March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION (REPORT 05000443/2024006)
Dear Bob Coffey:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Seabrook Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Seabrook Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket No. 05000443 License No. NPF-86
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
MATTHEW YOUNG Digitally signed by MATTHEW YOUNG Date: 2025.03.11 08:49:43 -04'00'
SUNSI Review
X Non-Sensitive Sensitive
X Publicly Available
Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME NMentzer MYoung
DATE 3/6/2025 3/7/2025
Site Inspection Activity Plan Seabrook 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count RP - 71124.01 - Rad Hazard and Control - Seabrook
1 3/31/2025 4/4/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Protective Strategy, TSR, SPR, PIs - SBK
1 6/2/2025 6/6/2025 IP 71130.02 000734 Access Control
6/2/2025 6/6/2025 IP 71130.05 000737 Protective Strategy Evaluation
6/2/2025 6/6/2025 IP 71130.09 001656 Security Plan Changes
6/2/2025 6/6/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
6/2/2025 6/6/2025 IP 71151 001338 Performance Indicator Verification Cyber Security - Seabrook
1 6/9/2025 6/13/2025 IP 71130.10 000741 Cybersecurity RP - 71124.08 - Waste & Transportation - Seabrook
1 6/23/2025 6/27/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation EP Program Inspection - Seabrook
1 8/18/2025 8/22/2025 IP 71114.02 000717 Alert and Notification System Testing
8/18/2025 8/22/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
8/18/2025 8/22/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
8/18/2025 8/22/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
8/18/2025 8/22/2025 IP 71151 001397 Performance Indicator Verification Commercial Grade Dedication - Seabrook
1 9/15/2025 9/19/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
9/29/2025 10/3/2025 IP 71111.21N.03 001808 Commercial Grade Dedication RP - 71124.06 - RETS - Seabrook
1 9/15/2025 9/19/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2025 Seabrook Initial Operator Licensing Exam
1 9/22/2025 9/26/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
10/19/2025 10/25/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
RP - 71124.05 - Instrumentation - Seabrook
1 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation SB Requal Inspection with P/F Results
1 11/10/2025 11/14/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
11/10/2025 11/14/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 3/6/2025 4:24:45 PM 1 of 2
Site Inspection Activity Plan RP - 71151 - PIV - Seabrook
1 12/1/2025 12/5/2025 IP 71151 000746 Performance Indicator Verification Inservice Inspection - Seabrook
1 4/6/2026 4/17/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71124.03 & 71124.04 - Airborne & Occupational - Seabrook
1 4/13/2026 4/17/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
4/13/2026 4/17/2026 IP 71124.04 000728 Occupational Dose Assessment RP - 71124.07 - REMP - Seabrook
1 6/8/2026 6/12/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program RP - 71124.01 - Rad Hazards - Seabrook
1 7/13/2026 7/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - AA, Access Control, FFD, SPR, PI Verification, ISFSI - SB
1 7/20/2026 7/24/2026 IP 71130.01 000733 Access Authorization
7/20/2026 7/24/2026 IP 71130.02 000734 Access Control
7/20/2026 7/24/2026 IP 71130.08 000740 Fitness-For-Duty Program
7/20/2026 7/24/2026 IP 71130.09 001656 Security Plan Changes
7/20/2026 7/24/2026 IP 71151 001338 Performance Indicator Verification
7/20/2026 7/24/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations PI&R Biennial Team Inspection - Seabrook
1 8/10/2026 8/14/2026 IP 71152B 000747 Problem Identification and Resolution
8/24/2026 8/28/2026 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SB
1 8/31/2026 9/4/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
9/28/2026 10/2/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP Exercise Inspection - Seabrook
1 9/21/2026 9/25/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
9/21/2026 9/25/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event
9/21/2026 9/25/2026 IP 71151 001397 Performance Indicator Verification Comprehensive Engineering Team Inspection - Seabrook
1 11/2/2026 11/6/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
11/16/2026 11/20/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection RP - 71151 - PIV - Seabrook
1 11/16/2026 11/20/2026 IP 71151 000746 Performance Indicator Verification Prepared on 3/6/2025 4:24:45 PM 2 of 2