11/8/2012 - Summary of Telephone Conference with STP Nuclear Operating Company to Discuss RR-ENG-3-09, Request for Relief from ASME Code Requirements for Essential Cooling Water System Piping for South Texas Project, Unit 2
ML12314A260
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 11/20/2012
From: Lyon C
Plant Licensing Branch IV
To:
South Texas
Singal B
References
TAC ME9806
Download: ML12314A260 (4)


Text

.;:,v'"

t,j>.1\ REG Ul "I?,

UNITED STATES

~ 0-11 NUCLEAR REGULATORY COMMISSION

! ~ WASHINGTON, D.C. 20555-0001

<< 0 tr, f

'1'C/. ~

~

~-? ~o N

        • ~ ovem ber 20, 2012 LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project, Unit 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE ON NOVEMBER 8,2012, TO DISCUSS THE LICENSEE'S REQUEST FOR RELIEF RR-ENG-3-09, DATED OCTOBER 16, 2012 (TAC NO. ME9806)

On November 8, 2012, members of the U.S. Nuclear Regulatory Commission (NRC) staff held a telephone conference (telecon) with representatives from STP Nuclear Operating Company (STPNOC, the licensee) to discuss the licensee's request for relief RR-ENG-3-09 dated October 16,2012 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML12299A287), for South Texas Project, Unit 2.

The licensee provided clarifying information for RR-ENG-3-09 to the NRC staff regarding (1) the location of the through-wall indication on the weld neck flange at valve 2-EW-0274 (Essential Chillers 21B/22B to Essential Chillers 21A122A ECW Cross-Tie Valve) and (2) the purpose of the cross-tie piping.

Based on the discussion, the licensee proposes to supplement its letter dated October 16, 2012, and provide the following information:

1. A detailed description of the location of the through-wall indication with regard to the flange, cross-tie piping, and associated valves.
2. A discussion of the purpose of the cross-tie during normal operations and accident conditions and the configuration during the normal and accident conditions of the cross-tie valves.
3. A discussion of any references to the cross-tie in plant operating procedures, abnormal operating procedures, emergency operating procedures, design basis, and risk assessments.
4. A discussion of the safety significance of the cross-tie piping and valves.

The licensee will confirm the proposed date of its submittal with the NRC project manager. No regulatory decisions were made on the telecon. A list of attendees is enclosed.

-2 If you have any questions, please contact me at (301) 415-2296 or bye-mail at fred.lyon@nrc.gov.

Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499

Enclosure:

Attendance List cc w/encl: Distribution via Listserv

ATTENDANCE LIST U.S. NUCLEAR REGULATORY COMMISSION TELEPHONE CONFERENCE ON NOVEMBER 8, 2012 WITH STP NUCLEAR OPERATING COMPANY REQUEST FOR RELIEF RR-ENG-3-09 SOUTH TEXAS PROJECT. UNIT 2 DOCKET NO. 50-499 STP Nuclear Operating Company U.S. Nuclear Regulatory Commission I M. Berg F. Lyon, Office of Nuclear Reactor Regulation (NRR)

M. Murray D. Alley, NRR R Kersey J. Tsao, NRR I S. Patel J. Drake, Region IV J. Paul C. Chappell Enclosure

- 2 If you have any questions, please contact me at (301) 415-2296 or bye-mail at fred.lvon@nrc.gov.

IRAJ Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-499

Enclosure:

Attendance List cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDeEpnb Resource LPLIV r/f RidsRgn4MailCenter Resource RidsAcrsAcnw_MaiICTR Resource DAiley, NRR/DE/EPNB RidsNrrDorlLpl4 Resource JTsao, NRR/DE/EPNB RidsNrrLAJBurkhardt Resource JDrake, RIV RidsNrrPMSouth Texas Resource ADAMS Accession No. ML12314A260 OFFIr.F NRR/LPL4/PM NRR/LPL4/LA NRRlLP4/BC NRRlLPL4/PM NAME FLyon JBurkhardt MMarkley ~LYOn DATE 11/20/12 11/20/12 11/20/12 1120112 OFFICIAL RECORD COpy