ML24337A063
| ML24337A063 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/02/2024 |
| From: | Jeffrey Josey NRC/RGN-IV/DRSS/DIOR |
| To: | Hansett P Entergy Operations |
| References | |
| IR 2024401 | |
| Download: ML24337A063 (1) | |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 02, 2024 Phil Hansett, Site Vice President Entergy Operations, Inc.
5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000458/2024401
Dear Phil Hansett:
On November 14, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with William Steelman, Senior Manager, Nuclear Reactor Engineering and Jack Davis, General Manager, Nuclear Fuels and Analysis, and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at River Bend Station.
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.12] - Avoid Complacency.
If you disagree with a cross cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at River Bend Station.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION P. Hansett 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Jeffrey E. Josey, Chief Decommissioning, ISFSI, and Operating Reactor Branch Division of Radiological Safety and Security Docket No. 05000458 License No. NPF47
Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Josey, Jeffrey on 12/02/24
ML24327A008 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML24337A063 (Cover letter)
Entire Report:
SUNSI Review By: JJO Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review By: JJO Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE SHP:DRSS:DIOR C:DORS:PBC C:DRSS:DIOR NAME JODonnell DDodson JJosey SIGNATURE
/RA/
/RA/
/RA/
DATE 11/27/24 11/27/24 12/02/24