MONTHYEARML22227A2022022-08-12012 August 2022 Abilene Christian University, Submittal of Construction Permit Application for the Molten Salt Research Reactor Project stage: Request ML22313A0972022-11-18018 November 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Acceptance Letter Project stage: Acceptance Review PMNS20221202, Public Meeting with Abilene Christian University (Acu)2022-11-21021 November 2022 Public Meeting with Abilene Christian University (Acu) Project stage: Request ML22341A6152022-12-16016 December 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Review Schedule Letter Project stage: Other ML23013A0892023-01-13013 January 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 Project stage: Other ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics Project stage: Other ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 Project stage: Other ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 Project stage: Other ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 Project stage: Other ML23052A0872023-03-0909 March 2023 Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23061A1322023-03-0909 March 2023 Acu Lu, Vr, WR, Rh, Wm, TR, AC, Fc Info Needs Items Q2FY2023 Project stage: Other ML23065A3342023-05-0101 May 2023 Abilene Christian University - December 9, 2022, Public Meeting Summary Regarding Discussion on Technical Focus Areas Project stage: Meeting ML23249A0952023-09-14014 September 2023 Abilene Christian University - Update to Construction Permit Application Technical Review Schedule Project stage: Other ML23319A0942023-11-14014 November 2023, 30 November 2023 Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 Project stage: Request ML23348A1962023-12-21021 December 2023 Abilene Christian University (Acu) - Transmittal of Requests for Additional Information Project stage: RAI ML24024A0092024-01-23023 January 2024 Abilene Christian University Construction Permit Application Partial Response to Audit Questions 3.5-4, 4.2-9, and 4.3-3 Project stage: Other ML24030A8702024-02-0606 February 2024 NRC Response to Request for Withholding Information from Public Disclosure for Abilene Christian University (Acu) Project stage: Withholding Request Acceptance ML24094A3322024-03-28028 March 2024 Abilene Christian University, Construction Permit Application - Response to Request for Additional Information 1 Project stage: Response to RAI ML24096B7832024-04-0505 April 2024 NRR E-mail Capture - Requests for Confirmation of Information Related to the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Project stage: Other ML24109A2032024-04-18018 April 2024 Next, Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24121A2722024-04-30030 April 2024 Abilene Christian University Construction Permit Application Response to Request for Additional Information 2 Project stage: Response to RAI ML24164A2362024-06-12012 June 2024 Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24162A0932024-06-12012 June 2024 Abilene Christian University - Molten Salt Research Reactor Construction Permit Application Revised Review Schedule Letter Project stage: Other ML24219A2622024-07-30030 July 2024 Enclosure 3, Safety Related Valve Requirements Redacted Project stage: Request ML24219A2592024-07-30030 July 2024 Enclosure 2, Mssr Codes and Service Conditions Redacted Project stage: Request ML24213A2862024-07-30030 July 2024 Submittal of Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 2 Project stage: Other ML24229A1952024-09-0303 September 2024 Notice of Significant Licensing Action - Abilene Christian University (Acu) Construction Permit Issuance Project stage: Other ML24243A0422024-09-16016 September 2024 Abilene Christian University, Safety Evaluation for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Request ML24243A0412024-09-16016 September 2024 Abilene Christian University, Transmittal Letter for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Approval ML24249A0302024-09-27027 September 2024 Abilene Christian University, Response to Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML24341A1332024-12-0505 December 2024 Abilene Christian University, Nuclear Energy Experimental Testing Lab., Msrr Degradation Management Program Project stage: Request ML25129A1262025-05-13013 May 2025 Request for Withholding Information from Public Disclosure for Abilene Christian University (Acu) Project stage: Withholding Request Acceptance 2024-01-23
[Table View] |
Text
OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION September 3, 2024 OFFICE OF NUCLEAR REACTOR REGULATION NOTIFICATION OF SIGNIFICANT LICENSING ACTION APPLICANT: Abilene Christian University Molten Salt Research Reactor Docket No. 50-610
SUBJECT:
ISSUANCE OF A CONSTRUCTION PERMIT FOR THE ABILENE CHRISTIAN UNIVERSITY MOLTEN SALT RESEARCH REACTOR (EPID L-2022-NFW-0002)
This notification is to inform the Commission that a construction permit (CP) will be issued on or about September 16, 2024, to Abilene Christian University (ACU) for its proposed 1 megawatt-thermal molten salt research reactor (MSRR). The purpose of the MSRR is to conduct research on molten salt systems in addition to educating and training operators, engineers, and scientists to contribute to the advancement and deployment of molten salt reactors and their applications. This action is being taken in response to ACUs CP application dated August 12, 2022 (Agencywide Documents Access and Management System Accession No. ML22227A201), as supplemented by letters dated October 14, 2022 (ML22293B816),
August 17, 2023 (ML23230A392), November 14, 2023 (ML23319A095), January 23, 2024 (ML24024A009), March 28, 2024 (ML24094A332), April 18, 2024 (ML24109A203),
April 30, 2024 (ML24121A272), June 12, 2024 (ML24164A236), and July 30, 2024 (ML24219A258). The application requests that the U.S. Nuclear Regulatory Commission (NRC) issue to ACU a CP to construct the MSRR within an existing academic building, the Gayle and Max Dillard Science and Engineering Research Center, that was recently constructed on the ACU campus in Abilene, Texas. Once issued, the CP would constitute an authorization to ACU to proceed with the construction of the MSRR but would not constitute an approval of the safety of any design feature or specification and ACU has not requested such approval for any part of the MSRR design. Instead, such approval would be made following the NRC staffs evaluation of the final design of the MSRR, as described in a final safety analysis report as part of an operating license application for the MSRR.
The staff accepted the CP application for docketing by letter dated November 18, 2022 (ML22313A097), and the application was assigned docket number 50-610. A notice of docketing of the application was published in the Federal Register on November 28, 2022 CONTACT: Richard Rivera, NRR/DANU/UAL2 (301) 415-7190
OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION (87 FR 73051). A notice of a 60-day opportunity to request a hearing and petition for leave to intervene regarding the application was published in the Federal Register on January 31, 2023 (88 FR 6319). No requests or petitions were filed in response to this notice.
The NRC staff performed an environmental review for the CP application, and its evaluation and conclusions are documented in an environmental assessment titled Environmental Assessment for the Construction Permit Application for the Abilene Christian University Molten Salt Research Reactor, dated March 2024 (ML23300A053). The NRC staff also performed a safety review for the CP application, and its evaluation and conclusions are documented in a safety evaluation that will be issued with the CP. The staff determined that subject to conditions related to ACUs (1) implementation of a quality assurance program for the design and construction of the MSRR and (2) development and implementation of a Degradation Management Program to ensure proper management of potential degradation mechanisms for MSRR components, the preliminary design and analysis of the MSRR, as described in the CP application, is sufficient and meets the applicable regulatory requirements and guidance for the issuance of a CP in accordance with Title 10 of the Code of Federal Regulations Part 50, Domestic Licensing of Production and Utilization Facilities. Further technical or design information required to complete the safety analysis in support of the operation of the MSRR can reasonably be left for later consideration in an operating license application.
NOTE: Information to be added after the CP is issued.
Date CP issued: September 16, 2024 Date received by ACU: September 16, 2024
ML24229A195 ADM-12 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA OGC/NLO NRR/DANU/UAL2:BC (A)
NAME RRivera CSmith JWachutka SPhilpott DATE 8/16/2024 8/19/2024 8/21/2024 8/23/2024 OFFICE NRR/DANU:DD NRR:D NAME JBowen AVeil DATE 8/30/2024 9/3/2024