3072019-08-13013 August 2019 Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) ML18303A2062018-11-0707 November 2018 Request for Relief from ASME Code to Extend the Inservice Inspection Interval for Category B-N-2 and B-N-3 Examinations NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) ML18177A4252018-07-24024 July 2018 Relief from the Requirements of the Asme Code Regarding the Third 10-Year Inservice Inspection Interval ML18187A1492018-07-24024 July 2018 Relief Request RR-ENG-3-22 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography NOC-AE-18003578, Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-06-25025 June 2018 Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003547, Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14)2018-02-15015 February 2018 Proposed Alternative to Reactor Vessel Inservice Inspection Intervals (Relief Request RR-ENG-3-14) ML16174A0912016-06-30030 June 2016 Relief Request RR-ENG-3-20, Use of ASME Code Case N-770-1, Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, for the Third 10-Year Inservice Inspection Interval ML15218A3672015-08-21021 August 2015 Relief Request RR-ENG-17, Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-End Welds with Flaw Analysis, Third 10-Year ISI Interval ML13102A1262013-04-23023 April 2013 Withdrawal of Relief Request RR-ENG-3-12 from ASME Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valve with Seal Cap, Third 10-year Inservice Inspection Interval ML13087A5172013-04-12012 April 2013 Relief Request RR-ENG-3-09, Request for Relief from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping Until April 2013 Refueling Outage ML13004A3392013-03-12012 March 2013 Relief Request RR-ENG-3-10, Reactor Pressure Vessel Head Flange O-Ring Leakoff Lines Non-Destructive Examination, for the Third 10-Year Inservice Inspection Interval NOC-AE-12002939, Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12)2013-02-0707 February 2013 Request for Relief from ASME Section XI Code Requirements for Periodic Inspection of Reactor Coolant Pressure Boundary Check Valves with Seal Cap Enclosures (Relief Request RR-ENG-3-12) NOC-AE-12002956, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System2013-01-31031 January 2013 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System ML12243A3432012-09-10010 September 2012 RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds ML12235A3472012-08-28028 August 2012 Relief Request RR-ENG-3-06 from ASME Code Requirements for Leak Testing Boundaries of Class 1 Pressure-Retaining Components, Third 10-Year Inservice Inspection Interval (TAC ME7053-ME7054) ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 NOC-AE-12002837, Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04)2012-05-0909 May 2012 Response to Request for Additional Information: Application of an Alternative to Requirements for Examination of Class 1 and Class 2 Piping Welds (Relief Request RR-ENG-3-04) NOC-AE-12002807, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08)2012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) ML1118605352011-07-29029 July 2011 Relief Request RR-ENG-2-55 from ASME Code Requirements for Weld Examinations, Second 10-Year Inservice Inspection Interval ML1109803472011-04-20020 April 2011 Relief Request RR-ENG-3-01, from ASME Code Requirements for Steam Generator Main Steam Nozzle Non-Destructive Examination, Third 10-Year Inservice Inspection Interval ML1108109482011-04-0707 April 2011 Request for Relief RR-ENG-3-03 from ASME Code Requirements for Pump Casing Inservice Inspection Examination, Third 10-Year Inservice Inspection Interval ML1108400762011-04-0505 April 2011 Request for Relief RR-ENG-3-02 from ASME Code Requirements for Reactor Pressure Vessel Flange Insert Non-Destructive Examination, Third 10-Year Inservice Inspection Interval NOC-AE-10002600, Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05)2010-10-18018 October 2010 Request for Relief from ASME Section XI Requirements for Ultrasonic Examination of Reactor Pressure Vessel Shell-to-Flange Welds (RR-ENG-3-05) NOC-AE-10002594, Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03)2010-09-20020 September 2010 Request for Relief from ASME Section XI Code Requirements for Pump Casing Inservice Inspection Examination (Relief Request RR-ENG-3-03) ML1021500772010-09-0202 September 2010 Relief Request Nos. VRR-01, PRR-03, PRR-02, and PRR-01 for Third 10-year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. ME3515 Through ME3522) ML1006208692010-03-24024 March 2010 Authorization of Relief Request RR-ENG-2-53, Alternative to Inservice Inspection Requirements for Ultrasonic Exam of Reactor Pressure Vessel Shell-to-Flange Weld ML1005395882010-03-12012 March 2010 Relief Request RR-ENG-2-52 from ASME