IR 05000397/2024005
| ML24232A032 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/22/2024 |
| From: | Patricia Vossmar NRC/RGN-IV/DORS/PBA |
| To: | Schuetz R Energy Northwest |
| References | |
| IR 2024005 | |
| Download: ML24232A032 (1) | |
Text
August 22, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR COLUMBIA GENERATING STATION (REPORT 05000397/2024005)
Dear Robert Schuetz:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Columbia Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal at your facility as indicated in the enclosed inspection plan.
In our 2023 Annual Assessment Letter, dated February 28, 2024, (Report 05000397/2023006, Agencywide Documents Access and Management System [ADAMS] Accession No.
ML24047315), we informed you of our intention to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, pending your notification of readiness to the NRC following deferral of the previously-scheduled supplemental inspection. On June 19, 2024, you informed the NRC of your readiness for the supplemental inspection. The NRC commenced the supplemental inspection during the week of August 19, 2024, and you will receive a separate report documenting the results of the inspection.
During the 2023 biennial problem identification and resolution inspection, the NRC identified a chilled work environment in the Operations Department. In response, the NRC completed inspection procedure 93100, Safety-Conscious Work Environment Issue of Concern Followup and documented the inspection results in NRC Inspection Report 05000397/2024012 (ADAMS Accession No. ML24173A224). NRC Region IV management determined that it is appropriate to continue to monitor your progress in addressing the safety-conscious work environment concerns in the Operations Department and the Region IV Regional Administrator authorized the staff to perform an additional inspection using Inspection Procedure 93100. The NRC staff will contact you to schedule this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1144 with any questions you have regarding this letter.
Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000397 and 07200035 License No. NPF-21 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Vossmar, Patricia on 08/22/24
ML24232A032 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar SIGNATURE
/RA/
/RA/
DATE 08/19/24 08/22/24
Site Inspection Activity Plan 07200035 - Columbia Generating Station (ISFSI)
07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection (IP 81311)
7/15/2024 7/19/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/16/2024 9:16:33 AM 1 of 3
Site Inspection Activity Plan Columbia Generating Station 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count RP 1,4,PI
2 7/15/2024 8/2/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
7/15/2024 8/2/2024 IP 71124.04 000728 Occupational Dose Assessment
7/29/2024 8/2/2024 IP 71151 000746 Performance Indicator Verification Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)
2 7/15/2024 7/19/2024 IP 71130.02 000734 Access Control
7/15/2024 7/19/2024 IP 71130.09 001656 Security Plan Changes
7/15/2024 7/19/2024 IP 71151 001338 Performance Indicator Verification Fire Protection Inspection - CGS
2 8/12/2024 8/16/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
8/26/2024 8/30/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Columbia RWCU IP 95001 Inspections (2 Whites)
2 8/19/2024 8/23/2024 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs CGS 2025 INITIAL EXAM
2 12/8/2024 12/14/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1/12/2025 1/18/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EP 2025 Program Inspection - CGS
2 2/3/2025 2/7/2025 IP 71114.02 000717 Alert and Notification System Testing
2/3/2025 2/7/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
2/3/2025 2/7/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
2/3/2025 2/7/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
2/3/2025 2/7/2025 IP 71151 001397 Performance Indicator Verification Inservice Inspection - CGS
2 4/14/2025 4/23/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
4/21/2025 4/25/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
4/21/2025 4/25/2025 IP 71151 000746 Performance Indicator Verification License Renewal-CGS 71003 (Phase 3)
2 8/17/2025 8/23/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Access Control (71130.02), Security Plan Changes (71130.09), PIV (71151)
2 8/18/2025 8/22/2025 IP 71130.02 000734 Access Control
8/18/2025 8/22/2025 IP 71130.09 001656 Security Plan Changes Prepared on 8/16/2024 9:16:33 AM 2 of 3
Site Inspection Activity Plan
8/18/2025 8/22/2025 IP 71151 001338 Performance Indicator Verification MC&A - CGS
2 9/8/2025 9/12/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
2 9/14/2025 9/20/2025 IP 71152B 000747 Problem Identification and Resolution
9/28/2025 10/4/2025 IP 71152B 000747 Problem Identification and Resolution CGS 2025 BRQ
2 9/21/2025 9/27/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Protective Strategy (71130.05) and Target Sets (71130.14)
2 10/6/2025 10/10/2025 IP 71130.05 000737 Protective Strategy Evaluation
10/6/2025 10/10/2025 IP 71130.14 000743 Review of Power Reactor Target Sets Age-Related Degradation Inspection - Columbia Generating Station
2 10/20/2025 10/24/2025 IP 71111.21N.04 001832 Age-Related Degradation
11/3/2025 11/7/2025 IP 71111.21N.04 001832 Age-Related Degradation RP 5,8 - CGS
2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation In-Office Exercise Scenario Review (2026) - CGS
2 1/26/2026 2/28/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review CGS 2026 INITIAL EXAM
2 1/25/2026 1/31/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
3/1/2026 3/7/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EP Exercise & PI Inspection (2026) - CGS
2 3/23/2026 3/27/2026 IP 71114.01 000716 Exercise Evaluation
3/23/2026 3/27/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/23/2026 3/27/2026 IP 71151 001397 Performance Indicator Verification RP 1,4,PI - CGS
2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
4/27/2026 5/1/2026 IP 71124.04 000728 Occupational Dose Assessment
4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification Prepared on 8/16/2024 9:16:33 AM 3 of 3