Next, Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information
ML24109A203
Person / Time
Site: Abilene Christian University
Issue date: 04/18/2024
From: Towell R
Nuclear Energy eXperimental Testing Lab
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML24109A203 (1)


Text

Finding global solutions to the worlds most critical needs.

Abilene Christian University Nuclear Energy eXperimental Testing Lab ACU Box 28208, Abilene, Texas 79699-8208 acunextlab.org April 18, 2024 Docket No. 50-610 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 205550001

Subject:

Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information On April 5, 2024, the Nuclear Regulatory Commission issued two Requests for Confirmatory Information (RCIs) to Abilene Christian University related to the construction permit application for the Molten Salt Research Reactor (ML24096B783).

I confirm that the information in RCI 2.5-1 and RCI 2.5-2 is correct.

If there are further questions, please contact a licensing manager at Benjamin.Beasley@acu.edu or Lester.Towell@acu.edu.

Recognizing that the RCI responses provide preliminary design information and that the final design may differ, I declare under penalty of perjury that the information is true and correct.

Executed on April 18, 2024.

Rusty Towell, PhD Director of NEXT Lab Cc:

Richard Rivera, Project Manager, NRR Advanced Reactor Licensing Branch 2 Edward Helvenston, Project Manager, NRR Non-Power Production and Utilization Facility Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch