ML23040A350

From kanterella
Jump to navigation Jump to search
DHS Varick Street 5th Floor 7 of 7 - Attachment D (Part 2 of 2, Pdf Pages 120 to 216)
ML23040A350
Person / Time
Issue date: 05/02/2022
From:
NRC Region 1
To:
References
Download: ML23040A350 (1)


Text

APPENDIXC WASTEINVENTORY

DrumID# Pipingfrom DoseRateonDrum Column# (µrem/hr)

Drum001 158 4 Drum002 154 5 Drum003 145 4 Drum004 168 5 Drum005 128 5 Drum006 76 8 Drum007 76 4 Drum008 76 8 Drum009 76 9 Drum010 76 8 Drum011 168 6 Drum012 76 7 Drum013 24 8 Drum014 64 7 Drum015 50&51 7 Drum016 168 5 Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

APPENDIX D

Radiological Surveys

TRIO General Contracting

Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

This Page Intentionally Left Blank

TRIO General Contracting

HOUSTON STREET p

1 2 3 4 5 6 7 8 9 1010A 11 12 13 14 15 16 17 18 19 Legend 24 29A 38 Active Riser to be removed from 4th 20 21 22 23 !P 25 26 27 28 29 30 31 32 33 34 35 36 37 !P floor and 3rd floor and replaced in-kind

Active Riser to be removed from the 50 51 !P 5th, 4th, and 3rd floors and replaced in-39 40 41 42 43 44 45 46 47 4848A 49 52 53 54 55 56 57 kind P !P Inactive Riser to be removed from 4th

!P floor and 3rd floor 58 59 60 61 62 63 64 65 66 6767A 68 69 70 71 72 73 74 75 76 Riser to Remain

! !P !P P 45 ft of piping to be removed. Remove and cap pipe from ceiling of 4th floor 77 78 79 80 81 82 83 84 85 8686A 87 88 89 90 91 92 93 94 95 45 ft of piping to be removed. Remove and seal 5th Floor floor drains 80 ft of active piping. Remove, replace 96 97 98 99 100 101 102 103 104 105105A 106 107 108 109 110 111 112 113 114 and re-route to avoid electrical room &

Riser 76 (storm drain)

P 124124A 125 128 131 Note: Baselin e survey measuremen ts 115 116 117 118 119 120 121 122 123 126 127 ! 129 130 132 133 collected adjacen t to pipe removal P ! colu mn location s.

P 144 145 149 134 135 136 137 138 139 140 141 142 143143A !P !P 146 147 148 150 151 152

154 158 159 160 161 162162A 163 164 165 170 153 !P !155156157166167!P169171 P 168

172 173 174 175 176 177 178 179 180 181181A 182 183 184 185 186 187 188 189 190 BASELINE SURVEY A REAS

201 VA RIC K STREET NEW YORK, NEW YORK KING STREET 2/2022 GIS AN ALYST: S. OWE FIGURE Notes:

1. Contractor to field verify all quantities. 0 40 80
2. Only piping and risers associated with the acid distribution line from the 5th floor shown. Approx. Scale (feet)

HOUSTON STREET p

1 2 3 4 5 6 7 8 9 1010A 11 12 13 14 15 16 17 18 19 Legend 24 29A 38 Active Riser to be removed from 4th 20 21 22 23 !P 25 26 27 28 29 30 31 32 33 34 35 36 37 !P floor and 3rd floor and replaced in-kind

Active Riser to be removed from the 50 51 !P 5th, 4th, and 3rd floors and replaced in-39 40 41 42 43 44 45 46 47 4848A 49 52 53 54 55 56 57 kind P !P Inactive Riser to be removed from 4th

!P floor and 3rd floor 58 59 60 61 62 63 64 65 66 6767A 68 69 70 71 72 73 74 75 76 Riser to Remain

! !P !P P 45 ft of piping to be removed. Remove and cap pipe from ceiling of 4th floor 77 78 79 80 81 82 83 84 85 8686A 87 88 89 90 91 92 93 94 95 45 ft of piping to be removed. Remove and seal 5th Floor floor drains 80 ft of active piping. Remove, replace 96 97 98 99 100 101 102 103 104 105105A 106 107 108 109 110 111 112 113 114 and re-route to avoid electrical room &

Riser 76 (storm drain)

P 123 124124A 125 126 127 128 130 131 132 133 Note: Post-Pip ing removal r elease 115 116 117 118 119 120 121 122 ! 129 sur vey measurements collected P ! adjacent to pipe removal co lumn P

144 145 149 lo cations.

