August 18, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR COLUMBIA GENERATING STATION (REPORT 05000397/2025005)

Dear Robert Schuetz:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Columbia Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025, (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented. The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility as indicated in the enclosed inspection plan.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at (817) 200-1144 with any questions you have regarding this letter.

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000397 and 07200035 License No. NPF-21 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Vossmar, Patricia on 08/18/25

ML25226A131

SUNSI Review By: RLB

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE SPE:DORS/PBA BC:DORS/PBA NAME RBywater PVossmar SIGNATURE

/RA/

/RA/

DATE 08/15/25 08/18/25

Site Inspection Activity Plan Columbia Generating Station 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count CGS 93100

2 8/4/2025 8/8/2025 IP 93100 000921 Safety-Conscious Work Environment Issue of Concern Followup Security Access Control (71130.02), Security Plan Changes (71130.09), PIV (71151)

2 8/18/2025 8/22/2025 IP 71130.02 000734 Access Control

8/18/2025 8/22/2025 IP 71130.09 001656 Security Plan Changes

8/18/2025 8/22/2025 IP 71151 001338 Performance Indicator Verification MC&A - CGS

2 9/8/2025 9/12/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

CGS 2025 Biennial PI&R

2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution

9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution CGS 2025 BRQ

2 9/21/2025 9/27/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Protective Strategy (71130.05) and Target Sets (71130.14)

2 10/6/2025 10/10/2025 IP 71130.05 000737 Protective Strategy Evaluation

10/6/2025 10/10/2025 IP 71130.14 000743 Review of Power Reactor Target Sets Age-Related Degradation Inspection - Columbia Generating Station

2 10/20/2025 10/24/2025 IP 71111.21N.04 001832 Age-Related Degradation

11/3/2025 11/7/2025 IP 71111.21N.04 001832 Age-Related Degradation RP 5,8 - CGS

2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation License Renewal-CGS 71003 (Phase 3)

2 11/16/2025 11/21/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal CGS 2026 INITIAL EXAM

2 1/25/2026 1/31/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

3/1/2026 3/7/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EP Exercise & PI Inspection (2026) - CGS

2 3/23/2026 3/27/2026 IP 71114.01 000716 Exercise Evaluation

3/23/2026 3/27/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

3/23/2026 3/27/2026 IP 71151 001397 Performance Indicator Verification RP 1,4,PI - CGS

Prepared on 8/13/2025 1:20:05 PM 1 of 3

Site Inspection Activity Plan

4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

4/27/2026 5/1/2026 IP 71124.04 000728 Occupational Dose Assessment

4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification Cybersecurity-CGS

2 6/22/2026 6/27/2026 IP 71130.10 000741 Cybersecurity Security 71130.02/.07/.08

2 8/3/2026 8/6/2026 IP 71130.02 000734 Access Control

8/3/2026 8/6/2026 IP 71130.07 000739 Security Training

8/3/2026 8/6/2026 IP 71130.08 000740 Fitness-For-Duty Program

8/3/2026 8/6/2026 IP 71130.09 001656 Security Plan Changes

8/3/2026 8/6/2026 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection - Columbia

2 10/19/2026 10/23/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

11/2/2026 11/6/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection CGS 2027 INITIAL EXAM

2 11/15/2026 11/21/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1/10/2027 1/16/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EP Program & PI Inspection (2027) - CGS

2 2/8/2027 2/12/2027 IP 71114.02 000717 Alert and Notification System Testing

2/8/2027 2/12/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2/8/2027 2/12/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2/8/2027 2/12/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness

2/8/2027 2/12/2027 IP 71151 001397 Performance Indicator Verification Inservice Inspection-CGS

2 3/22/2027 3/27/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI - CGS

2 3/29/2027 4/2/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3/29/2027 4/2/2027 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

3/29/2027 4/2/2027 IP 71151 000746 Performance Indicator Verification Prepared on 8/13/2025 1:20:05 PM 2 of 3

Site Inspection Activity Plan Columbia Generating Station 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Columbia ISFSI Triennial Loading inspection (one week on-site, TBD)

3/1/2026 4/30/2026 IP 60855 001001 Operation Of An ISFSI Prepared on 8/13/2025 1:20:05 PM 3 of 3