ND-22-0157, ITAAC Closure Notification on Completion of ITAAC Item 2.2.01 .09 (Index Number 110)

From kanterella
(Redirected from ML22059B069)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC Item 2.2.01 .09 (Index Number 110)
ML22059B069
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/28/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.201.09, ND-22-0157
Download: ML22059B069 (8)


Text

.A Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel FEB 2 8 2022 Docket No.: 52-025 ND-22-0157 10 CFR 52 .99(c)(1)

U.S . Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC Item 2.2.01 .09 (Index Number 110)

Ladies and Gentlemen:

In accordance with 10 CFR 52 .99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2 .01 .09 (Index Number 110). This ITAAC confirms that safety related displays and controls exist in the main control room , including controls from PMS, for valves associated with the Containment System (CNS) identified as having active safety functions . The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01 , "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

Michael J. Yox Regulatory Affairs D1 e tor Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC Item 2.2.01 .09 (Index Number 110)

MJY/DCH/sfr

U.S. Nuclear Regulatory Commission ND-22-0157 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J.C. Haswell Document Services RTYPE: VND .LI.L06 File AR.01 .02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G . Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0157 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Mr. J. L. Coward Other Mr. S. W . Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr. , Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0157 Enclosure Page 1 of 5 Southern Nuclear Operating Company ND-22-0157 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC Item 2.2.01 .09 [Index Number 11 O]

U.S. Nuclear Regulatory Commission ND-22-0157 Enclosure Page 2 of 5 IT AAC Statement Design Commitment

9. Safety-related displays identified in Table 2.2. 1-1 can be retrieved in the MGR.

10.a) Controls exist in the MGR to cause those remotely operated valves identified in Table 2.2. 1-1 to perform active functions.

10.b) The valves identified in Table 2.2.1-1 as having PMS control perform an active safety function after receiving a signal from the PMS.

Inspections/Test/Analyses Inspection will be performed for retrievability of the safety-related displays in the MGR.

Stroke testing will be performed on remotely operated valves identified in Table 2.2. 1-1 using the controls in the MGR.

Testing will be performed on remotely operated valves listed in Table 2.2. 1-1 using real or simulated signals into the PMS.

Acceptance Criteria Safety-related displays identified in Table 2.2. 1-1 can be retrieved in the MGR.

Controls in the MGR operate to cause remotely operated valves identified in Table 2 .2. 1-1 to perform active safety functions .

The remotely operated valves identified in Table 2.2. 1-1 as having PMS control perform the active function identified in the table after receiving a signal from PMS.

ITAAC Determination Basis Inspections and testing were performed to confirm the valves listed in Combined License (COL)

Appendix C Table 2.2.1-1 (Attachment A) have safety related displays retrievable in the Main Control Room (MCR), controls exist in the MCR to cause those remotely operated valves identified in Table 2.2.1-1 to perform active functions, and the valves identified as having Protection and Safety Monitoring System (PMS) control perform the active function identified in the table after receiving a signal from the PMS.

Safety-related displays identified in Table 2.2.1-1 can be retrieved in the MCR.

Inspections were performed in accordance with the Unit 3 test package work orders listed in Reference 1, which visually confirmed that when each of the displays of the plant parameter identified in Attachment A is summoned using the MCR PMS Visual Display Units (VDUs), the expected valve position appears on the PMS VDU.

U.S. Nuclear Regulatory Commission ND-22-0157 Enclosure Page 3 of 5 Controls in the MCR operate to cause remotely operated valves identified in Table 2.2.1-1 to perform active safety functions.

Using Plant Control System (PLS) controls in the MCR, stroke testing each valve in Attachment A was performed in accordance with test package work orders for Unit 3 listed in Reference 2. Each valve was stroked to its active function and proper valve position indication was verified locally and in the MCR. This testing demonstrates PLS controls in the MCR operate to cause the remotely operated valves identified in COL Appendix C Table 2.2.1-1 to perform their active safety functions.

The remotely operated valves identified in Table 2.2.1-1 as having PMS control perform the active function identified in the table after receiving a signal from PMS.

Testing is performed in accordance with Unit 3 test package work orders listed in Reference 3 to confirm that the remotely operated valves identified in Attachment A as having PMS control perform the active safety function identified in the table after receiving a signal from the PMS.

The test package work orders establish initial conditions for each valve , verified locally and in the MCR to be in the open position. An actuation signal is generated by PMS using the PMS Maintenance and Test Panel (MTP) to generate a signal to close the valves in Attachment A.

Each valve is verified locally and in the MCR to be closed. Additionally, for VFS-PL-V800A/B initial conditions were established with each valve verified locally and in the MCR to be in the closed position . An actuation signal is generated by PMS using the PMS Maintenance and Test Panel (MTP) to generate a signal to open the valves . VFS-PL-V800A/B are verified locally and in the MCR to be open. This verifies that the remotely operated valves identified in Table 2.2.2-1 as having PMS control perform the active safety function identified in the table after receiving a signal from the PMS.