134 135 136 137 138 139 140 141 142 143143A !P !P 146 147 148 150 151 152

154 158 159 160 161 162162A 163 164 165 170 153 !P !155156157166167!P169171 P 168

172 173 174 175 176 177 178 179 180 181181A 182 183 184 185 186 187 188 189 190 POST-PIPING REMOVAL RELEASE SURVEY AREAS

201 VA RIC K STREET NEW YORK, NEW YORK KING STREET 2/2022 GIS AN ALYST: S. OWE FIGURE Notes:

1. Contractor to field verify all quantities. 0 40 80
2. Only piping and risers associated with the acid distribution line from the 5th floor shown. Approx. Scale (feet)

Column50PipeSurveyVertical

Meas.ID 2221/4461minStatic(cpm) Comment

504V01 18 504V02 23 504V03 20 504V04 17 504V05 20 504V06 18

SummaryStatistics

  1. ofMeasurements 6 Minimum 17 Maximum 23 Mean 19.3 Median 19 StandardDeviation() 2.0 Mean+3(3z) 25.2
  1. ofMeasurements3z 0

Meter/Probe: 2221/446(SN161580/PR051218)

Comment: OpenWindow Column76PipeSurveyHorizontal

Meas.ID 2221/4461minStatic(cpm) Comment 764H01 14 Y(2openings) 764H01a 7 Y(2openings) 764H02 6 764H03 19 764H04 9 764H05 9 764H06 15 764H07 22 764H08 13 764H09 10 764H10 7 764H11 8 764H12 7 764H13 13 764H14 11 764H15 12 764H16 15 764H17 15 764H18 19 764H19 21 764H20 8 764H21 9 764H22 14 764H23 10 764H24 8 764H25 8 764H26 14 764H27 12 764H28 12 764H29 10 764H30 18 764H31 11 764H32 11 764H33 10 764H34 7 764H35 8 764H36 6 764H37 14

SummaryStatistics

  1. ofMeasurements 38 Minimum 6 Maximum 22 Mean 11.6 Median 11 StandardDeviation 4.1 Mean+3(3z) 24.1
  1. ofMeasurements3z 0

Meter/Probe: 2221/446(SN161580/PR051218)

Comment: OpenWindow Column76PipeSurveyVertical

Meas.ID 2221/4461minStatic(cpm) Comment 764V01 12 764V02 14 764V03 8 764V04 15

SummaryStatistics

  1. ofMeasurements 4 Minimum 8 Maximum 15 Mean 12.3 Median 13 StandardDeviation 2.7 Mean+3(3z) 20.3
  1. ofMeasurements3z 0

Meter/Probe: 2221/446(SN161580/PR051218)

Comment: OpenWindow Column168PipeSurveyHorizontal

Meas.ID 2221/4461minStatic(cpm) Comment 1684H01 13 1684H02 14 1684H03 21 1684H04 11 1684H05 16 1684H06 6 1684H07 11 1684H08 12 1684H09 17 1684H10 10 1684H11 10 1684H12 13 1684H13 13 1684H14 17

SummaryStatistics

  1. ofMeasurements 14 Minimum 6 Maximum 21 Mean 13.1 Median 13 StandardDeviation 3.6 Mean+3(3z) 24.0
  1. ofMeasurements3z 0

Meter/Probe: 2221/446(SN161580/PR051218)

Comment: OpenWindow Column168PipeSurveyVertical

Meas.ID 2221/4461minStatic(cpm) Comment 1685V01 16 VerticaladjacenttoC149to5thFloor 1685V02 14 VerticaladjacenttoC1685thFloor 1685V03 15 VerticaladjacenttoC1685thFloor 1684V04 16 VerticaladjacenttoC168to4thFloor 1684V05 15 VerticaladjacenttoC168to4thFloor 1684V06 6 VerticaladjacenttoC168to4thFloor 1684V07 12 VerticaladjacenttoC168to4thFloor 1684V08 9 VerticaladjacenttoC168to4thFloor

SummaryStatistics

  1. ofMeasurements 8 Minimum 6 Maximum 16 Mean 12.9 Median 14.5 StandardDeviation 3.4 Mean+3(3z) 23.1
  1. ofMeasurements3z 0

Meter/Probe: 2221/446(SN161580/PR051218)

Comment: OpenWindow

Survey Form Location: B-10 RWP# NA Survey # VarickSt-2022-55D-SS-001 Survey Site: Varick Street Page 1 of 1Type: Outgoing Smear Direct Count (DPM/100 cm2) (DPM/Direct Frisk)

No. No.

1 013 1 Drum ID Location Result ( rem/hr) 2 219 2 1 Top11 6 3 017 3 2 Side 6 4 119 4 1 Top2 5 5 022 5 2 Side 5 6 016 6 1 Top3 5 7 012 7 2 Side 5 8 018 8 1 Top24 6

