October 7, 2024 Gayle Elliott, Director Licensing and Regulatory Affairs Framatome Inc.
3315 Old Forest Road Lynchburg, VA 24501
SUBJECT:
THE U.S. NUCLEAR REGULATORY COMMISSION STAFFS ACCEPTANCE FOR THE REVIEW OF FRAMATOMES TOPICAL REPORT, ANP-10357P, REVISION 0, TXS COMPACT PLATFORM TOPICAL REPORT (EPID L-2024-TOP-0029)
Dear Gayle Elliott:
By letter dated August 2, 2024 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML24218A279), Framatome, Inc. (Framatome) submitted Topical Report (TR) ANP-10357P, Revision 0, TXS Compact Platform Topical Report, for U.S.
Nuclear Regulatory Commission (NRC) staffs review. As stated in your letter, the TR presents the generic application of the TXS COMPACT which has been developed as a platform based on Field-Programmable Gate Array (FPGA) technology that could be integrated with different modules from the TXS portfolio to implement safety Instrumentation and Control systems in nuclear power plants. The TR describes the TXS COMPACT platform modules, including configuration, diagnostics, monitoring, equipment qualification, communications, life cycle management, reliability, quality assurance, security, and regulatory compliance. A pre-submittal meeting was held on July 23, 2024 (ADAMS Accession No. ML24193A240), where Framatome representatives indicated that additional documents were available to support the NRC staffs review.
After the submittal, Framatome made documents (as required in Interim Staff Guidance-06, Revision 2) available for NRC staffs review via their electronic reading room. However, the regulatory compliance evaluation in the TR (e.g., Section 11, TXS Compact Regulatory Evaluation, supporting documentation) pointed to only some of these documents as evidence of compliance. The NRC staff requested that all the documents needed for the staffs safety evaluation be submitted on the docket to support its detailed technical review. Framatome plans to docket these documents by April 4, 2025.
The NRC staff have found that ANP-10357P, Revision 0, in addition to the requested documents is sufficient to begin its detailed technical safety review. Below are discussions and the NRC staffs rationale for the planned schedule and level of effort for the TR review. The NRC staff plans to conduct an in-person audit by the end of March 2025 (tentative), and issue 2 sets of Requests for Additional Information (RAIs) by July 2025, the draft safety evaluation (SE) by February 20, 2026, and final SE by April 30, 2026, as annotated in the enclosed schedule.
The draft SE completion date assumes 60 days for RAI responses and availability of all
documents required to be docketed and may be adjusted, if necessary, to accommodate any delays in the submittals. The enclosed schedule includes planned milestones dates for the overall review.
Additionally, the NRC staff estimates that it will require approximately 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> to complete the safety review. The NRC staff may need to increase the planned level of effort if the staff deems necessary for review of platform modules that were developed in accordance with International Electrotechnical Commission standards, which are not NRC endorsed criteria. No Advisory Committee on Reactor Safeguards review is needed for this TR.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that TRs are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff-hours will be billed accordingly.
If you have any questions regarding the TR review, please contact me at 301-415-6695 or via email at Ngola.Otto@nrc.gov.
Sincerely,
/RA/
Ngola A. Otto, Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 99902041
Enclosure:
Initial Review Schedule
Enclosure Initial Review Schedule Milestone Planned Date Initial Submittal August 2, 2024 Acceptance October 1, 2024 Audit (In-person)
March 2025 (tentative)
Supporting documentation Submittal April 4, 2025 Issue Request for Additional Information (RAI) - Set #1 May 30, 2025 Issue RAI - Set #2 July 31, 2025 Response to RAI - Set #1 July 31, 2025 Response to RAI - Set #2 September 30, 2025 Issue Draft SE February 20, 2026 Issue Final SE April 30, 2026
SUBJECT:
THE U.S. NUCLEAR REGULATORY COMMISSION STAFFS ACCEPTANCE FOR THE REVIEW OF FRAMATOMES TOPICAL REPORT, ANP-10357P, REVISION 0, TXS COMPACT PLATFORM TOPICAL REPORT (EPID L-2024-TOP-0029) DATED: OCTOBER 7, 2024 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrLADHarrison Resource RidsOgcMailCenter Resource RidsNrrDorlOd Resource RidsNrrDexEICB RidsNrrDorlLlpb Resource RidsNrrDexResource FSacko, NRR JZhao, NRR NCarte, NRR MLi, NRR GGeorge, NRR MFitzgerald, NRR NOtto, NRR DTaneja, NRR MMarshall, NRR AJohnson, NRR DZhang, NRR KKavanagh, NRR EXTERNAL DISTRIBUTION:
Phil.Opsal@Framatome.com ADAMS Accession Number: ML24256A027
- via email OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NRR/DEX/EICB/BC* NRR/DORL/LLPB/BC*
NAME NOtto DHarrison FSacko GGeorge DATE 09/24/2024 09/25/2024 10/02/2024 10/02/2024 OFFICE NRR/DORL/LLPB/PM NAME NOtto DATE 10/07/2024 OFFICIAL RECORD COPY