Letter Sequence Request |
|---|
EPID:L-2022-NFW-0002, Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 (Approved, Closed) |
Results
Other: ML22341A615, ML23013A089, ML23052A087, ML23061A132, ML23065A048, ML23065A051, ML23065A052, ML23065A055, ML23065A056, ML23249A095, ML24024A009, ML24096B783, ML24162A093, ML24213A286, ML24229A195
|
MONTHYEARML22227A2022022-08-12012 August 2022 Abilene Christian University, Submittal of Construction Permit Application for the Molten Salt Research Reactor Project stage: Request ML22313A0972022-11-18018 November 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Acceptance Letter Project stage: Acceptance Review PMNS20221202, Public Meeting with Abilene Christian University (Acu)2022-11-21021 November 2022 Public Meeting with Abilene Christian University (Acu) Project stage: Request ML22341A6152022-12-16016 December 2022 Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Review Schedule Letter Project stage: Other ML23013A0892023-01-13013 January 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23065A0562023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 9.2 and 13 Project stage: Other ML23065A0522023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 1, 5, 8, 9 (Except 9.2 and 9.6), 10, 11, 12, 14-18, and General Topics Project stage: Other ML23065A0512023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapter 7 Project stage: Other ML23065A0482023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 2 & 3 Project stage: Other ML23065A0552023-03-0202 March 2023 NRR E-mail Capture - Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Primarily Regarding Chapters 4, 6, and 9.6 Project stage: Other ML23052A0872023-03-0909 March 2023 Abilene Christian University - Audit Plan for the Molten Salt Research Reactor Construction Permit Application Technical Topics Project stage: Other ML23061A1322023-03-0909 March 2023 Acu Lu, Vr, WR, Rh, Wm, TR, AC, Fc Info Needs Items Q2FY2023 Project stage: Other ML23065A3342023-05-0101 May 2023 Abilene Christian University - December 9, 2022, Public Meeting Summary Regarding Discussion on Technical Focus Areas Project stage: Meeting ML23249A0952023-09-14014 September 2023 Abilene Christian University - Update to Construction Permit Application Technical Review Schedule Project stage: Other ML23319A0942023-11-14014 November 2023, 30 November 2023 Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1 Project stage: Request ML23348A1962023-12-21021 December 2023 Abilene Christian University (Acu) - Transmittal of Requests for Additional Information Project stage: RAI ML24024A0092024-01-23023 January 2024 Abilene Christian University Construction Permit Application Partial Response to Audit Questions 3.5-4, 4.2-9, and 4.3-3 Project stage: Other ML24030A8702024-02-0606 February 2024 NRC Response to Request for Withholding Information from Public Disclosure for Abilene Christian University (Acu) Project stage: Withholding Request Acceptance ML24094A3322024-03-28028 March 2024 Abilene Christian University, Construction Permit Application - Response to Request for Additional Information 1 Project stage: Response to RAI ML24096B7832024-04-0505 April 2024 NRR E-mail Capture - Requests for Confirmation of Information Related to the Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Construction Permit Application Project stage: Other ML24109A2032024-04-18018 April 2024 Next, Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24121A2722024-04-30030 April 2024 Abilene Christian University Construction Permit Application Response to Request for Additional Information 2 Project stage: Response to RAI ML24162A0932024-06-12012 June 2024 Abilene Christian University - Molten Salt Research Reactor Construction Permit Application Revised Review Schedule Letter Project stage: Other ML24164A2362024-06-12012 June 2024 Abilene Christian University Construction Permit Application Response to Request for Confirmatory Information Project stage: Request ML24213A2862024-07-30030 July 2024 Submittal of Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 