NL-09-1739, Supplemental Information Regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2), Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) and VEGP-ISI-ALT-04, Version 2, Alternative in Accordance with 10 CFR 50.55a(a)(3)(i)

From kanterella
Jump to navigation Jump to search

Supplemental Information Regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2), Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) and VEGP-ISI-ALT-04, Version 2, Alternative in Accordance with 10 CFR 50.55a(a)(3)(i)
ML093000084
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/26/2009
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-1739
Download: ML093000084 (9)


Text

Southern NI!clea7 Operrlljll~ Company. illc SOUTHERN'\

October 26, 2009 COMPANY Docket Nos.: 50-424 NL-09-1739 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Unit 1 & 2 Supplemental Information Regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2),

Relief Request in Accordance With 10 CFR 50.55a(g)(5)(iii) and VEGP-ISI-ALT 04, Version 2, Alternative in Accordance With 10 CFR 50.55a(a)(3)(i)

Ladies and Gentlemen:

On April 23, 2009, Southern Nuclear Company (SNC) submitted relief request VEGP-ISI-RR-01 which requests relief from performing strand testing on Vogtle Unit 2 containment tendons, applicable for the 3 rd inservice inspection interval.

Per teleconference on July 24,2009, the NRC staff acknowledged RR-L-2 submitted by SNC on April 5, 1999 and approved by the NRC on June 16, 2000 which approved SNC request to align containment tendon schedules for Unit 1 and Unit 2 for the second inspection interval. The staff requested SNC submit a similar request for the 3rd inspection interval.

On July 29, 2009, SNC received a request for additional information (RAI) letter, which contained three (3) questions.

On September 9, 2009, SNC submitted responses to July 29, 2009 RAI letter.

This response contained VEGP-ISI-ALT-04, Version 1, which proposed an administrative Structural Integrity Test (SIT) date to allow SNC to align the testing schedules for IWL-2500 examinations required by IWL-2410(a) and IWL-2420(a).

Per teleconference on October 9, 2009 and confirmed by October 19, 2009 letter, NRC staff has requested SNC provide supplemental information in accordance with the L1C-109 process. The October 19, 2009 letter requested the information by October 26,2009, however in accordance with the LlC-109 process, 13 working days from October 9, 2009 would be October 28, 2009. This was confirmed by NRC staff via telecom on October 20, 2009. contains the SNC responses to the request for supplemental information.

U. S. Nuclear Regulatory Commission NL-09-1739 Page 2 contains VEGP-ISI-ALT-04, Version 2, proposed alternative in accordance with 10 CFR 50.55a(a)(3)(i). VEGP-ISI-ALT-04 requests approval to align Unit 1 and 2 Class CC testing schedules. The proposed alternative contained in VEGP-ISI-ALT -04 would apply to the 3 fd inservice inspection interval and all subsequent inspection intervals for the remainder of plant operating life.