Together, these test results (References 1 through 3) provide evidence that the ITAAC Acceptance Criteria requ irements are met:

  • Safety-related displays identified in Table 2.2.1 -1 can be retrieved in the MCR.
  • Controls in the MCR operate to cause remotely operated valves identified in Table 2.2.1-1 to perform active safety functions.
  • The remotely operated valves identified in Table 2.2.1-1 as having PMS control perform the active function identified in the table after receiving a signal from PMS .

References 1 through 3 are available for NRC inspection as part of the Unit 3 ITAAC 2.2.01 .09 Completion Packages (Reference 4).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of findings pertaining to the subject ITAAC and associated corrective actions. This finding review, which included now-consolidated ITAAC Indexes 111 and 112, found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.01 .09 Unit 3 (Reference 4) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0157 Enclosure Page 4 of 5 IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.01 .09 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-CNS-ITR-800110, Rev 0, "Unit 3 Inspection Results of: ITAAC 2.2.01 .09 (Item 9), NRC Index Number:11 0"
2. SV3-CNS-ITR-801110, Rev 0, "Unit 3 Testing results of ITAAC2 .2.01 .09 (Item 10.a) , NRC Index Number:11 0"
3. SV3-CNS-ITR-802110, Rev 0, "Unit 3 Compiled Testing of Containment Isolation Valves, ITAAC 2.2.01 .09 (Item 10.b) , NRC Index Number 11 0"
4. 2.2.01 .09-U3-CP-Rev0 , ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0157 Enclosure Page 5 of 5 Attachment A Containment System (CNS) Remotely Operated Valves Display, Control, and Active Function Remotely Operated Safety- Related Control Active Equipment Name* Tag No.* Valve* Display* PMS/DAS* Function*

Instrument Air Supply Outside Yes (Valve Transfer CAS-PL-V014 YES Yes/No Containment Isolation Valve Position) Closed Component Cooling Water System (CCS) Containment Isolation Motor- Yes (Valve Transfer CCS-PL-V200 YES Yes/No operated Valve (MOV) - Inlet Line Position) Closed Outside Reactor Containment (ORC)

CCS containment isolation MOV- Yes (Valve Transfer CCS-PL-V207 YES Yes/No outlet line IRC Position) Closed CCS containment isolation MOV- Yes (Valve Transfer CCS-PL-V208 YES Yes/No outlet line ORC Position) Closed SFS Discharge Line containment Yes (Valve Transfer SFS-PL-V038 YES Yes/No isolation MOV - ORC Position) Closed SFS Suction Line containment Yes (Valve Transfer SFS-PL-V034 YES Yes/No isolation MOV - IRC Position) Closed SFS Suction Line containment Yes (Valve Transfer SFS-PL-V035 YES Yes/No isolation MOV - ORC Position) Closed Containment Pu rge Inlet Yes (Valve Transfer VFS-PL-V003 YES Yes/Yes containment isolation valve -ORC Position) Closed Containment Pu rge Inlet Yes (Valve Transfer VFS-PL-V004 YES Yes/Yes containment isolation valve - IRC Position) Closed Containment Pu rge Discharge Yes (Valve Transfer VFS-PL-V009 YES Yes/Yes containment isolation valve - IRC Position) Closed Containment Purge Discharge Yes (Valve Transfer VFS-PL-V010 YES Yes/Yes containment isolation valve -ORC Position) Closed Transfer Vacuum Relief containment isolation Yes (Valve Closed/

VFS-PL-VB00A YES Yes/No A MOV- ORC Position) Transfer Open Transfer Vacuum Relief containment isolation Yes (Valve Closed/

VFS-PL-VB00B YES Yes/No B MOV- ORC Position) Transfer Open Fan Cooler Return containment Yes (Valve Transfer VWS-PL-V082 YES Yes/No isolation valve - IRC Position) Closed Fan Cooler Return containment Yes (Valve Transfer VWS-PL-V086 YES Yes/No isolation valve - ORC Position) Closed Fan Cooler Supply containment Yes (Valve Transfer VWS-PL-V058 YES Yes/No isolation valve - ORC Position) Closed Reactor Coolant Drain Tank (RCDT)

Yes (Valve Transfer Gas Outlet containment isolation WLS-PL-V067 YES Yes/No Position) Closed valve - IRC RCDT Gas Outlet containment Yes (Valve Transfer WLS-PL-V068 YES Yes/No isolation valve - ORC Position) Closed Sump Discharge containment Yes (Valve Transfer WLS-PL-V055 YES Yes/Yes isolation valve - IRC Position) Closed Sump Discharge containment Yes (Valve Transfer WLS-PL-V057 YES Yes/Yes isolation valve - ORC Position) Closed

  • Excerpt from COL Appendix C Table 2.2.1-1