Letter Sequence Approval |
---|
|
|
MONTHYEARML21208A2802021-08-0505 August 2021 Federal Register Notice: Oconee Nuclear Station, Units 1, 2, and 3 - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement Project stage: Other ML21208A4102021-08-0505 August 2021 Letter to Steven M. Snider, Site Vice President, Oconee Nuclear Station - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Other ML21263A0312021-09-21021 September 2021 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Project stage: Approval ML21279A1032021-11-0808 November 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Transcript Project stage: Meeting ML21279A1542021-11-0808 November 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary Memo Project stage: Meeting ML21323A1152021-11-23023 November 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Enclosure Project stage: Other ML21323A1132021-11-23023 November 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Letter Project stage: Other ML21335A2852021-12-0202 December 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Supplemental Letter Project stage: Other ML21357A0692022-01-10010 January 2022 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff'S Review of the Oconee Nuclear Station Project stage: Approval ML22055A5332022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-03) Project stage: Request ML22055A5272022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-03) Project stage: Request L-2022-031, Annual Radioactive Effluent Release Report2022-03-0101 March 2022 Annual Radioactive Effluent Release Report Project stage: Request L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 Project stage: Supplement RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 22022-11-0707 November 2022 Subsequent License Renewal - Appendix E Environmental Report Supplement 2 Project stage: Supplement ML22321A3232022-11-18018 November 2022 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement Project stage: Approval ML23031A1932023-02-0101 February 2023 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Project stage: Approval ML23031A1992023-02-0101 February 2023 Nd 4 Environmental Remote Audit Requests for Confirmation of Information Project stage: Other ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) Project stage: Approval ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application Project stage: Approval ML23145A2602023-06-0505 June 2023 Revision of Schedule for the Environmental Review of the Turkey Point Nuclear Generating Station, Units 3 and 4, Subsequent License Renewal Application (EPID Number: L-2021-SLE-0002) (Docket Numbers: 50-250 and 50-251) Project stage: Approval ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal Project stage: Draft Other ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal Project stage: Draft Other ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application Project stage: Approval ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application Project stage: Approval 2022-02-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] |
Text
February 1, 2023 Dianne Strand GM Regulatory Affairs Florida Power & Light Co.
15430 Endeavor Drive (NT3/JW)
Jupiter West, FL 33478
SUBJECT:
TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4
SUMMARY
OF THE ENVIRONMENTAL REMOTE AUDIT RELATED TO THE REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER L 2021 SLE 0002)
Dear Dianne Strand:
A review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) participated in a remote audit December 12 - 13, 2022, and January 6, 2023, for Turkey Point Nuclear Generating Station, Unit Numbers 3 and 4, as part of the subsequent license renewal (SLR) application environmental review. The goal of the audit was to gather information to ensure that the environmental requirements for SLR, as codified in title 10 of the Code of Federal Regulations part 51 Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, were met. A letter dated November 18, 2022 (Agencywide Documents Access and Management System (ADAMS) ML22321A323), was sent containing an audit plan.
An entrance meeting was held on December 12, 2022, to introduce participants and discuss audit logistics. During the remainder of the audit, the NRC staff participated in smaller groups (breakout sessions) with Florida Power & Light Company (FPL) and Enercon Services, Inc.
(Enercon) representatives to address the audit needs identified in the audit plan. Enclosure 1 to this letter provides a list of representatives from the NRC, FPL, and Enercon who participated in the audit.
At the conclusion of the audit, the NRC staff summarized the status of the review with FPL and Enercon representatives during the exit meeting held on January 6, 2023. Many of the NRCs questions identified in the audit plan or during the audit were answered through the conduct of the audit. Those that were not answered but needed for the site-specific Supplemental Environmental Impact Statement need to be submitted (a) as a supplement to the environmental report, (b) as responses to requests for additional information (RAI), or (c) as responses to requests for confirmation of information (RCI). Enclosure 2 to this letter provides the staffs RAIs and RCIs. We are requesting FPLs response to our requests within 30 days of the receipt of this letter.
While the NRC staff did not identify any significant environmental issues during this audit, the staff indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested via the RAI process in the future.
D. Strand Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's Public Document Room staff at 800-397-4209 (or 301-415-4737) or via email at pdr.resource@nrc.gov.
If you have any questions, please contact me via email at Lance.Rakovan@nrc.gov.