Code, Section XI Requirements for Essential Cooling Water System Code Repair NOC-AE-09002399, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52)2009-03-12012 March 2009 Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-52) ML0827502202008-12-0909 December 2008 Relief Request RR-ENG-2-30, Request for Relief to Use ASME Code Case N-516-3, Underwater Welding, Section XI, Division 1 ML0827707852008-11-12012 November 2008 Authorization of Relief Request RR-ENG-2-51 from ASME Code Case N-498-4, on 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems ML0824901602008-09-26026 September 2008 Relief Request RR-ENG-2-49, Second 10-Year Inservice Inspection Interval, Deferral of Code Repair in the Essential Cooling Water System Piping ML0735410722008-01-10010 January 2008 Request for Relief No. RR-ENG-2-48 from ASME Code Case N-638-1 Requirements Regarding Start Time for 48-Hour Hold Period Before Non-Destructive Examination of Weld Overlay Repair ML0731204462007-11-30030 November 2007 Relief Request RR-ENG-2-47 for Approval of Temporary Non-code Repair and Deferral of Code Repair Upgraded Essential Cooling Water System Piping NOC-AE-07002211, Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For...2007-10-0202 October 2007 Relief Request (RR-ENG-2-50) for the Second 10 Year ISI Interval from 10 CFR 50.55a for the Purpose of Invoking Code Case N-698, Design Stress Intensities and Yield Strength Values For... ML0708510082007-04-30030 April 2007 Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication ML0708102642007-04-0202 April 2007 Relief, Request for Relief No. RR-ENG-2-43 for Remainder of Second 10-year Inservice Inspection Interval Application of Weld Overlays in Pressurizer Nozzle Safe End Welds (TAC Nos. MD1414 - MD1423) ML0706500752007-03-15015 March 2007 Request to Use 2001 Edition Through 2003 Addenda of ASME Code for Operations and Maintenance for Remainder of Second 10-Year Inservice Testing Program Interval ML0704400592007-03-0101 March 2007 Request for Relief No. RR-ENG-2-45 for Remainder of Second 10-year Inservice Inspection Interval Use of Penetrameters in Radiography Examination ML0622303092006-10-26026 October 2006 Response to Relief Request RR-ENG-2-42 for Approval Non-Code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, TAC MC8804 NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0610907542006-05-25025 May 2006 Relief, Relief Request RR-ENG-2-39 and RR-ENG-2-40 for Approval of Temporary Non-code Repair and Deferral of Code Repair of Essential Cooling Water System Piping, Trains 1B and 1C ML0609702402006-05-12012 May 2006 Relief, RR-ENG-2-41 TAC No. MC8279 NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40)2005-07-19019 July 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) 2024-07-26
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230040, Update Foreign Ownership, Control, or Influence (FOCI)2023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic 2024-10-16
[Table view] |
Text
Nuclear Operating Company South Texas Proect Electric Generating Station PO. Box289 Wadsworth, Texas 77483 January 31, 2013 NOC-AE-12002956 File No.: G25 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 2 Docket No. STN 50-499 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 for the Essential Cooling Water System (TAC No. ME9806)
References:
- 1. Letter, D. W. Rencurrel to NRC Document Control Desk, "Request for Relief from ASME Boiler and Pressure Vessel Code,Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-09)," NOC-AE-12002898, dated October 16, 2012 (ML12299A287)
- 2. Letter, D. W. Rencurrel to NRC Document Control Desk, "Supplement to Relief Request RR-ENG-3-09 for the Essential Cooling Water System (TAC No.
ME9806)," NOC-AE-12002928, dated November 14, 2012 (ML12341A229)
- 3. E-Mail, B. K. Singal, NRC, to Jamie Paul, STPNOC, "South Texas Project, Unit 2 - Email, Request for Additional Information, Relief Request RR-ENG-3-09 from ASME Code Requirements; Deferral of Code Repair of Essential Cooling Water System Piping until April 2013 Refueling Outage (TAC No. ME9806), dated January 2, 2013 (ML13003A072)
By Reference 1, as supplemented by Reference 2, the STP Nuclear Operating Company (STPNOC) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) to defer repairs to a degraded flange in the Essential Cooling Water System (ECWS). By Reference 3, the NRC staff requested additional information regarding the review of RR-ENG-3-09. STPNOC's response to Reference 3 is provided in the attachment to this letter.
There are no commitments in this letter.
STI: 33650093
NOC-AE-12002956 Page 2 of 3 If there are any questions, please contact Coley Chappell at 361-972-4745, or me at 361-972-7566.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on ,o , Zo13.