SNC requests approval by May 1, 2010 to support testing scheduled for summer 2010.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely,

~~~

M. J. Ajluni Nuclear Licensing Manager MJAlTAH/lc

Enclosures:

1. Supplemental Information
2. VEGP-ISI-ALT-04, Version 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. T. Tynan, Vice President - Vogtle Ms. P. M. Marino, Vice President - Engineering RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Ms. D. N. Wright, NRR Project Manager - Vogtle Mr. M. Cain, Senior Resident Inspector - Vogtle

Vogtle Electric Gen~rating Plant - Unit 1 & 2 Supplemental Information regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2),

Relief Request in Accordance With 10 CFR SO.SSa(g)(S)(iii) and VEGP-ISI ALT -04, Version 2, Alternative in Accordance With 10 CFR SO.SSa(a)(3)(i)

Enclosure 1 Supplemental Information

Vogtle Electric Generating Plant - Unit 1 & 2 Supplemental Information regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2), Relief Request in Accordance With 10 CFR 50.55a(g)(5)(iii) and VEGP-ISI-AL T-04, Version 2, Alternative in Accordance With 10 CFR 50.55a(a)(3)(i)

Enclosure 1 NRC staff has requested SNC provide supplemental information regarding:

1. The applicable codes for which the alternative is proposed.

SNC response:

Per VEGP-ISI-ALT -04, Version 1, SNC proposed an alternative to the IWL-2410(b) Concrete inspection schedule and IWL-2420(b) testing schedule for the Unbonded Post-Tensioning Systems. After further review, IWL-2420(b) provides the testing schedule for single unit sites. As indicated in VEGP-ISI-ALT-04, Version 2, the proposed alternative is applicable to IWL-2410(b) Concrete inspection schedule and IWL-2421(b)

Unbonded Post-Tensioning Systems testing schedule for 2 unit sites.

2. Clarification of the proposed alternative testing schedule.

SNC response:

Table 1 of VEGP-ISI-ALT-04, Version 2 provides the schedule and scope of all required IWL-2500-1 examinations for Units 1 and 2 through 2030.

3. Additional technical information as to why the proposed alternative concrete inspection schedule provides an acceptable level of quality and safety.

SNC response:

Based on the language contained in IWL-2421 (b) and NRC approval of Farley RR-57 and 58 provided in March 28, 2006, the testing schedule contained in VEGP-ISI-AL T-04, Version 1 indicated VogUe would perform IWL-2500-1 Category L-A Concrete inspections on a ten year frequency.

After further review of industry standards, SNC will perform the IWL-2500 1 Category L-A Concrete inspections on a five year frequency as required by IWL-2410(b).

Vogtle Electric Generating Plant - Unit 1 & 2 Supplemental Information regarding VEGP-ISI-RR-01, Version 1.0 (Unit 2),

Relief Request in Accordance With 10 CFR SO.SSa(g)(S)(iii) and VEGP-ISI ALT-04, Version 2, Alternative in Accordance With 10 CFR SO.SSa(a)(3)(i)

Enclosure 2 VEGP-ISI-ALT-04, Version 2

Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY VEGP-ISI-ALT-04, VERSION 2.0 PROPOSED ALTERNATIVE IN ACCORDANCE WITH 10 CFRSO.SSa(a)(3)(i) i Plant Site Vogtle Electric Generating Plant -Units 1 and 2 Unit:

Interval-Interval 3rd lSI Interval, May 31, 2007 through May 30, 2017 Dates:

Requested Date for Approval is requested by May 1, 2010 Approval and Basis:

. .- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 ASMECode The exterior portion of the VEGP-1 and 2 Containment Buildings.

Components fabricated from concrete and their post-tensioning systems (ASME Section I:

Affected: XI, Table IWL-2500-1, Category L-A and L-B).

Applicable Code ASME Section XI, 2001 Edition through the 2003 Addenda Edition and Addenda:

IWL-2410(a) states: "Concrete shall be examined in accordance with IWL-2510 at 1,3, and 5 years following the completion of the containment Structural Integrity Test CC-6000 and every 5 years thereafter."

IWL-2421 (b) states: "When the conditions of IWL-2421 (a) are met, the inspection dates and examination requirements may be as follows.

Applicable (1) For the containment with the first Structural Integrity Test, all examinations required by IWL-2500 shall be performed at 1, 3, and 10 Code years and every 10 years thereafter. Only the examinations required by Requirements: IWL-2524 and IWL-2525 need be performed at 5 and 15 years and every 10 years thereafter.

(2) For each subsequent containment constructed at the site, all examinations required by IWL-2500 shall be performed at 1, 5, and 15 years and every 10 years thereafter. Only the examinations required by IWL-2524 and IWL-2525 need be performed at 3 and 10 years and every 10 years thereafter."

The Unit 1 Structural Integrity Test (SIT) was completed on August 23, 1986 and the Unit 2 SIT was completed on November 14, 1988. Based on these dates, IWL-2421 (b)(1) and (2) would require all IWL-2500 exams for Unit 1 in 2016 (SIT + 30-years) and Unit 2 in 2013 (SIT + 25 years). Therefore, this alternative is being proposed to allow VEGP to Reason for align the schedule for IWL-2510 and IWL-2520 examinations for both Request: units.

