Letter Sequence Other |
---|
EPID:L-2022-NFW-0002, Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 (Approved, Closed) |
Results
Other: ML22341A615, ML23013A089, ML23052A087, ML23061A132, ML23065A048, ML23065A051, ML23065A052, ML23065A055, ML23065A056, ML23249A095, ML24024A009, ML24096B783, ML24162A093, ML24229A195
|
MONTHYEARML22313A0972022-11-18018 November 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Acceptance Letter Project stage: Acceptance Review PMNS20221202, Public Meeting with Abilene Christian University (Acu)2022-11-21021 November 2022 Public Meeting with Abilene Christian University (Acu) Project stage: Request ML22341A6152022-12-16016 December 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Review Schedule Letter Project stage: Other ML23013A0892023-01-13013 January 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 Project stage: Other ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics Project stage: Other ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 Project stage: Other ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 Project stage: Other ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 Project stage: Other ML23061A1322023-03-0909 March 2023 Acu Lu, Vr, WR, Rh, Wm, TR, AC, Fc Info Needs Items Q2FY2023 Project stage: Other ML23052A0872023-03-0909 March 2023 Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23065A3342023-05-0101 May 2023 Abilene Christian University - December 9, 2022, Public Meeting Summary Regarding Discussion on Technical Focus Areas Project stage: Meeting ML23249A0952023-09-14014 September 2023 Abilene Christian University - Update to Construction Permit Application Technical Review Schedule Project stage: Other ML23319A0942023-11-14014 November 2023, 30 November 2023 Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 Project stage: Request ML23348A1962023-12-21021 December 2023 Abilene Christian University (Acu) - Transmittal of Requests for Additional Information Project stage: RAI ML24024A0092024-01-23023 January 2024 Abilene Christian University Construction Permit Application Partial Response to Audit Questions 3.5-4, 4.2-9, and 4.3-3 Project stage: Other ML24030A8702024-02-0606 February 2024 NRC Response to Request for Withholding Information from Public Disclosure for Abilene Christian University (Acu) Project stage: Withholding Request Acceptance ML24094A3322024-03-28028 March 2024 Abilene Christian University, Construction Permit Application - Response to Request for Additional Information 1 Project stage: Response to RAI ML24096B7832024-04-0505 April 2024 NRR E-mail Capture - Requests for Confirmation of Information Related to the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Project stage: Other ML24109A2032024-04-18018 April 2024 Next, Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24121A2722024-04-30030 April 2024 Abilene Christian University Construction Permit Application Response to Request for Additional Information 2 Project stage: Response to RAI ML24164A2362024-06-12012 June 2024 Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24162A0932024-06-12012 June 2024 Abilene Christian University - Molten Salt Research Reactor Construction Permit Application Revised Review Schedule Letter Project stage: Other ML24229A1952024-09-0303 September 2024 Notice of Significant Licensing Action - Abilene Christian University (Acu) Construction Permit Issuance Project stage: Other ML24243A0412024-09-16016 September 2024 Abilene Christian University, Transmittal Letter for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Approval ML24243A0422024-09-16016 September 2024 Abilene Christian University, Safety Evaluation for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Request ML24249A0302024-09-27027 September 2024 Abilene Christian University, Response to Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2023-09-14
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1342024-09-0606 September 2024 NRR E-mail Capture - Issuance of Audit Reports for Abilene Christian Universitys (Acu) Construction Permit Application Review ML24158A2302024-05-30030 May 2024 NRR E-mail Capture - Materials Degradation Request for Confirmation of Information (RCI) Abilene Christian University (Acu) Proposed Molten Salt Research Reactor (Msrr) ML24096B7832024-04-0505 April 2024 NRR E-mail Capture - Requests for Confirmation of Information Related to the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application ML24089A0872024-03-29029 March 2024 NRR E-mail Capture - NRC Staff Response to Abilene Christian University Request for Extension of the RAI 2 Response Date ML24088A2792024-03-28028 March 2024 NRR E-mail Capture - (External_Sender) Abilene Christian University Request for Extension of the Request for Additional Information (RAI) 2 Response Date ML24061A1182024-03-0101 March 2024 NRR E-mail Capture - Abilene Christian University, Response to Request for Additional Information (RAI) Extension Request ML24061A0242024-02-29029 February 2024 NRR E-mail Capture - (External_Sender) Request for Extension of the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Requests for