March 11, 2026

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2025006)

Dear Robert Schuetz:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2025, through December 31, 2025. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was partially completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase due to the impact on federal government operations because of the federal government shutdown from October 1, 2025, to November 12, 2025, during which only excepted activities were performed.

Columbia Generating Station began the assessment period in the Regulatory Response Column, the second highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, based on two White findings in the Occupational Radiation Safety cornerstone, as documented in inspection reports, 05000397/2023090 (ADAMS Accession No.

ML23111A237) dated June 1, 2023, and 05000397/2023093 (ADAMS Accession No.

ML23276B477) dated November 1, 2023. On February 25, 2025, the NRC completed a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, documented in NRC Inspection Report Columbia Generating Station - 95001 Supplemental Inspection Report 05000397/2024040 and Follow-Up Assessment Letter (ADAMS Accession No. ML25073A062)

and the station was transitioned to the Licensee Response Column of the Action Matrix.

The NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2027. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This plan also includes one non-routine inspection in calendar year 2026 which is, inspection procedure IP 71003, Post-Approval Site Inspection for License Renewal, scheduled April 2026.

The regional administrator has approved implementation of this inspection procedure.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at (817) 200-1146 with any questions you have regarding this letter.

Sincerely, Patricia J. Vossmar, Acting Director Division of Operating Reactor Safety Docket No. 05000397 License No. NPF-21 Enclosure:

Inspection Plan cc w/ encl: Distribution via GovDelivery Subscriber Signed by Vossmar, Patricia on 03/11/26

ML26064A028 SUNSI Review By: AAS Non-Sensitive and Publicly Available Sensitive and Non-Publicly Available OFFICE D:DORS NAME PVossmar SIGNATURE

/RA/

DATE 03/11/26

Site Inspection Activity Plan Columbia Generating Station 01/01/2026 - 12/31/2027 Unit Start End Activity CAC Title Staff Count Age-Related Degradation Inspection - Columbia Generating Station

2 2/23/2026 2/27/2026 IP 71111.21N.04 001832 Age-Related Degradation CGS 2026 INITIAL EXAM

2 1/25/2026 1/31/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

3/1/2026 3/7/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Security Protective Strategy (71130.05) and Target Sets (71130.14)

2 3/16/2026 3/19/2026 IP 71130.05 000737 Protective Strategy Evaluation

3/16/2026 3/19/2026 IP 71130.14 000743 Review of Power Reactor Target Sets EP Exercise & PI Inspection (2026) - CGS

2 3/23/2026 3/27/2026 IP 71114.01 000716 Exercise Evaluation

3/23/2026 3/27/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes License Renewal-CGS-71003 (Phase 3)

2 4/27/2026 5/1/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP 1,4,PI - CGS

2 5/11/2026 5/15/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

5/11/2026 5/15/2026 IP 71124.04 000728 Occupational Dose Assessment Cybersecurity-CGS

2 6/22/2026 6/27/2026 IP 71130.10 000741 Cybersecurity Security 71130.02/.07/.08

2 8/3/2026 8/6/2026 IP 71130.02 000734 Access Control

8/3/2026 8/6/2026 IP 71130.07 000739 Security Training

8/3/2026 8/6/2026 IP 71130.08 000740 Fitness-For-Duty Program

8/3/2026 8/6/2026 IP 71130.09 001656 Security Plan Changes

8/3/2026 8/6/2026 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection - Columbia

2 10/19/2026 10/23/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

11/2/2026 11/6/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection CGS 2027 INITIAL EXAM

2 11/15/2026 11/21/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1/10/2027 1/16/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EP Program & PI Inspection (2027) - CGS

2 2/8/2027 2/12/2027 IP 71114.02 000717 Alert and Notification System Testing

2/8/2027 2/12/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System Prepared on 3/2/2026 11:41:29 AM 1 of 3

Site Inspection Activity Plan

2/8/2027 2/12/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2/8/2027 2/12/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness

2/8/2027 2/12/2027 IP 71151 001397 Performance Indicator Verification Inservice Inspection-CGS

2 3/22/2027 3/27/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI - CGS

2 3/29/2027 4/2/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3/29/2027 4/2/2027 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

3/29/2027 4/2/2027 IP 71151 000746 Performance Indicator Verification RP 5,6,7,8 - CGS

2 8/2/2027 8/6/2027 IP 71124.05 000729 Radiation Monitoring Instrumentation

8/2/2027 8/6/2027 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

8/2/2027 8/6/2027 IP 71124.07 000731 Radiological Environmental Monitoring Program

8/2/2027 8/6/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security 71130.01/.02/.04

2 8/9/2027 8/13/2027 IP 71130.01 000733 Access Authorization

8/9/2027 8/13/2027 IP 71130.02 000734 Access Control

8/9/2027 8/13/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

8/9/2027 8/13/2027 IP 71130.09 001656 Security Plan Changes

8/9/2027 8/13/2027 IP 71151 001338 Performance Indicator Verification CGS 2027 BRQ

2 8/29/2027 9/4/2027 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Focused Engineering Inspection 1 - CGS

2 9/13/2027 9/17/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)

9/27/2027 10/1/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)

2027 Problem Identification and Resolution Inspection - Columbia

2 10/4/2027 10/8/2027 IP 71152B 000747 Problem Identification and Resolution

10/18/2027 10/22/2027 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CGS

2 10/18/2027 10/22/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

11/15/2027 11/19/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Prepared on 3/2/2026 11:41:29 AM 2 of 3

Site Inspection Activity Plan Columbia Generating Station 01/01/2026 - 12/31/2027 Unit Start End Activity CAC Title Staff Count Columbia ISFSI Triennial Loading inspection (one week on-site, TBD)

4/6/2026 5/8/2026 IP 60855 001001 Operation of an Independent Spent Fuel Storage Installation Security 81311

8/9/2027 8/13/2027 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 3/2/2026 11:41:29 AM 3 of 3