NL-04-114, Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan

From kanterella
Jump to navigation Jump to search

Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan
ML042590032
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/09/2004
From: Dacimo F
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, NRC/FSME
References
NL-04-114, TAC MC2929, TAC MC2930
Download: ML042590032 (3)


Text

ALif Entergy Nuclear Northeast

.SAFEGUARDS INFORMATION Indian Point Energy Center 450 Broadway, GSB v=Enteqoy RO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration September 9, 2004 Indian Point Unit Nos. 1, 2, and 3 Docket Nos. 50-03, 50-247, and 50-286 NL-04-114 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-PI-17 Washington, D.C. 20555-0001

SUBJECT:

Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan (TAC Nos. MC2929 and MC2930)

Dear Sir:

Entergy Nuclear Operations, Inc., (ENO), has responded to requests for additional information (RAIs) (References 1 through 4). Our responses to these RAls (References 5 through 11) identified changes to the Security Plan submitted for NRC review on April 29, 2004. This letter re-submits the plan in its entirety in Attachment 1. The language presented in our responses has been incorporated into the plan. During our final review changes were identified that were not addressed in our prior correspondence. These changes were editorial and substantive in nature. Attachment 2 identifies substantive changes and where they have been previously accepted by NRC. The submittal consists of this letter and a single CD-ROM. The CD-ROM contains four files each presented in pdf format:

001- Transmittal Letter NL-04-114.pdf 1199 kbytes 002- NL-04-114Attachment I.pdf 1247 kbytes 003- NL-04-114Attachment 2.pdf 66 kbytes 004- Signed Security Plan Cover Page.pdf 352 kbytes This letter contains no new commitments. If you have any questions or require additional information, please contact Mr. Patric W. Conroy, Manager, Licensing at (914) 734-6668.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 9, 2004.

Fred R. Dacimo Site Vice President Indian Point Energy Center SAFEGUARDS INFORMATION NOTICE: ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES -DECONTROLLED."

1/

SAFEGUARDS INFORMATION Docket Nos. 50-03, 50-247, and 50-286 NL-04-114 Page 2 of 3

References:

1. NRC Letter to Entergy, "Indian Point Nuclear Generating Station, Units 2 and 3 - Request For Additional Information Re: Security Plan Sections 10-19 (TAC Nos. MC2929 and MC2930)," Dated June 16, 2004
2. NRC Letter to Entergy, "Indian Point Nuclear Generating Station, Units 2 and 3 - Request For Additional Information Re: Security Plan Sections 1-9 (TAC Nos. MC2929 and MC2930)," Dated June 25, 2004
3. NRC Letter to Entergy, Indian Point Nuclear Generating Station, Units 2 and 3 - Request For Additional Information Re: Training and Qualification Plan (TAC Nos. MC2929 and MC2930)," Dated July 9, 2004
4. NRC Letter to Entergy, "Indian Point Nuclear Generating Station, Units 2 and 3 - Request For Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos.

MC2929 and MC2930)," dated July 23, 2004

5. Entergy letter to NRC, NL-04-082, Response To Request For Additional Information Re: Indian Point Units 1, 2 and 3 Security Plan Sections 10-19 (TAC Nos. MC2929 and MC2930)," dated July 8, 2004.
6. Entergy letter to NRC, NL-04-085, "Response To Request For Additional Information Re: Indian Point Units 1, 2 and 3 Security Plan Sections 1-9 (TAC Nos. MC2929 and MC2930)," dated July 14, 2004.
7. Entergy letter to NRC, NL-04-089, Response to Request For Additional Information Re: Indian Point Units 1, 2 and 3 Security Plan, Training and Qualification Plan (TAC Nos. MC2929 and MC2930)" dated July 26, 2004
8. Entergy letter to NRC, NL-04-094, 'Supplemental Response To Request For Additional Information Re: Indian Point Units 1, 2 and 3 Security Plan Sections 1-19 (TAC Nos. MC2929 and MC2930)," dated August 4, 2004
9. Entergy letter to NRC, NL-04-097, "Response to Request For Additional Information Re: Indian Point Units 1, 2 and 3 Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2929 and MC2930), Dated August 12, 2004
10. Entergy Letter to NRC, NL-04-102, "Supplemental Response to Request For Additional Information Re: Indian Point Units 1, 2 and 3 Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos.

MC2929 and MC2930)," Dated August 19, 2004

11. Entergy Letter to NRC, NL-04-107, Supplemental Response to Requests For Additional Information Re: Indian Point Units 1, 2 and 3 Security Plan (TAC Nos. MC2929 and MC2930)," Dated August 27, 2004 cc: next page SAFEGUARDS INFORMATION NOTICE: ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."
  • 1 SAFEGUARDS INFORMATION Docket Nos. 50-03, 50-247, and 50-286 NL-04-114 Page 3 of 3 w/o attachments cc:

Mr. Samuel J. Collins Resident Inspectors' Office Regional Administrator-Region I U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Indian Point Unit 3 475 Allendale Road P.O. Box 337 King of Prussia, Pennsylvania 19406-1415 Buchanan, NY 10511-0337 Mr. Patrick D. Milano, Sr. Project Manager Mr. Robert L. Fretz Project Directorate I Security Plan Review Team Division of Licensing Project Management Project Directorate II Office of Nuclear Reactor Regulation Division of Licensing Project Management U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-8-C2 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Mail Stop 8-B2 Washington, D.C. 20555-0001 Mr. Michael K. Webb, Project Manager Resident Inspectors' Office Project Directorate IV U.S. Nuclear Regulatory Commission Division of Licensing Project Management Indian Point Unit 2 Office of Nuclear Reactor Regulation P.O. Box 59 U.S. Nuclear Regulatory Commission Buchanan, NY 10511-0059 Mail Stop 0-7-Dl Washington, D.C. 20555-0001 SAFEGUARDS INFORMATION NOTICE: ATTACHMENTS I AND 2 CONTAIN "SAFEGUARDS INFORMATIONW AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENTS 1 AND 2 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."