9 010 9 2 Side 5 10 08 10 1 Top5 7 11 013 11 2 Side 5 12 114 12 1 Top6 6 13 020 13 2 Side 6 14 016 14 1 Top7 5 15 118 15 2 Side 6 16 021 16 1 Top8 6 17 216 17 2 Side 6 18 118 18 1 Top9 5 19 120 19 2 Side 5 20 20 1 Top106 21 21 2 Side6 22 22 1 Top115 23 23 2 Side5 24 24 1 Top125 25 25 2 Side6 26 26 1 Top136 27 27 2 Side6 28 28 1 Top145 29 29 2 Side5 30 30 1 Top156 31 31 2 Side6 32 32 1 Top166 33 33 2 Side5 34 34 1 Top175 35 35 2 Side5 36 36 1 Top186 37 37 2 Side5 38 38 1 Top19 6 39 39 2 Side5 40 40 Comments Surveyed By: Date: KeyInstrument Serial # Eff. Eff. Bkg Bkg (cpm) (cpm) Bkg Cal. Due L Collins 21-Apr-22 43-93 / 2224 227246 / PR-244849 0.202 0.159 1 231.5 N/A 2/24/2023 L Collins 21-Apr-22 Bicron m/r 1844 N/A N/A N/A N/A 6 2/15/2023 A/S Location L Collins 21-Apr-22 3030P 287072 0.265 0.139 0.200 15.800 N/A 2/18/2023 *-* Boundary

Static Measurement

Dose Rate _______ /hr

  • Direct Reading CPM/direct frisk Reviewed By: Scott Hay Date: 25-Apr-22 Grab Sample

Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

APPENDIX E

Radiological and Mercury Air Monitoring Results

TRIO General Contracting

Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

This Page Intentionally Left Blank

TRIO General Contracting

Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

APPENDIX F

Analytical Laboratory Data Packages

TRIO General Contracting

Completion Report Removal of the 3 rd, 4th and 5th Floor Drain Piping and Drains 201 Varick Street New York, New York May 2022

This Page Intentionally Left Blank

TRIO General Contracting

1 2

3 4

ANALYTICAL REPORT 5

Eurofins St. Louis 6 13715 Rider Trail North 7 Earth City, MO 63045 Tel: (314)298-8566 8 Laboratory Job ID: 160-44890-1 9 Client Project/Site: 201 Varick Street, NYC For: 10 Cabrera Services 11 50 Founders Plaza Suite 207 12 East Hartford, Connecticut 06108

Attn: Mike Plonski

Authorized for release by:

4/15/2022 7:14:04 PM Ivan Vania, Project Manager II (314)298-8566 Ivan.Vania@et.eurofinsus.com

This report has been electronically signed and authorized by the signatory. Electronic signature is intended to be the legally binding equivalent of a traditionally handwritten signature.

Results relate only to the items tested and the sample(s) as received by the laboratory.

Client: Cabrera Services Laboratory Job ID: 160-44890-1 1 Project/Site: 201 Varick Street, NYC 2

Table of Contents 3 Cover Page.............................................. 1 Table of Contents......................................... 2 4 Case Narrative........................................... 3 5 Chain of Custody.......................................... 7 Receipt Checklists.........................................8 6 Definitions/Glossary....................................... 9 7 Method Summary......................................... 10 8 Sample Summary......................................... 11 Client Sample Results......................................12 9 QC Sample Results........................................ 18 10 QC Association Summary................................... 25 11 Tracer Carrier Summary.................................... 27 12

Page 2 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 3 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 4 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 5 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 6 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 7 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 8 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 9 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 10 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 11 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 12 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 13 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 14 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 15 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 16 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 17 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 18 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 19 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 20 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 21 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 22 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 23 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 24 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 25 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 26 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 27 of 28 1

2 3

4 5

6 7

8 9

10 11 12

Page 28 of 28 1

2 3

4 ANALYTICAL REPORT 5

Eurofins St. Louis 6 13715 Rider Trail North 7 Earth City, MO 63045 Tel: (314)298-8566 8 Laboratory Job ID: 160-44924-1 9 Client Project/Site: 201 Varick Street, NYC For: 10 Cabrera Services 11 50 Founders Plaza Suite 207 12 East Hartford, Connecticut 06108

Attn: Mike Plonski

Authorized for release by:

4/20/2022 2:20:03 PM Ivan Vania, Project Manager II (314)298-8566 Ivan.Vania@et.eurofinsus.com

This report has been electronically signed and authorized by the signatory. Electronic signature is intended to be the legally binding equivalent of a traditionally handwritten signature.

Results relate only to the items tested and the sample(s) as received by the laboratory.

Client: Cabrera Services Laboratory Job ID: 160-44924-1 1 Project/Site: 201 Varick Street, NYC 2

Table of Contents 3 Cover Page.............................................. 1 Table of Contents......................................... 2 4 Case Narrative........................................... 3 5 Chain of Custody.......................................... 5 Receipt Checklists.........................................6 6 Definitions/Glossary....................................... 7 7 Method Summary......................................... 8 8 Sample Summary......................................... 9 Client Sample Results......................................10 9 QC Sample Results........................................ 11 10 QC Association Summary................................... 14 11 Tracer Carrier Summary.................................... 15 12

Page 2 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 3 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 4 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 5 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 6 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 7 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 8 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 9 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 10 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 11 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 12 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 13 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 14 of 15 1

2 3

4 5

6 7

8 9

10 11 12

Page 15 of 15