10CFR50.55a was revised in 1996 requiring containment examinations in accordance with ASME Section XI, Subsection IWE and IWL. With this rule change, the VEGP Technical Specifications were amended to I reference containment examinations in accordance with IWE and IWL.

E2-1

Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY VEGP-ISI-ALT-04, VERSION 2.0 PROPOSED ALTERNATIVE IN ACCORDANCE WITH 10 CFR 50.55a(a)(3)(i)

Since IWL-2420 requires examinations based upon SIT date, SNC proposes an alternative equivalent to that of previous Technical Specification amendments which have been superseded by the ASME Section XI Code.

The last complete IWL-2500 examinations were performed in 2000 for Unit 1 and 2005 for Unit 2 and only the IWL-2524 and IWL-2525 examinations were performed in 2000 for Unit 2 and 2005 for Unit 1.

Therefore, SNC proposes an examination frequency equivalent to the requirements of the referenced ASME Section XI Code on a slightly altered schedule by "re-baselining" the IWL-2500 examinations in 2010 for both VEGP units. "Re-baselining" results in the examination schedule shown in the table on page 3 below.

VEGP Unit 1 and Unit 2 containments utilize the same pre-stressing system, are essentially identical in design (except Unit 2 tendons were not designed to allow detensioning) and are similarly exposed to the same environmental conditions. The post tensioning operations for VEGP-1 were completed on April 26, 1986 and VEGP-2 on December 31, 1986. Therefore, the VEGP units meet the criteria of IWL-2421 (a) allowing for examinations per IWL-2421 (b).

SNC is proposing to establish a "re-baselining" date for scheduling the 3rd Proposed lSI Interval and subsequent lSI Interval Subsection IWL examinations.

This "re-baselining" date has no impact on the code required examination Alternative frequencies for either unit but will allow VEGP to schedule both unit's and Basis for tendon and strand testing during the same time period. Being able to Use: perform tendon and strand testing on both units during the same time period decreases the cost for mobilization of contractor personnel, increases the efficiency of equipment and personnel resources, allows for more standardization and application of lessons learned between units and still provides and acceptable level of quality and safety for the containment structures.

Table 1 indicates that: 1) Subsection IWL, Table IWL-2500-1, Category L A, Item L 1.11 will be performed on a 5 year frequency, 2) Subsection IWL, Table IWL-2500-1, Category L-B Items will be performed on a 10 year frequency, and 3) Subsection IWL, Table IWL-2500-1, Category L-B, Items L2.30, L2.40 and L2.50 will be performed on a 5 year frequency as required by the code.

Based on the tendon lift off schedule being approved by a previous Technical Specification amendment and the proposed examination frequency being equivalent to that required by the code, this alternative should be granted under 10 CFR 50.55a(a)(3)(i) because the proposed alternative continues to provide an acceptable level of quality and safety.

Alternative 3rd lSI Interval, beginning May 31, 2007 and all subsequent lSI intervals.

Duration:

Precedents: Farley Alternative RR-58 approved via NRC SER dated March 28, 2006.

E2-2

Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY VEGP-ISI-ALT-04, VERSION 2.0 PROPOSED ALTERNATIVE IN ACCORDANCE WITH 10 CFR 50.55a(a)(3)(i)

VEGP Technical Specifications SR 3.6.1.2 and 5.5.6 (prior to

References:

Amendments 147 (Unit 1) and 127 (Unit 2), dated 12/12/06) previously implemented the alternative examination schedule for lift off testing.

Status: Awaiting NRC approval.

E2-3

Enclosure 2 SOUTHERN NUCLEAR OPERATING COMPANY VEGP-ISI-ALT-04, VERSION 2.0 PROPOSED ALTERNATIVE IN ACCORDANCE WITH 10 CFR SO.SSa(a)(3)(i)

Table 1 - Proposed IWL Examination Schedule Re-Baselil1~ng Date of 0810 1/20 I 0 for Appl ication of FutureI~§xa.minations (L)

Unit 1 All Table IWL- Only Table IWL- All Table IWL- Only Table IWL- All Table IWL-

  • 2500-1, Cat. L-A & 2500-1, Cat. L-A, 2500-1, Cat. L-A & 2500-1, Cat. L-A, 2500-1, Cat. L-A &

L-B Item L 1.11 + Cat L L-B Item L 1.I I + Cat. L-B B, Item L2.30, L2.40 L-B, Item L2.30, and L2.50 L2.40 and L2.50 08/01110 (I) 08/01liS (1) 08/0 lI20 (I) 08/01l2S (I) 08/0 1I30 (l)

Unit 2 All Table IWL- Only Table IWL- All Table IWL- Only Table IWL- All Table IWL-2500-1, Cat. L-A & 2500-1, Cat. L-A, 2500-1, Cat. L-A & 2500-1, Cat. L-A, 2500-1, Cat. L-A &

L-B as modified by Item L 1. I 1 + Cat. L-B as modified by Item L 1.11 + Cat. L-B as modified by VEGP-ISI-RR-O I L-B, Item L2.30, VEGP-ISI-RR-Ol L-B, Item L2.30, VEGP-ISI-RR-OI L2.40 and L2.50 L2.40 and L2.50 08/01/10 (ll 08/0IIIS (I) 08/0 1I20 (I) 08/0 1I2S (I) 08/0 1I30 (I)

Foot notes:

(1) +/- 1 year means that examinations shall commence no earlier than 1 year prior to the specified date and shall be completed no more than 1 year after specified date (as allowed by IWL-241 O(c) and IWL-2420(c)).