Category:Letter type:NL
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 2024-09-09
[Table view] Category:License-Operator
MONTHYEARML24214A0022024-08-0101 August 2024 Final SRO Written Exam Vogtle Units 3 and 4 2024-301 Combined (Redacted for Public Release) ML24213A0852024-07-31031 July 2024 Final RO Written Exam Vogtle, Units 3 and 4, 2024-301 Combined (Redacted for Public Release) ML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) ML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) ML23229A1472023-06-22022 June 2023 301, 2B - Exam Administrative Items ML23159A0802023-06-0808 June 2023 301 Post Examination Comments NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam ML22280A0542022-10-0606 October 2022 Notification of Licensed Operator Initial Examination 05000424/2023301 and 05000425/2023301 ML22213A0502022-08-0101 August 2022 2022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 ML22213A0482022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 ML22136A2082022-05-16016 May 2022 2B Exam Administrative Items- Normal Release NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML22068A2112022-03-0909 March 2022 301 AP-1000 Written Exam Approval Letter ML22010A1962022-01-10010 January 2022 301 Exam Administrative Items (Normal Release) (ADAMS-2B) ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21313A1802021-11-0909 November 2021 Operator Licensing Examination Approval 05000424/2021301 and 05000425/2021301 ML21286A6692021-10-13013 October 2021 301 2B ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items ML21216A0992021-08-0404 August 2021 File 2B Administrative Items ML21189A1562021-07-0808 July 2021 Enclosure 2: Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test ND-21-0427, Enclosure 3: Sample NRC Form 398 Personal Qualification Statement - Licensee2021-07-0808 July 2021 Enclosure 3: Sample NRC Form 398 Personal Qualification Statement - Licensee ML21181A3912021-06-30030 June 2021 301 Corporate Notification Letter IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release ML21053A0322020-11-10010 November 2020 301 Corporate Notification Letter ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) ML20148M3712020-04-27027 April 2020 ADAMS-2A-2 Vogtle-3 2020-301 Final Items Public ML20118C1532020-04-27027 April 2020 3 2020-301 Exam Report Items - RO Written Exam (Public).Pdf ML20118C1552020-04-27027 April 2020 3 2020-301 Exam Report Items - SRO Written Exam (Public).Pdf ML20148M3672020-04-27027 April 2020 ADAMS-2B Vogtle-3 2020-301 Public ML20148M3682020-04-27027 April 2020 ADAMS-2A-1 Vogtle-3 2020-301 Draft Items Public ML20148M3722020-04-27027 April 2020 ADAMS-2A-3 Vogtle-3&4 2020-301 Final Admin Items Public.Pdf NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments 2024-08-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24214A0022024-08-0101 August 2024 Final SRO Written Exam Vogtle Units 3 and 4 2024-301 Combined (Redacted for Public Release) ML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) ML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) ML23229A1472023-06-22022 June 2023 301, 2B - Exam Administrative Items ML23159A0802023-06-0808 June 2023 301 Post Examination Comments NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam ML22280A0542022-10-0606 October 2022 Notification of Licensed Operator Initial Examination 05000424/2023301 and 05000425/2023301 ML22213A0482022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 ML22136A2082022-05-16016 May 2022 2B Exam Administrative Items- Normal Release NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML22068A2112022-03-0909 March 2022 301 AP-1000 Written Exam Approval Letter ML22010A1962022-01-10010 January 2022 301 Exam Administrative Items (Normal Release) (ADAMS-2B) ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21313A1802021-11-0909 November 2021 Operator Licensing Examination Approval 05000424/2021301 and 05000425/2021301 ML21286A6692021-10-13013 October 2021 301 2B ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items ML21216A0992021-08-0404 August 2021 File 2B Administrative Items ML21189A1562021-07-0808 July 2021 Enclosure 2: Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test ML21181A3912021-06-30030 June 2021 301 Corporate Notification Letter IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML21053A0322020-11-10010 November 2020 301 Corporate Notification Letter ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) ML20148M3722020-04-27027 April 2020 ADAMS-2A-3 Vogtle-3&4 2020-301 Final Admin Items Public.Pdf ML20148M3682020-04-27027 April 2020 ADAMS-2A-1 Vogtle-3 2020-301 Draft Items Public ML20148M3712020-04-27027 April 2020 ADAMS-2A-2 Vogtle-3 2020-301 Final Items Public NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments ML21074A3822019-08-29029 August 2019 ADAMS 2B ML19239A4582019-08-27027 August 2019 Farley 2019 Post Examination Comments and Documentation ML19218A3792019-08-0606 August 2019 Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 ML19204A3402019-07-22022 July 2019 Notification of Licensed Operator Initial Examination (05200025/2020301) ML19115A2992019-04-25025 April 2019 301 ADAMS-2D Exam Administrative Items ML19115A2892019-04-25025 April 2019 301 ADAMS-2C Exam Administrative Items ML19115A2872019-04-25025 April 2019 301 ADAMS-2B Exam Final Items 2024-08-01
[Table view] |
Text
- Southern Nuclear Cheryl A. Gayheart Regulatory Affairs Director 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5316 tel 205 992 7601 fax APR 2 3 2018 cagayhea@ southernco.com Docket Nos.: 50-321 50-348 50-424 NL-18-0550 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant- Units 1 and 2 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Response to Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On March 26, 2018, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2018-02, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2018-02 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2020-2023.
Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Edwin I. Hatch Nuclear Plant- Units 1 and 2, Joseph M. Farley Nuclear Plant- Units 1 and 2, and Vogtle Electric Generating Plant- Units 1and 2. The estimates provided represent SNC's current understanding, but are subject to possible change in the future. These enclosures supersede previous, similar RIS responses.
This letter contains no NRC commitments or proprietary information. If you have any questions regarding the material of this submittal, please contact Jamie Coleman at (205) 992-6611.
Respectfully submitted, Cheryl It Gayheart Regulatory Affairs Director CAG/kgl/cg
U.S. Nuclear Regulatory Commission NL-18-0550 Page2
Enclosures:
- 1. NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2
- 2. NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant - Units 1 and 2
- 3. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2 cc: Regional Administrator, Region II NRR Project Manager- Farley, Hatch, Vogtle 1 & 2 Senior Resident Inspector- Farley, Hatch, Vogtle 1 & 2 NRR Project Manager- Farley, Hatch, Vogtle 1 & 2 RType: Farley=CFA04.054, Hatch=CHA02.004, Vogtle=CVC7000
Joseph M. Farley Nuclear Plant- Units 1 and 2 Response to Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operating Licensing Examinations Enclosure 1 NRC Form 536 Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1 and 2
NRCFORM536 U.S. NUCLEAR REGUlATORY COIIIIJSSION APPROVED BY 0118: NO. 31~31 EXPiRiES: 11183tl72mD i1U1..:ml1) r~~ ES!imil!dta:m!a IB~ 111 GZEJiliwllbl!his ~ ,lllfDnnlllml alii!!CiirJIIIII!QUI!C: nlli:!uc Ths
'-~'*:'
OPERATOR UCENSING Jdlcana!icD cdll!di:ll is ....., Ill . - ballliSis 21111 ll1!li:IUilli!S b qllli2IDr ll!l:llll!lllillmls Semi
- ~ ~ Rlgl!lliqg bme!> ei!II
- ID Go b ~ Sl!lflii3!S elmrdl ~ R'l\1. IllS. NlJiil5lr
......'/ EXAMINATION DATA Ragdl;jiDiy Cll:mni!lsiarl, ~ llC3lli!Dmli, IDI/by e<mall Go ~~P.
zd ID 112 0e:st 01rar, oau a11111cc:1m1o am~~l111!aft, ~ J;I21:2. ~ Olb
~ /llanag!md alii! 8IJtd. ~DC 2D!iil1 Ua - III!IE!IIIIz> *~ am 111i!c:malDl fa:ledia!IID!slllll di!PaJ a Clllldy GM OUB a:dltt IWI!b!r, llhe llllRC llllaJmd! c::::n!m:/1 a~.