Sincerely, Signed by Rakovan, Lance on 02/01/23 Lance J. Rakovan Senior Environmental Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-250 and 251
Enclosures:
As stated cc: Listserv
D. Strand
SUBJECT:
TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 -
SUMMARY
OF THE ENVIRONMENTAL REMOTE AUDIT RELATED TO THE REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER L 2021 SLE 0002)
DATE:
February 1, 2023 DISTRIBUTION:
PUBLIC Listserv RidsNrrDnrl Resource RidsNrrPMTurkey Point Resource LGibson, NRR/DNRL DRoth, OGC TSmith, NMSS/REFS SBurnell, HQ/OPA LRakovan, NMSS/REFS LWilkin, HQ/OCA JMoses, NMSS/REFS JPelchat, RII/SGLO JTrefethen, NMSS/REFS DGasperson, RII/OPA JDozier, NRR/DRA JOrr, RII/SRI KHsueh, NRR/DRA RReyes, RII/RI MMahoney, NRR/DORL BDesai, RII/DRS STurk, OGC PCooper, RII/DRS ADAMS Accession No.:
OFFICE PM:ERLRB:REFS LA:REFS BC:ERLRB:REFS PM:ERLRB:REFS NAME LRakovan AWalker-Smith TSmith LRakovan DATE 01/31/2023 02/01/2023 02/01/2023 02/01/2023 OFFICE RECORD COPY
LIST OF PARTICIPANTS TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW ENVIRONMENTAL AUDIT December 12-13, 2022, and January 6, 2023 The U.S. Nuclear Regulatory Commission (NRC) environmental audit team members, Florida Power & Light Company (FPL), and Enercon Services, Inc. (Enercon) as well as their disciplines are shown below.
NRC Discipline Team Members Environmental Review Supervisor Ted Smith, NMSS Environmental Project Manager Lance Rakovan, NMSS Aquatic Resources Briana Arlene, NMSS Cumulative Impacts Beth Alferink, NMSS Caroline Hsu, NMSS Environmental Justice Jeff Rikhoff, NMSS Fuel Cycle Beth Alferink, NMSS Geologic Environment Lifeng Guo, NMSS Greenhouse Gas Emissions and Climate Nancy Martinez, NMSS Change Groundwater Lifeng Guo, NMSS Historic and Cultural Resources (Section 106 Nancy Martinez, NMSS Consultation) Robert Hoffman, NMSS Human Health Beth Alferink, NMSS Land Use and Visual Resources Caroline Hsu, NMSS Air Quality and Noise Nancy Martinez, NMSS Postulated Accidents Jerry Dozier, NRR Replacement Power Alternatives Robert Hoffman, NMSS Caroline Hsu, NMSS Socioeconomics Jeff Rikhoff, NMSS Spent Nuclear Fuel Beth Alferink, NMSS Lifeng Guo, NMSS Surface Water Jeff Rikhoff, NMSS Terminating Power Plant Operations and Beth Alferink, NMSS Decommissioning Caroline Hsu, NMSS Terrestrial Resource Briana Arlene, NMSS Beth Alferink, NMSS Waste Management Don Palmrose, NMSS Enclosure
FPL Discipline Team Members Sr Environmental Services Project Manager Ken Proctor, Jr.
Environmental Services Director Paula Cobb Nuclear Licensing Engineer Boris Bazan Environmental Services Project Manager Scott Burns Sr Nuclear Chemistry Analyst Yolanda Sands Sr Environmental Services Engineer Diane Nguyen Sr Environmental Specialist Richard Eguino Sr Project Manager of Environmental Services Michael Reid Sr Project Manager Development Sara Dussich Sr Environmental Specialist Meghna Pandya Engineering Manager Andrew Whitley Construction Supervisor Adam Richardson Sr Environmental Specialist Kristin Eaton Nuclear Licensing Projects Manager Michael Davis Sr Environmental Services Project Manager Richard Estabrook Enercon Discipline Team Members Tom Slavonic Project Manager/Technical Lead Rachel Turney Ashley Harper Air Quality & Noise Jerry Riggs Cumulative Impacts Mary Hoganson Ecology (Terrestrial, Aquatic, Special Status Species &
Anjali Karve Habitats)
Randall Lantz Groundwater and Surface Water Jennifer Meek Historic and Cultural Resources Gary Eddington Human Health and Microbial Hazards Mary Hoganson Fred Woolridge Land Use and Visual Resources Jerry Riggs Replacement Power Alternatives Mary Hoganson Radiation Protection, Effluents, Solid Radioactive Waste Mary Hoganson Programs (additional Waste Management session) Fred Woolridge Severe Accident Mitigation Alternatives Neil Johnson Socioeconomics Cheyenne Riggs Mary Hoganson Waste Management and Spent Nuclear Fuel Fred Wooldridge