IR 05000334/2022402
| ML22223A173 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/12/2022 |
| From: | Matt Young Division of Operating Reactors |
| To: | Grabnar J Energy Harbor Nuclear Corp |
| Dentel G | |
| References | |
| IR 2022402 | |
| Download: ML22223A173 (3) | |
Text
August 12, 2022
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - CYBER SECURITY PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000334/2022402 AND 05000412/2022402
Dear John Grabnar:
On June 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Beaver Valley Power Station, Units 1 and 2. On May 5, 2022, the NRC inspectors discussed the results of the cyber security problem identification and resolution sample portion of this inspection with Andrew Crotty, Nuclear Work Control Manager, and other members of your staff.
The results of this inspection are documented in the enclosed report.
One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Beaver Valley Power Station, Units 1 and 2.
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: [P.2] - Evaluation.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Beaver Valley Power Station, Units 1 and 2.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73
Enclosure:
As stated
cc w/o encl: Distribution via LISTSERV
cc w/encl:
W. DeHaas, Bureau of Radiation Protection, PA Department of Environmental Protection B. Fuller, Bureau of Radiation Protection, PA Department of Environmental Protection J. Sharpless, Superintendent Security Operations
Matthew R.
Young Digitally signed by Matthew R.
Young Date: 2022.08.12 08:01:41-04'00'
ML22223A168 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML22223A173 (Cover letter)
Entire Report:
X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available Cover Letter Only:
X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS RI/DORS
NAME APatel GDentel MYoung
DATE 8/11/22 8/11/22 8/11/22