G. T. Powell Vice President, Generation ccc
Attachment:
Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 (TAC No. ME9806)
NOC-AE-12002956 Page 3 of 3 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O-Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Peha P. O. Box 289, Mail Code: MN116 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.
Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Richard A. Ratliff Texas Department of State Health Services Alice Rogers Texas Department of State Health Services
Attachment NOC-AE-12002956 Page 1 of 2 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-09 (TAC No. ME9806)
By letter dated [October] 16, 2012 (Agencywide Document Access and Management System (ADAMS) Accession No. ML12299A287), as supplemented by letter dated November 14, 2012 (ADAMS Accession Number ML12341A229), STP Nuclear Operating Company (STPNOC, the licensee), requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) to defer repairs to a degraded flange in the essential cooling water system (ECWS). In order to complete its review, the U.S.
Nuclear Regulatory Commission (NRC) staff requests the following additional information.
REQUEST:
- 1. The NRC staff does not concur with the results of the analysis used in the relief request to demonstrate structural integrity of the piping under consideration. The NRC staff believes that the analysis uses "as received" material properties. Selective leaching, the degradation mechanism of interest in this request, is known to degrade material properties ahead of advancing cracks. At the time of the request, neither the degree to which the material properties are degraded nor the area over which this degradation occurs is known or can be determined without destructively examining the flange under consideration. Given that the appropriate material properties for use in the structural integrity evaluation are not known, the NRC staffs evaluation is based on a worst case scenario, i.e., that the strength of the material from which the flange is constructed is completely degraded, i.e., zero tensile strength.
Given that zero tensile strength in the degraded material is assumed, the NRC believes that, in the event of an earthquake, a guillotine break is likely to occur at the degraded pipe location.
Such a break would encompass the full 360 degree circumference of the flange and result in complete separation of the ECWS A train piping from the ECWS B train and cross-tie piping.
While the NRC staff acknowledges that the piping system, as designed, i.e., piping from trains A and Band the cross-tie piping function as a single unit, are seismically qualified, based on the information provided, it is not clear that this piping system remains seismically qualified when severed at the degraded flange.
Please demonstrate that the Trains A and B and Cross-tie piping of the ECWS remain seismically qualified when severed by a guillotine break at the degraded location on the flange in the cross-tie piping.
RESPONSE
In order to demonstrate that the South Texas Project (STP) Unit 2 ECWS Trains A and B and associated cross-tie piping remain seismically qualified, STPNOC pipe stress (ME 101) analytical model was modified to introduce a guillotine break (separation) at the location of the existing flaw and then re-analyzed using design basis approach and stress limits. 'The results of this evaluation show that this piping system meets the ASME Code requirements and therefore remains seismically qualified.
Attachment NOC-AE-12002956 Page 2 of 2 Additional Discussion:
A guillotine break is considered to occur at the location where the 10-inch pipe adjoins the de-alloyed flange before being bolted to valve EW0274, corresponding to the location of the flaw as shown in Figures S-1 and S-2 in the supplement to the relief request.
The ME101 analytical model was established to simulate a separation at the location as described above. As such, this flange element will not be able to sustain or transmit any mechanical forces and moments in the piping system analytical model. The ME101 piping analysis analyzes all of the defined load cases as outlined in the current design basis analysis.
Functional capability is assured as shown by Equation (Eqn.) 9D (Occasional Loads, Safe Shutdown Earthquake) for maximum computed stress 6385 psi being less than the allowable stress 25,500 psi (1. 2 XSh) for Eqn. 9B (Occasional Loads, Operating Basis Earthquake), where "Sh" is the hot allowable stress for system operation in a prescribed thermal mode with elevated temperature, usually greater than an ambient temperature of 70 0 F.
Below is a summary of the maximum computed stresses with the guillotine break modeled, as documented in STPNOC Condition Report Engineering Evaluation (CREE) No. 12-22876-25, for Code Stress Equations 8, 9B, 9D, and 10.
Maximum Allowable Stress Design Condition Level Computed Stress (psi) Ratio (psi)
Eqn. 8, Sustained Loads -- 4930 21,250 (Sh) 0.232 Eqn. 9, Occasional Loads B 5592 25,500 (1.2 XSh) 0.219 Eqn. 9, Occasional Loads D 6385 51,000 (2 .4 XSh) 0.125 Eqn. 10, Thermal Expansion -- 24,833 27,000 (Sa) 0.920