Abilene Christian University - Molten Salt Research Reactor Construction Permit Application Revised Review Schedule Letter
ML24162A093
Person / Time
Site: Abilene Christian University
Issue date: 06/12/2024
From: Rivera R
NRC/NRR/DANU/UAL2
To: Towell R
Abilene Christian University (ACU)
Richard Rivera, NRR/DANU
References
EPID L-2022-NFW-0002
Download: ML24162A093 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Dr. Rusty Towell Director of NEXT Lab Abilene Christian University ACU Box 27963 Abilene, TX 79699

SUBJECT:

ABILENE CHRISTIAN UNIVERSITY - MOLTEN SALT RESEARCH REACTOR CONSTRUCTION PERMIT APPLICATION REVISED REVIEW SCHEDULE (EPID: L-2022-NFW-0002)

Dear Dr. Towell:

The purpose of this letter is to inform Abilene Christian University (ACU) of the U.S. Nuclear Regulatory Commission (NRC) staffs revised schedule for the review of the construction permit application for ACUs proposed Molten Salt Research Reactor (MSRR) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22227A201), as supplemented. By letter dated December 16, 2022 (ML22341A615), the NRC staff previously communicated that it planned to complete its review of the construction permit application by May 2024. During regulatory audit meetings with ACU, it was identified that ACU needed additional time to further consider and refine certain design aspects of its MSRR. Therefore, the NRC staff determined that additional information was needed for the NRC staff to complete its review of the ACU application, and on December 21, 2023 (ML23348A196), the NRC staff issued a letter containing requests for additional information (RAIs). In that letter, the NRC staff also notified ACU that it would issue a revised schedule once ACU responded to the RAIs transmitted in that letter. ACU responded by letters dated March 28, 2024, (ML24094A332) and April 30, 2024 (ML24121A272).

Based on the status of the review and ACUs plan to provide the remaining information identified during the technical audits, the NRC staffs revised estimate for completing its review of the construction permit application is provided in the table below:

Milestone Group - Safety Review Estimated Completion Draft Safety Evaluation 06/28/2024 Advanced Safety Evaluation 08/16/2024 Final Safety Evaluation and Construction Permit Issuance09/30/2024 The revised schedule is based on historical review timelines, and the NRC staffs judgement regarding the estimated level of effort necessary to complete the technical review and develop the safety evaluation. Additionally, the revised schedule accounts for the work that was done by June 12, 2024 both the NRC staff and ACU to resolve additional technical issues in other areas while working in parallel to respond to the RAIs. The revised schedule could change due to several factors, including the timeframe for the resolution of the remaining technical issues, unanticipated changes to the scope of the review, unsolicited supplements to the application, design changes, and other factors. Finally, based on its assessment of the remaining scope of work, the NRC staff believes that the original estimate of 15,000 NRC staff hours to complete the review of the construction permit application remains valid.

If you have any questions, please contact Richard Rivera at (301) 415-7190 or via email at Richard.Rivera@nrc.gov or Edward Helvenston at (301) 415-4067 or via email at Edward.Helvenston@nrc.gov.

Sincerely, Richard Rivera, Project Manager Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-610 cc: Abilene Christian University MSRR via GovDelivery Subscribers Signed by Rivera, Richard on 06/12/24

ML24162A093 NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NRR/DANU/UTB1:BC NAME RRivera CSmith GOberson DATE 06/10/2024 06/10/2024 06/11/2024 OFFICE NRR/DANU/UAL2:(A)BC NRR/DANU/UAL2:PM NAME SPhilpott RRivera DATE 06/12/2024 06/12/2024