Additional Information (RAI) Response Date ML24031A5822024-01-31031 January 2024 NRR E-mail Capture - Abilene Christian University, Response to Request for Additional Information (RAI) Extension Request ML24030A6212024-01-29029 January 2024 NRR E-mail Capture - (External_Sender) Request for Extension of the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Requests for Additional Information (RAI) Response Date ML24023A6242024-01-23023 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (4.3-25 on Material Degradation) ML24022A2122024-01-22022 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (4.3-23 and 4.3-24 on Material Degradation) ML24017A3032024-01-17017 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML24015A0102024-01-11011 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (Related to Material Degradation) ML24008A0922024-01-0808 January 2024 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) ML23354A2852023-12-20020 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (Psar), Section 4.3 and 9.2 Audit Questions (Related to Material Degradation) ML23348A3732023-12-14014 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for CA- 2, 5 and 6 ML23346A2352023-12-12012 December 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation for NO-2 and 3 ML23345A1702023-12-11011 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) PSAR Chapter 3 Audit Question ML23335A1172023-12-0101 December 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr), Preliminary Safety Analysis Report (PSAR) Chapter 3 Audit Question ML23271A0202023-09-27027 September 2023 Acu Msrr - Environmental Review Requests for Confirmatory Information - Closure Confirmation ML23237B1492023-08-21021 August 2023 Abilene Christian University, Request for Non-Public Documents ML23241A7842023-08-16016 August 2023 Discussion with Texas Historical Commission ML23241A7932023-08-14014 August 2023 Chitimacha Tribe Response 8_14_2023 ML23241A8312023-08-11011 August 2023 THC Correspondence with Caitlin Brashear as of 8_29 ML23241A8192023-08-11011 August 2023 Texas Historical Commission Final Response 8_11_2023 ML23219A2132023-08-0202 August 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Section 2.3 Audit Questions (Batch 2) ML23194A0642023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for Pre-Submittal Audit Related to Physical Security for the Molten Salt Research Reactor ML23194A1592023-07-13013 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 16 Audit Questions ML23192A4542023-07-11011 July 2023 NRR E-mail Capture - Abilene Christian University (Acu), Molten Salt Research Reactor (Msrr) Chapter 11 Audit Question ML23184A1462023-07-0303 July 2023 NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Chapter 10 Audit Questions ML23241A8142023-06-12012 June 2023 Delaware Nation Response 6_12_2023 ML23241A8262023-06-12012 June 2023 Texas Historical Commission Response 6_12_2023 ML23241A7862023-05-23023 May 2023 Caddo Nation Response 5_16_23 ML23241A8172023-05-23023 May 2023 Kickapoo Tribe Response 5_23_2023 ML23129A7802023-05-0909 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Section 1.7 and 9.5 Audit Questions ML23123A0442023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 4, Chapter 6, and Section 9.6 Audit Question ML23123A0462023-05-0202 May 2023 NRR E-mail Capture - Abilene Christian University (Acu) Msrr Chapter 13 and Section 9.2 Audit Question ML23116A1712023-04-26026 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 2) ML23095A0812023-04-0505 April 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu Construction Permit (CP) Preliminary Safety Analysis Report (PSAR) Chapters 2 and 3 (Batch 2) ML23086A0142023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 4, 6, and 9.6 ML23086A0172023-03-24024 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP PSAR Chapters 2 and 3 (Batch 1) ML23080A1912023-03-21021 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics (Batch 1) ML23076A0152023-03-16016 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapters 9.2 and 13 ML23073A3022023-03-14014 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Questions Regarding Acu CP Chapter 7 ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 ML23052A0672023-02-21021 February 2023 NRR E-mail Capture - Abilene Christian University - Audit Question Regarding the Acu CP Technical Topics Audit 2024-09-06
[Table view] |
Text
From: Edward Helvenston Sent: Friday, April 5, 2024 11:32 AM To: Rusty Towell Cc: Lester Towell; Benjamin Beasley; Michael Wentzel; Richard Rivera; Brian Bettes; Michael Balazik; Greg Oberson (He/Him); Ian Tseng; Luissette Candelario-Quintana; Zuhan Xi; Dong Park
Subject:
Requests for Confirmation of Information Related to the ACU MSRR Construction Permit Application Attachments: Geotech RCIs related to Audit Question 2.5-9.pdf
Dear Dr. Towell:
By letter dated August 12, 2022 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML22227A201), as supplemented, Abilene Christian University (ACU) submitted a construction permit application for its proposed Molten Salt Research Reactor (MSRR) for U.S. Nuclear Regulatory Commission (NRC) staff review.
The NRC staff identified additional information needed to continue its review of the application, as described in the enclosed request for confirmation of information (RCI). Please provide a response to the RCI (confirming the information in the RCI or providing additional explanation or information, if necessary) or a written request for additional time to respond, including the proposed response date and a brief explanation of the reason, by May 6, 2024. Follow receipt of the complete response to the RCI, the NRC staff will continue its review.
If you have any questions regarding the NRC staffs review or if you intend to request additional time to respond, please contact me at (301) 415-4067 or by email at Edward.Helvenston@nrc.gov, or contact Richard Rivera at (301) 415-7190 or Richard.Rivera@nrc.gov.
Sincerely,
Ed Helvenston, U.S. NRC Non-Power Production and Utilization Facility Licensing Branch (UNPL)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Office of Nuclear Reactor Regulation (NRR)
(301) 415-4067
Docket No. 05000610 EPID: L-2022-NFW-0002
Enclosure:
As stated cc: GovDelivery Subscribers
Concurrence on RCI OFFICE NRR/DANU/UAL2/BC NRR/DANU/UNPL/PM NAME MWentzel EHelvenston DATE 4/4/2024 4/5/2024
Hearing Identifier: NRR_DRMA Email Number: 2456
Mail Envelope Properties (BY5PR09MB59567B08347004343D527759E0032)
Subject:
Requests for Confirmation of Information Related to the ACU MSRR Construction Permit Application Sent Date: 4/5/2024 11:32:21 AM Received Date: 4/5/2024 11:32:00 AM From: Edward Helvenston
Created By: Edward.Helvenston@nrc.gov
Recipients:
"Lester Towell" <ldt20a@acu.edu>
Tracking Status: None "Benjamin Beasley" <bgb23b@acu.edu>
Tracking Status: None "Michael Wentzel" <Michael.Wentzel@nrc.gov>
Tracking Status: None "Richard Rivera" <richard.rivera@nrc.gov>
Tracking Status: None "Brian Bettes" <Brian.Bettes@nrc.gov>
Tracking Status: None "Michael Balazik" <Michael.Balazik@nrc.gov>
Tracking Status: None "Greg Oberson (He/Him)" <Greg.Oberson@nrc.gov>
Tracking Status: None "Ian Tseng" <Ian.Tseng@nrc.gov>
Tracking Status: None "Luissette Candelario-Quintana" <luissette.candelario-quintana@nrc.gov>
Tracking Status: None "Zuhan Xi" <Zuhan.Xi@nrc.gov>
Tracking Status: None "Dong Park" <Dong.Park@nrc.gov>
Tracking Status: None "Rusty Towell" <rxt01a@acu.edu>
Tracking Status: None
Post Office: BY5PR09MB5956.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 1752 4/5/2024 11:32:00 AM Geotech RCIs related to Audit Question 2.5-9.pdf 117928
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR CONFIRMATION OF INFORMATION MOLTEN SALT RESEARCH REACTOR CONSTRUCTION PERMIT APPLICATION ABILENE CHRISTIAN UNIVERSITY DOCKET NO. 50 -610
RCI 2.5-1 (Related to Audit Question 2.5-9A)
The regulation 10 CFR 50.34(a)(1)(i) requires, in part, that a PSAR include a description and safety assessment of the site on which the facility is to be located, with appropriate attention to features affecting the facility design.
