August 21, 2025 MEMORANDUM TO:
Joshua Borromeo, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Donna Williams, Senior Project Manager /RA/
Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE JULY 17, 2025, PARTIALLY CLOSED PUBLIC MEETING TO DISCUSS PRECONSTRUCTION ACTIVITIES FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0048)
Meeting Information:
Applicant: Oklo, Inc. (Oklo)
Project No.: 99902095 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML25177C557 Applicant Presentation Slides.: ML25199A222 (proprietary) ML25199A223 (public)
Meeting Attendees: See Enclosure 1 for list of meeting attendees.
CONTACT: Donna Williams, NRR/DANU/UAL1 301-415-1322 Enclosures 2 and 3 to this letter contains proprietary information. When separated from the enclosures, this letter is DECONTROLLED.
J. Borromeo 2
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).
On July 17, 2025, a hybrid partially closed meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Oklo Inc. (Oklo). The purpose of the meeting was for Oklo discuss its plan for designating certain activities as pre-construction. Oklo representatives provided an overview of the preconstruction activities for its proposed reactor at the Idaho National Laboratory site and its evaluation of these activities in comparison with the criteria of 10 CFR 50.10.
Oklo presented its proposed scope of preconstruction activities, and the staff asked clarifying questions to understand the safety and regulatory impacts of the activities. For items that are not clearly pre-construction in accordance with the regulations, the staff noted it would consider alternative regulatory approaches (e.g., exemptions).
Oklo stated that, because the site is within Idaho National Laboratory property, an environmental review by the Department of Energy (DOE) is required under the National Environmental Policy Act for pre-construction activities. To support this review, Oklo will provide the scope of pre-construction activities to DOE. Representatives of DOE participated in the meeting.
The NRC staff discussed plans to provide feedback on the scope of activities presented by Oklo.
No regulatory decisions were made as a result of this meeting.
Enclosures:
- 1. List of Attendees
- 2. Meeting Notes (proprietary)
- 3. Table of pre-construction activities (proprietary)
ML25204A142 (Package)
ML25204A140 (Cover Letter and Enclosure 1)
ML25204A138 (Enclosure 2)
ML25204A139 (Enclosure 3)
NRR-106 OFFICE NRR/DANU/UAL1: PM NRR/DANU/UAL1: BC NRR/DANU/UAL1: PM NAME DWilliams JBorromeo DWilliams DATE 7/25/25 8/21/25 8/21/25
List of Meeting Attendees
SUMMARY
OF THE JULY 17, 2025, PARTIALLY CLOSED PUBLIC MEETING TO DISCUSS PRECONSTRUCTION ACTIVITIES FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0048)
Name Organization Katie Wagner U.S. Nuclear Regulatory Commission (NRC)
Alex Siwy NRC Josh Borromeo NRC Daniel Barnhurst NRC Laura Willingham NRC Mary Richmond NRC Jennifer Davis NRC Cayetano Santos NRC Jacquline Tulip NRC Lindsey Renaud PNNL Ann Miracle PNNL Candace de Messieres NRC Trace Orf Oklo, Inc. (Oklo)
Ross Moore Oklo Scott Auerbach Oklo Emma Redfoot Oklo Alex Renner Oklo Andrew Brenner Oklo Christina Reid Oklo Kellen McCarroll Oklo Craig Richins DOE Jason Anderson DOE Carl Friesen DOE