MONTHYEARML22181A0032022-06-17017 June 2022, 23 June 2022, 22 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis Project stage: Request ML22168A0262022-06-17017 June 2022 Preapplication Teleconference with Union Electric Company to Discuss a Spent Fuel Pool License Amendment Request for Callaway Plant, Unit No. 1 Project stage: Meeting ML22174A3472022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis Project stage: Request ML22181A0012022-07-22022 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis Project stage: Meeting PMNS20240025, Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization2024-01-0505 January 2024 Meeting with Oklo to Discuss Seismic Design Categorization and Site Characterization Project stage: Request ML24032A1492024-02-0202 February 2024 Summary of Partially Closed Public Meeting to Discuss Seismic Design Categorization and Site Characterization for the Oklo, Inc., Advanced Reactor Design Project stage: Meeting PMNS20240765, Meeting with Oklo to Discuss Site Investigations2024-06-0606 June 2024 Meeting with Oklo to Discuss Site Investigations Project stage: Request ML24276A0552024-10-25025 October 2024 Summary of Partially Closed Public Meeting to Discuss Site Investigations for the Oklo Advanced Reactor Design Project stage: Meeting PMNS20250857, Preapplication Meeting with Oklo to Discuss pre-construction Activities for the Aurora Reactor to Be Constructed at INL2025-06-26026 June 2025 Preapplication Meeting with Oklo to Discuss pre-construction Activities for the Aurora Reactor to Be Constructed at INL Project stage: Meeting PMNS20251042, Meeting with Oklo to Discuss pre-construction Activities for the Aurora Reactor to Be Constructed at INL2025-08-19019 August 2025 Meeting with Oklo to Discuss pre-construction Activities for the Aurora Reactor to Be Constructed at INL Project stage: Request ML25204A1402025-08-21021 August 2025 Summary of Partially Closed Public Meeting to Discuss Preconstruction Activities for the Oklo Advanced Reactor Design Project stage: Meeting PMNS20251095, Pre-submittal Meeting with Oklo to Discuss a Proposed Topical Report on Fuel Qualification2025-09-0808 September 2025 Pre-submittal Meeting with Oklo to Discuss a Proposed Topical Report on Fuel Qualification Project stage: Request ML25254A2702025-09-11011 September 2025 Enclosure 2: Staffing Plan Validation Methodology Topical Report Slides (Public) Project stage: Request PMNS20251200, Meeting with Oklo to Discuss pre-construction Activities for Its Aurora Reactors2025-11-21021 November 2025 Meeting with Oklo to Discuss pre-construction Activities for Its Aurora Reactors Project stage: Request ML25269A1922025-11-25025 November 2025 Summary of Partially Closed Public Meeting to Discuss a Proposed Topical Report on Staffing Methodology for Oklo Advanced Reactor Design Project stage: Meeting ML25269A1982025-12-0505 December 2025 Summary of Closed Public Meeting to Discuss Preconstruction Activities for Oklo Advanced Reactor Design Project stage: Meeting ML25350C2842026-01-0505 January 2026 December 1, 2025 Pre Construction Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting ML25345A4432026-01-14014 January 2026 September 17, 2025, Fuel Qualification Meeting Summary Cover Letter and Enclosure 1 Project stage: Meeting 2025-11-25
[Table View] |
Text
MEMORANDUM TO:
FROM:
SUBJECT:
October 25, 2024 Joshua Borromeo, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation Donna Williams, Senior Project Manager /RA/
Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUMMARY
OF THE JULY 25, 2024, PARTIALLY CLOSED PUBLIC MEETING TO DISCUSS SITE INVESTIGATIONS FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0048)
Meeting Information:
Applicant: Oklo, Inc. (Oklo)
Project No.: 99902095 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML24158A058 Applicant Presentation Slides.: ML24220A163 NRC Staff Presentation Slides: None Meeting Attendees: See Enclosure 1 for list of meeting attendees.
CONTACT: Donna Williams, NRR/DANU/UAL1 301-415-1322 to this letter contains proprietary information. When separated from the enclosures, this letter is DECONTROLLED.
J. Borromeo 2
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271). Highlights from the meeting included the following:
Oklo shared the updates it had made to the siting approach. Oklo noted that all hazards that will be addressed as part of the license application and selected four geologic and seismic items to address on a site-by-site basis.
- Site seismicity For each of these hazards, Oklo described the basis, the site characterization leveraging existing resources, and the field work to be performed to reaffirm the site commitment.
The staff asked clarifying questions to better understand Oklos proposed approach. Oklo will consider the information and feedback provided by the staff and determine if additional interactions specific to the COLA proposed for the INL site would be beneficial before a readiness assessment.
No regulatory decisions were made as a result of this meeting.
Enclosures:
- 1. List of Attendees
- 2. Meeting Notes (proprietary)
ML24276A056 (Package)
ML24276A055 (Cover Letter and Enclosure 1)
ML24276A054 (Enclosure 2)
NRR-106
List of Meeting Attendees
SUMMARY
OF THE JULY 25, 2024, PARTIALLY CLOSED PUBLIC MEETING TO DISCUSS SITE INVESTIGATIONS FOR THE OKLO ADVANCED REACTOR DESIGN (EPID L-2022-LRM-0048)
Name Organization Katie Wagner U.S. Nuclear Regulatory Commission (NRC)
Alex Siwy NRC Josh Borromeo NRC Walter Williams NRC Jenise Thompson NRC Amit Ghosh NRC Cliff Munson NRC Scott Stovall NRC Laurel Bauer NRC Candace deMessiers NRC Trace Orf Oklo, Inc. (Oklo)
Ross Moore Oklo Mory Diane Oklo Emma Redfoot Oklo Alex Renner Oklo