Request for Additional Information Security Plan Sections 1-9
ML041810118
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/25/2004
From: Robert Fretz
NRC/NRR/DLPM/LPD2
To: Dacimo F, Marcussen F
Entergy Nuclear Operations
Fretz R, NRR/DLPM, 415-1324
References
TAC MC2929, TAC MC2930
Download: ML041810118 (6)


Text

SAFEGUARDS INFORMATION June 25, 2004 Mr. Fred R. Dacimo, Site Vice President c/o Mr. Fred Marcussen, Security Manager Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Station, Units 2 and 3 295 Broadway, Suite 1, Mail Stop K-IP-4331 Buchanan, NY 10511

SUBJECT:

INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TAC NOS. MC2929 AND MC2930)

Dear Mr. Dacimo:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Indian Point Nuclear Generating Station, Units 2 and 3. The Nuclear Regulatory Commission staff is reviewing your April 29, 2003 (sic), submittal, as supplemented on June 1, 2004, and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 (except Section 9.4.1) of your physical security plan.

Please respond to the enclosed RAI within 10 days from receipt of this letter.

WARNING: Violation of Section 147 of the Atomic Energy Act, NOTICE: The enlcosed information contains Safeguards Safeguards Information is subject to Information. Upon separation from the Enclosure, this Civil and Criminal Penalties letter is DECONTROLLED.

SAFEGUARDS INFORMATION

F. Dacimo If circumstances result in the need to revise the target response date, please contact me at (301) 415-3048.

Sincerely,

/RA/

Robert J. Fretz, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/o encl: See next page

F. Dacimo If circumstances result in the need to revise the target response date, please contact me at (301) 415-3048.

Sincerely,

/RA/

Robert J. Fretz, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

PUBLIC SPRT R/F J. Nakoski J. Peralta C. Hawes R. Fretz OGC ACRS P. Milano R. Laufer C. Holden C. Bixler, RI ADAMS Accession Number: ML041810118 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME RFretz CHawes JPeralta JNakoski DATE 06/25/04 06/25/04 06/25/04 OFFICIAL RECORD COPY

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Columb Senior Vice President and Director of Oversight Chief Operating Officer Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. James Comiotes Mr. Fred Dacimo Director, Nuclear Safety Assurance Site Vice President Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 295 Broadway, Suite 1 450 Broadway, GSB P.O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. Patric Conroy Mr. Christopher Schwarz Manager, Licensing General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. Indian Point Energy Center Indian Point Energy Center 295 Broadway, Suite 1 295 Broadway, Suite 2 P. O. Box 249 P.O. Box 249 Buchanan, NY 10511-0249 Buchanan, NY 10511-0249 Mr. John M. Fulton Mr. Danny L. Pace Assistant General Counsel Vice President Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Regional Administrator, Region I Mr. Brian OGrady U.S. Nuclear Regulatory Commission Vice President, Operations Support 475 Allendale Road Entergy Nuclear Operations, Inc. King of Prussia, PA 19406 440 Hamilton Avenue White Plains, NY 10601 Senior Resident Inspectors Office Indian Point 2 Mr. John McCann U. S. Nuclear Regulatory Commission Director, Nuclear Safety Assurance P.O. Box 59 Entergy Nuclear Operations, Inc. Buchanan, NY 10511-0038 440 Hamilton Avenue White Plains, NY 10601

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Senior Resident Inspectors Office Mr. William DiProfio Indian Point 3 PWR SRC Consultant U. S. Nuclear Regulatory Commission 139 Depot Road P.O. Box 337 East Kingston, NH 03827 Buchanan, NY 10511-0337 Mr. Dan C. Poole Mr. Peter R. Smith, President PWR SRC Consultant New York State Energy, Research, and 20 Captains Cove Road Development Authority Inglis, FL 34449 17 Columbia Circle Albany, NY 12203-6399 Mr. William T. Russell PWR SRC Consultant Mr. Paul Eddy 400 Plantation Lane Electric Division Stevensville, MD 21666-3232 New York State Department of Public Service Mr. Alex Matthiessen 3 Empire State Plaza, 10th Floor Executive Director Albany, NY 12223 Riverkeeper, Inc.

25 Wing & Wing Mr. Charles Donaldson, Esquire Garrison, NY 10524 Assistant Attorney General New York Department of Law Mr. Paul Leventhal 120 Broadway The Nuclear Control Institute New York, NY 10271 1000 Connecticut Avenue NW Suite 410 Mayor, Village of Buchanan Washington, DC, 20036 236 Tate Avenue Buchanan, NY 10511 Mr. Karl Coplan Pace Environmental Litigation Clinic Mr. Ray Albanese 78 No. Broadway Executive Chair White Plains, NY 10603 Four County Nuclear Safety Committee Westchester County Fire Training Center Mr. Jim Riccio 4 Dana Road Greenpeace Valhalla, NY 10592 702 H Street, NW Suite 300 Ms. Stacey Lousteau Washington, DC 20001 Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Robert D. Snook Assistant Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 Mr. David Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601