2 Project stage: Other ML24219A2592024-07-30030 July 2024 Enclosure 2, Mssr Codes and Service Conditions Redacted Project stage: Request ML24219A2622024-07-30030 July 2024 Enclosure 3, Safety Related Valve Requirements Redacted Project stage: Request ML24229A1952024-09-0303 September 2024 Notice of Significant Licensing Action - Abilene Christian University (Acu) Construction Permit Issuance Project stage: Other ML24243A0422024-09-16016 September 2024 Abilene Christian University, Safety Evaluation for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Request ML24243A0412024-09-16016 September 2024 Abilene Christian University, Transmittal Letter for Issuance of Construction Permit for the Molten Salt Research Reactor Project stage: Approval ML24249A0302024-09-27027 September 2024 Abilene Christian University, Response to Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML24341A1332024-12-0505 December 2024 Abilene Christian University, Nuclear Energy Experimental Testing Lab., Msrr Degradation Management Program Project stage: Request ML25129A1262025-05-13013 May 2025 Request for Withholding Information from Public Disclosure for Abilene Christian University (Acu) Project stage: Withholding Request Acceptance 2024-01-23
[Table View] |
Text
Enclosure 3 Safety Related Valve Requirements Redacted (non-proprietary)
page 1 of 2 SAFETY RELATED VALVE REQUIREMENTS
Purpose:
Valves within the MSRR perform safety related functions related to the control of reactivity and the containment of radionuclides. The preliminary to-and-from location, quantity, valve type, condition, and design/qualification codes and standards of the safety related valves are provided. Because all of the valves are safety related, they are also classified as seismic class I.
Valves:
From To Quantity System Valve Type*
Temp**
V-7004 V-7002 1 inside V-3004, 1 outside V-3004 ESF Fail Closed V-7002 and 7001 C-6006 2 inside V-3004, 1 outside V-3004 ESF Fail Closed UF4 Handling V-3003 1 inside V-3004, 2 outside V-3004 ESF Fail Closed V-3003 V-3002 4 outside T-3001 RPS Fail Open V-3003 V-3002 2 inside T-3001 RPS Fail Open V-3002 V-1002 1 inside T-1005 ESF Fail Closed V-3002 V-1002 1 inside T-1005 ESF ail Closed V-7307, V-7308, and V-7003 Common Header V-1002 3 outside T-1005 ESF Fail Closed V-7307, V-7308, and V-7003 Common Header V-1002 3 outside T-1005 (upstream of both isolation valves)
ESF Pressure relief valve (PRV)
Common Header V-1002 V-1002 1 inside T-1005 ESF Fail Closed
page 2 of 2 From To Quantity System Valve Type*
Temp**
V-1002 X-1001 1 inside T-1005, 1 outside T-1005 ESF Fail Closed T-1005 X-1001 1
ESF PRV V-1002 T-1005 1
ESF PRV X-6002A/B V-7003 or F-8002 1 inside T-6009, 1 outside T-6009 ESF
, Fail Closed V-1001, V-1004 V-1002 TBD based on DOE shipping ESF TBD based on DOE shipping V-1002 Sample 1 inside T-1005, 1 outside T-1005 ESF Fail Closed
- Unless mentioned otherwise, the valves are primarily made of SS316. Valves with a service temperature above 425 °C require SS316H. Valves with a service temperature below 425 °C may use SS316L.
Operating and Design Conditions:
The components inside the RTMS shall be designed to operate within the high-temperature environment.
The preliminary design pressure is 70 psig. The final design pressure will be confirmed in the detailed design.
Applicable Codes and Standards: Safety related valves constructed out of SS316 will be manufactured under ASME BPVC Section III, 2017 Edition. Safety related valves constructed out of Ni-201 will be manufactured under ASME B16.34 (2020 Edition unless the 2013 Edition is required by Section III Division 5). Provisions governing the use of Ni-201 are provided in the description of V-1002.
Requirements pertaining to active mechanical equipment within ASME QME-1 (2017) will be satisfied subject to provisions specified in Regulatory Guide 1.100 Revision 4 (2020). ANS 15.8-1995 will define the quality assurance requirements.
Safety related valves will be accessible for maintenance and testing.
Materials of Construction: Stainless steel 316 unless otherwise specified.