alll!a~islllll~ID~~Ibe~m~~
FACIUTY NRC REGION
~ M. Farley Nudear Plants- Units 1 and 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE II II I
CY2020 CY 202I cv2022 cv2023 PROPOSED NUMBER ESTIMATED NUMBER OF UCENSEE-PREPARED 1 I 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2020 CY202I CY2022 CY2023 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 8 8 8 0 NUMBER OF SENIOR REACTOR 10 9 9 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 I 1 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 6/15/20 6/1 4/21 12/5/22 N/A ALTERNATE DATE 6/22/20 6/21/21 I2/ I2/22 N/A NRC FORM 536 (11*2017)
Edwin I. Hatch Nuclear Plant- Units 1 and 2 Response to Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operating Licensing Examinations Enclosure 2 NRC Form 536 Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 and 2
fmC FORIIII536 U.S. NUCLEAR REGUlAlORY' OOJIM!SSION Af'IF'Rm1at BY 0118: NO. 3150-0131 IEXIPIIRES:: 111l'13D'IZD2D r(n1Mi!Dlf'7,)
/~ ~lburilell IPBf" ll!SIIJI1SilliDfi10RiiiJ ..tth tlhis Wlurita1y irffDrrniltcnllldliecfklnll8qUest ~!hour lfhis
~
OPERATOR UCENSING irffarrnatiDil l!ldiBilicn is il$111 :m pta~~ lbuilgs1s emil . . _ iiDr qam- iOOITiinl!tJ:Jr :senti liDIIUII!Irds ~ lburtlen estimD 'ID tlhe lnbmation Sentlles !BamCh ({ir-:2 !FIG), l.J:S !NuClear
\WB) EXAMINA110N DATA
- ~ *.** Ocmrmssicn, 'Wasliir9fon, iDC2!l55Sml1 , a~ e;nall:m lnblidliictsR!scllllll!@nrtp, and'IDtlhe a:leSk Oifo!r. Oftiledilnfl:m1ati:ma~ ~n, iliiElllB-nll2D2, 1(!11SD!D!13'1), 1Dffm til \llanaglment and &ilgat. WaSh~ OC 2DSD3. Bl a m!iiiiS IIS!IIIl 'ID tin!Pese ;an tiriforrnation m!lleli!Jcn ilbs ll1:il~a ~ Wiilid 0Wil oonlnll cumi:Jer, tlheiliiRC1111i!YII1:ilmndutl! a!!jpDIISDI',
i111111a p!ESCntis mot~ired !DteSJXllld :kl,lheiin!ormidicn <<:Dllellfiln.
FACUlTY NRCREG10N Edwin I. Hatch Nuclear Plants - Units 1 and 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I II I
PROPOSED NUMBER CY2020 CY 2021 CY 2022 cv2o23 E5nMATED NUMBER OF UCENSEE-PREPARED 0 1 0 1 EXAMINATIONS E5nMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR OPERATORS 0 10 0 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 1 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08/09/2021 N/A 08/07/2023 ALTERNATE DATE N/A 08/ 16/2021 N/A 08/1 4/2023 NRC FORM 536 (11-2017)
Vogtle Electric Generating Plant- Units 1 and 2 Response to Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operating Licensing Examinations Enclosure 3 NRC Form 536 Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1 and 2
NRC FORM 53& U.S. NUa...EAR RfGln.AlORY COIIIIISS10N APPROVm BY 0118: NO. 31151).011311 EJCIAIICES:: 111l'/3Dml20
~3~-20~7.1
/-....~ Eslirnal!ltl lbul"tBn fllllt'~IID<lllllllii!Y .wttiltlliis'llllllrrilley irtlonm!tiDnmDIIBclicn 'fUIIIII5!: ~ ihoiJ[ ll'!his
' OPERATOR UCENSING IP/ar1
~ inlcnniltiJn a!IBilkln iis ll$llll liD ibui!!IBI5 <llllif il5llJIIII5 liD" <lliJ!IQIIDr !llG!IIlination Sent!
~ IIDIIlft'enls ~ lb&men estimii1e i1D lthe llnbrnatiOil Seniioes iBmrl!b ({:r"'l! IFill), D:S ~lsr EXAMINAnON DATA
~ 0:
... t Rsg1l1alay Ocrmiissbl, <Washir!glon, ~ . <a II!¥ e;mall llc ltnlDccl1eai5!RI!sclliiiB@nr&p, and !ID lthe !DeSk Olfmr, Olrmllil llnlcrmBti:m <1lllif !Re!IUimrH 11l!ails, INElllS-nll21l2, (jli5D:1311),otrm Cf IManagemel1t and re~ 'Wahir~tm, C 20503. Ha tmllilru; WSI!I! IID irr1Pase an inlcnnalian Dlilledion ate; mt dil;play a ~ 'lllilitl OMS a~ntxol ii\UIIIber, lthelliiiE lllliiY nctmntllld<Dr3!PDIISU, and apncn iis mtrequiad IIDll!!!lllnil liD, l!he 'inlormaticnlclillectiDn.
FACIUTY NRCREG10N I~ I i
VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2020 CY 2021 CY 2022 cv2o23 PROPOSED NUMBER ESTIMATED NUMBER OF UCENSEE~EPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2020 CY2021 CY2022 CY2023 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS
- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 05/17/2021 NIA 05/08/2023 ALTERNATE DATE N/A 05/24/2021 N/A 05115/2023 NRC FORM 536 (11-2017)