March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2024006)
Dear Robert Schuetz:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program
- Operations Phase.
The NRC determined the performance at Columbia Generating Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on two inspection findings having low-to-moderate safety significance (i.e., White) in the Occupational Radiation Safety Cornerstone originating in the fourth quarter of 2021, and all PIs within the expected range (i.e., Green). This is the same Action Matrix status that the NRC communicated to you on February 24, 2024, in the 2023 Annual Assessment Letter (Agencywide Documents Access and Management System [ADAMS] Accession No.
In the 2023 Annual Assessment Letter, we informed you of our intention to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. The initial IP 95001 inspection was scheduled for the week of March 4, 2024. After requesting deferral of the original inspection date, on June 19, 2024, you subsequently informed us of your readiness for the deferred supplemental inspection and the NRC commenced the inspection on August 19, 2024. During the inspection, the NRC determined the inspection still could not be satisfactorily completed, pending additional corrective actions for EA-23-054, Compromised Ability to Assess Dose, and the inspection was held open while the team continued to review additional activities being completed by the station. Upon completion of the inspection, the results will be documented in Inspection Report 05000397/2024040. The enclosed inspection plan lists the inspections scheduled through December 31, 2026. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. During 2025, the Regional Administrator has authorized completing IP 71003, Post-Approval Site Inspection for License Renewal.
During the 2023 biennial problem identification and resolution inspection, the NRC identified a chilled work environment in the Operations Department and in May of 2024, the NRC completed IP 93100, Safety-Conscious Work Environment Issue of Concern Follow-up, to review your efforts to address this issue. The NRC concluded that although some improvement had been made, the NRC determined that continued monitoring of the scope and pace of corrective actions to address the chilled work environment was warranted. Therefore, the Regional Administrator approved an additional 93100 inspection, which is scheduled for the week of July 14, 2025.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact Patricia Vossmar at (817) 200-1144 with any questions you have regarding this letter.
Sincerely, Geoffrey B. Miller, Director Division of Operating Reactor Safety Docket No. 05000397 License No. NPF-21 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Miller, Geoffrey on 03/11/25
ML25062A119 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS:PBA BC:DORS:PBA D:DRSS D:DORS NAME RBywater PVossmar JGroom GMiller SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 03/03/25 03/03/25 03/03/25 03/11/25
Site Inspection Activity Plan Columbia Generating Station 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count CGS 2025 INITIAL EXAM
2 1/12/2025 1/18/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EP 2025 Program Inspection - CGS
2 2/3/2025 2/7/2025 IP 71114.02 000717 Alert and Notification System Testing
2/3/2025 2/7/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
2/3/2025 2/7/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
2/3/2025 2/7/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
2/3/2025 2/7/2025 IP 71151 001397 Performance Indicator Verification Inservice Inspection-CGS
2 4/21/2025 4/25/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
4/21/2025 4/25/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
4/21/2025 4/25/2025 IP 71151 000746 Performance Indicator Verification CGS 93100
2 7/14/2025 7/18/2025 IP 93100 000921 Safety-Conscious Work Environment Issue of Concern Followup Security Access Control (71130.02), Security Plan Changes (71130.09), PIV (71151)
2 8/18/2025 8/22/2025 IP 71130.02 000734 Access Control
8/18/2025 8/22/2025 IP 71130.09 001656 Security Plan Changes
8/18/2025 8/22/2025 IP 71151 001338 Performance Indicator Verification MC&A - CGS
2 9/8/2025 9/12/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution
9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution CGS 2025 BRQ
2 9/21/2025 9/27/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Protective Strategy (71130.05) and Target Sets (71130.14)
2 10/6/2025 10/10/2025 IP 71130.05 000737 Protective Strategy Evaluation
10/6/2025 10/10/2025 IP 71130.14 000743 Review of Power Reactor Target Sets Age-Related Degradation Inspection - Columbia Generating Station
2 10/20/2025 10/24/2025 IP 71111.21N.04 001832 Age-Related Degradation Prepared on 2/26/2025 10:47:00 AM 1 of 2
Site Inspection Activity Plan
11/3/2025 11/7/2025 IP 71111.21N.04 001832 Age-Related Degradation RP 5,8 - CGS
2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation License Renewal-CGS 71003 (Phase 3)
2 11/16/2025 11/21/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal In-Office Exercise Scenario Review (2026) - CGS
2 1/26/2026 2/28/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review CGS 2026 INITIAL EXAM
2 1/25/2026 1/31/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
3/1/2026 3/7/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Security FFD
2 3/2/2026 3/6/2026 IP 71130.08 000740 Fitness-For-Duty Program EP Exercise & PI Inspection (2026) - CGS
2 3/23/2026 3/27/2026 IP 71114.01 000716 Exercise Evaluation
3/23/2026 3/27/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/23/2026 3/27/2026 IP 71151 001397 Performance Indicator Verification RP 1,4,PI - CGS
2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
4/27/2026 5/1/2026 IP 71124.04 000728 Occupational Dose Assessment
4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification Cybersecurity - CGS
2 7/20/2026 7/24/2026 IP 71130.10 000741 Cybersecurity Security AA-AC-PIV-Plan Change
2 8/3/2026 8/7/2026 IP 71130.01 000733 Access Authorization
8/3/2026 8/7/2026 IP 71130.02 000734 Access Control
8/3/2026 8/7/2026 IP 71130.09 001656 Security Plan Changes
8/3/2026 8/7/2026 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection - Columbia
2 10/19/2026 10/23/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
11/2/2026 11/6/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection CGS 2027 INITIAL EXAM
2 12/6/2026 12/12/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
Prepared on 2/26/2025 10:47:00 AM 2 of 2