On April 11, 2023, in response to Audit Question 2.5-2 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML23086A017) and others provided by the NRC staff as part of the ACU PSAR Chapter 2 and 3 Audit (ML23065A048), ACU provided its Geotechnical Investigation Report for the MSRR for NRC staff audit. Part 1.2 of the geotechnical investigation report indicates that the report is provided for general information only and that the owner or architect neither guarantee nor accept any responsibility for soil investigation data.
Please confirm that, consistent with information ACU provided for audit on November 30, 2023, in response to Audit Question 2.5 -9 (ML23283A017):
- The quoted statements above from Part 1.2 of the Geotechnical Investigation Report are standard language in Parkhill specifications that acknowledge the geotechnical report is providing a representative sample of existing soil conditions only in the areas investigated and does not account for all conditions at the site. This acknowledges the fact that not every location of Science and Engineering Research Center (SERC) foundations/footings has been investigated or documented.
- Parkhill affirms that the boring data documented in the geotechnical report is verified and reliable for the areas investigated.
RCI 2.5-2 (Related to Audit Question 2.5-9B)
The regulation 10 CFR 50.34(a)(1)(i) requires, in part, that a PSAR include a description and safety assessment of the site on which the facility is to be located, with appropriate attention to features affecting the facility design.
The regulation 10 CFR 50.34(a)(7) requires that a PSAR include a description of the quality assurance program to be applied to the design, fabrication, construction, and testing of the structures, systems, and components of the facility.
a) Regarding the geotechnical investigation performed to demonstrate the suitability of the SERC site and to inform the design and construction of portions of the ACU SERC building that will become safety-related structures, systems, and components (SSCs) for
the Molten Salt Research Reactor (MSRR), confirm that, consistent with information ACU provided for audit on November 30, 2023, and March 1, 2024, in response to Audit Questions 2.5-9 (ML23283A017) and 3-6 (ML23335A117), respectively; and discussions during an audit meeting on March 14, 2024:
- The firm that performed the geotechnical investigation for the SERC site, eHT, applied a quality assurance/quality control (QA/QC) program for the investigation and characterization of the site.
- eHT had a registered geotechnical engineer (professional engineer) onsite during the investigation to provide quality control, and the engineer observed the sampling methods.
- The sampling methods followed were in accordance with the following referenced standards:
o ASTM-D1587/D1587M -15, Standard Practice for Thin-Walled Tube Sampling of Soils for Geotechnical Purposes o ASTM-D1586/D1586M -18e1, Standard Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils o TEX-132-E, Texas Cone Penetration, effective date August 1999 o ASTM-D2488-17e1, Standard Practice for Description of Identification of Soils (Visual-Manual Procedures)
- The registered geotechnical engineer also prepared the samples for transport to the soil testing laboratory and assigned the appropriate laboratory soil classification tests.
- As part of the eHT QA/QC program, a peer review of the geotechnical engineers report was conducted by another qualified geotechnical engineer. This person was an EHT principal and a nother professional engineer who was not closely involved with the ACU project, but who has local knowledge in the areas of soil mechanics and foundations. A QC checklist was followed for this review to ensure that each of the required items was reviewed.
- As part of eHTs practices for conducting geotechnical investigations, any observations or results that are out of the ordinary are addressed and resolved before moving forward. For example, if laboratory analys es show inconsistent or unexpected results, they re-check samples to evaluate for possible errors. For the ACU project specifically, eHT used more borings than necessary to improve the quantity of data available for cross-checking results. Periodic meetings are also held at eHT to share lessons-learned on projects.
b) Please confirm that, consistent with information in the Geotechnical Investigation Report provided for audit on April 11, 2023, and discussions during an audit meeting on March 14, 2024:
- Laboratory testing of samples was conducted in general accordance with ASTM procedures and standards including:
o ASTM-D4318-17e1, Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils o ASTM-D1140- 17, Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing